Sites M0001–M0004

Operations Mobilization of Vidar Viking, Aberdeen, Scotland The Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/drilling spread. By 26 July, all equipment for the...

Full description

Bibliographic Details
Main Authors: Backman, J., Moran, K., McInroy, D., Brinkhuis, H.K., Clemens, S., Cronin, T., Dickens, G.R., Eynaud, F., Gattacceca, J., Jakobsson, M., Jordan, R.W., Kaminski, M., King, J., Koç, N., Martinez, N.C., Matthiessen, J., Moore, T.C., Onodera, J., O'Regan, M., Pälike, H., Rea, B.R., Rio, D., Sakamoto, T., Smith, D.C., Stein, R., St. John, K.E.K., Suto, I., Suzuki, N., Takahashi, K., Watanabe, M., Yamamoto, M.
Other Authors: McInroy, D.B., Mayer, L.A.
Format: Conference Object
Language:English
Published: Integrated Ocean Drilling Program Management International, Inc 2006
Subjects:
Online Access:https://eprints.soton.ac.uk/41917/
https://eprints.soton.ac.uk/41917/1/302_104.PDF
http://www.ecord.org/exp/acex/vol302/EXP_REPT/CHAPTERS/302_104.PDF
id ftsouthampton:oai:eprints.soton.ac.uk:41917
record_format openpolar
spelling ftsouthampton:oai:eprints.soton.ac.uk:41917 2023-07-30T04:07:18+02:00 Sites M0001–M0004 Backman, J. Moran, K. McInroy, D. Brinkhuis, H.K. Clemens, S. Cronin, T. Dickens, G.R. Eynaud, F. Gattacceca, J. Jakobsson, M. Jordan, R.W. Kaminski, M. King, J. Koç, N. Martinez, N.C. Matthiessen, J. Moore, T.C. Onodera, J. O'Regan, M. Pälike, H. Rea, B.R. Rio, D. Sakamoto, T. Smith, D.C. Stein, R. St. John, K.E.K. Suto, I. Suzuki, N. Takahashi, K. Watanabe, M. Yamamoto, M. Backman, J. Moran, K. McInroy, D.B. Mayer, L.A. 2006-03-07 application/octet-stream https://eprints.soton.ac.uk/41917/ https://eprints.soton.ac.uk/41917/1/302_104.PDF http://www.ecord.org/exp/acex/vol302/EXP_REPT/CHAPTERS/302_104.PDF en eng Integrated Ocean Drilling Program Management International, Inc https://eprints.soton.ac.uk/41917/1/302_104.PDF Backman, J., Moran, K., McInroy, D., Brinkhuis, H.K., Clemens, S., Cronin, T., Dickens, G.R., Eynaud, F., Gattacceca, J., Jakobsson, M., Jordan, R.W., Kaminski, M., King, J., Koç, N., Martinez, N.C., Matthiessen, J., Moore, T.C., Onodera, J., O'Regan, M., Pälike, H., Rea, B.R., Rio, D., Sakamoto, T., Smith, D.C., Stein, R., St. John, K.E.K., Suto, I., Suzuki, N., Takahashi, K., Watanabe, M. and Yamamoto, M. (2006) Sites M0001–M0004. Backman, J., Moran, K., McInroy, D.B. and Mayer, L.A. (eds.) In Proceedings of the Integrated Ocean Drilling Program, Vol. 302. Integrated Ocean Drilling Program Management International, Inc. 169pp . (doi:10.2204/iodp.proc.302.104.2006 <http://dx.doi.org/10.2204/iodp.proc.302.104.2006>). Conference or Workshop Item PeerReviewed 2006 ftsouthampton https://doi.org/10.2204/iodp.proc.302.104.2006 2023-07-09T20:49:33Z Operations Mobilization of Vidar Viking, Aberdeen, Scotland The Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/drilling spread. By 26 July, all equipment for the Vidar Viking had arrived, including information technology equipment bound for the Oden. The derrick was load-tested and certified. The Vidar Viking took on a full complement of fuel at Aberdeen. Test Coring Site: Witch Ground, North Sea The Vidar Viking set sail for Landskrona, Sweden, on 28 July 2004. While the ship was en route, a first test of the drilling equipment was conducted in the Witch Ground area of the North Sea, ~8 h steam from Aberdeen. A test borehole was drilled in 152 m water depth to a depth of 37 meters below seafloor (mbsf) using the British Geological Survey's (BGS's) advanced piston corer (APC) and extended core barrel. Cores were obtained with both systems. The APC recovered >4 m in all runs (maximum = 4.5 m). The Vidar Viking left the test coring site at 1900 h on 30 July and proceeded to Landskrona. Meanwhile, mobilization of the Oden proceeded at Gothenburg, Sweden, which included loading the laboratory equipment. On the evening of 31 July, the Oden set sail for Tromsø, Norway. Mobilization of Vidar Viking, Landskrona, Sweden The Vidar Viking reached Landskrona on the morning of 1 August 2004. The stern notch, a 100 ton section required by the Vidar Viking when working in ice, and the helideck were installed. The remaining containers were loaded onto the deck, including the core and European Consortium for Ocean Research Drilling Science Operator curation containers sent from Bremen, Germany. Other mobilization work continued until the morning of 3 August, when the Vidar Viking departed for Tromsø. Mobilization of Vidar Viking and Oden, Tromsø, Norway The Oden arrived in Tromsø on the evening of 5 August 2004. The Vidar Viking arrived on the morning of 7 August. Two helicopters, required ... Conference Object Tromsø University of Southampton: e-Prints Soton Norway Tromsø
institution Open Polar
collection University of Southampton: e-Prints Soton
op_collection_id ftsouthampton
language English
description Operations Mobilization of Vidar Viking, Aberdeen, Scotland The Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/drilling spread. By 26 July, all equipment for the Vidar Viking had arrived, including information technology equipment bound for the Oden. The derrick was load-tested and certified. The Vidar Viking took on a full complement of fuel at Aberdeen. Test Coring Site: Witch Ground, North Sea The Vidar Viking set sail for Landskrona, Sweden, on 28 July 2004. While the ship was en route, a first test of the drilling equipment was conducted in the Witch Ground area of the North Sea, ~8 h steam from Aberdeen. A test borehole was drilled in 152 m water depth to a depth of 37 meters below seafloor (mbsf) using the British Geological Survey's (BGS's) advanced piston corer (APC) and extended core barrel. Cores were obtained with both systems. The APC recovered >4 m in all runs (maximum = 4.5 m). The Vidar Viking left the test coring site at 1900 h on 30 July and proceeded to Landskrona. Meanwhile, mobilization of the Oden proceeded at Gothenburg, Sweden, which included loading the laboratory equipment. On the evening of 31 July, the Oden set sail for Tromsø, Norway. Mobilization of Vidar Viking, Landskrona, Sweden The Vidar Viking reached Landskrona on the morning of 1 August 2004. The stern notch, a 100 ton section required by the Vidar Viking when working in ice, and the helideck were installed. The remaining containers were loaded onto the deck, including the core and European Consortium for Ocean Research Drilling Science Operator curation containers sent from Bremen, Germany. Other mobilization work continued until the morning of 3 August, when the Vidar Viking departed for Tromsø. Mobilization of Vidar Viking and Oden, Tromsø, Norway The Oden arrived in Tromsø on the evening of 5 August 2004. The Vidar Viking arrived on the morning of 7 August. Two helicopters, required ...
author2 Backman, J.
Moran, K.
McInroy, D.B.
Mayer, L.A.
format Conference Object
author Backman, J.
Moran, K.
McInroy, D.
Brinkhuis, H.K.
Clemens, S.
Cronin, T.
Dickens, G.R.
Eynaud, F.
Gattacceca, J.
Jakobsson, M.
Jordan, R.W.
Kaminski, M.
King, J.
Koç, N.
Martinez, N.C.
Matthiessen, J.
Moore, T.C.
Onodera, J.
O'Regan, M.
Pälike, H.
Rea, B.R.
Rio, D.
Sakamoto, T.
Smith, D.C.
Stein, R.
St. John, K.E.K.
Suto, I.
Suzuki, N.
Takahashi, K.
Watanabe, M.
Yamamoto, M.
spellingShingle Backman, J.
Moran, K.
McInroy, D.
Brinkhuis, H.K.
Clemens, S.
Cronin, T.
Dickens, G.R.
Eynaud, F.
Gattacceca, J.
Jakobsson, M.
Jordan, R.W.
Kaminski, M.
King, J.
Koç, N.
Martinez, N.C.
Matthiessen, J.
Moore, T.C.
Onodera, J.
O'Regan, M.
Pälike, H.
Rea, B.R.
Rio, D.
Sakamoto, T.
Smith, D.C.
Stein, R.
St. John, K.E.K.
Suto, I.
Suzuki, N.
Takahashi, K.
Watanabe, M.
Yamamoto, M.
Sites M0001–M0004
author_facet Backman, J.
Moran, K.
McInroy, D.
Brinkhuis, H.K.
Clemens, S.
Cronin, T.
Dickens, G.R.
Eynaud, F.
Gattacceca, J.
Jakobsson, M.
Jordan, R.W.
Kaminski, M.
King, J.
Koç, N.
Martinez, N.C.
Matthiessen, J.
Moore, T.C.
Onodera, J.
O'Regan, M.
Pälike, H.
Rea, B.R.
Rio, D.
Sakamoto, T.
Smith, D.C.
Stein, R.
St. John, K.E.K.
Suto, I.
Suzuki, N.
Takahashi, K.
Watanabe, M.
Yamamoto, M.
author_sort Backman, J.
title Sites M0001–M0004
title_short Sites M0001–M0004
title_full Sites M0001–M0004
title_fullStr Sites M0001–M0004
title_full_unstemmed Sites M0001–M0004
title_sort sites m0001–m0004
publisher Integrated Ocean Drilling Program Management International, Inc
publishDate 2006
url https://eprints.soton.ac.uk/41917/
https://eprints.soton.ac.uk/41917/1/302_104.PDF
http://www.ecord.org/exp/acex/vol302/EXP_REPT/CHAPTERS/302_104.PDF
geographic Norway
Tromsø
geographic_facet Norway
Tromsø
genre Tromsø
genre_facet Tromsø
op_relation https://eprints.soton.ac.uk/41917/1/302_104.PDF
Backman, J., Moran, K., McInroy, D., Brinkhuis, H.K., Clemens, S., Cronin, T., Dickens, G.R., Eynaud, F., Gattacceca, J., Jakobsson, M., Jordan, R.W., Kaminski, M., King, J., Koç, N., Martinez, N.C., Matthiessen, J., Moore, T.C., Onodera, J., O'Regan, M., Pälike, H., Rea, B.R., Rio, D., Sakamoto, T., Smith, D.C., Stein, R., St. John, K.E.K., Suto, I., Suzuki, N., Takahashi, K., Watanabe, M. and Yamamoto, M. (2006) Sites M0001–M0004. Backman, J., Moran, K., McInroy, D.B. and Mayer, L.A. (eds.) In Proceedings of the Integrated Ocean Drilling Program, Vol. 302. Integrated Ocean Drilling Program Management International, Inc. 169pp . (doi:10.2204/iodp.proc.302.104.2006 <http://dx.doi.org/10.2204/iodp.proc.302.104.2006>).
op_doi https://doi.org/10.2204/iodp.proc.302.104.2006
_version_ 1772820538826162176