Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment

The Natural Environment Research Council is partly funding the development and deployment of a scientific probe in the Antarctic subglacial Lake Ellsworth. The deployment will take place in 2013. This report aims to quantify the technical risks of the probe development, design and deployment. A high...

Full description

Bibliographic Details
Main Authors: Brito, M.P., Griffiths, G., Mowlem, M., Waugh, E., Saw, K., Wyatt, J.B., Tsaloglou, M-N., Fowler, L., Campbell, J., Rundle, N.
Format: Book
Language:English
Published: National Oceanography Centre 2011
Subjects:
Online Access:https://eprints.soton.ac.uk/187347/
https://eprints.soton.ac.uk/187347/1/NOC_R%2526C_03.pdf
id ftsouthampton:oai:eprints.soton.ac.uk:187347
record_format openpolar
spelling ftsouthampton:oai:eprints.soton.ac.uk:187347 2023-07-30T03:59:09+02:00 Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment Brito, M.P. Griffiths, G. Mowlem, M. Waugh, E. Saw, K. Wyatt, J.B. Tsaloglou, M-N. Fowler, L. Campbell, J. Rundle, N. 2011 text https://eprints.soton.ac.uk/187347/ https://eprints.soton.ac.uk/187347/1/NOC_R%2526C_03.pdf en eng National Oceanography Centre https://eprints.soton.ac.uk/187347/1/NOC_R%2526C_03.pdf Brito, M.P., Griffiths, G., Mowlem, M., Waugh, E., Saw, K., Wyatt, J.B., Tsaloglou, M-N., Fowler, L., Campbell, J. and Rundle, N. (2011) Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment (National Oceanography Centre Research and Consultancy Report, 3) Southampton, UK. National Oceanography Centre 40pp. Monograph NonPeerReviewed 2011 ftsouthampton 2023-07-09T21:21:55Z The Natural Environment Research Council is partly funding the development and deployment of a scientific probe in the Antarctic subglacial Lake Ellsworth. The deployment will take place in 2013. This report aims to quantify the technical risks of the probe development, design and deployment. A high level representation of the entire probe deployment process is captured in a Markov chain – a form of graphical probabilistic model. The transition from one state, or phase of the deployment, to the next depends on several factors, including: reliability of components and reliability of processes. We use fault trees to quantify the probability of failure of the complex processes that must take place to facilitate the transition from one state to another. The Shelf expert judgment elicitation package was followed to elicit expert judgments for the probability of failure for each failure mode. The top two technical risks are: • Failure to clean Jacket of the hot water drill hose: 95% quantile at 0.96. • Probe electronic failure: 95% quantile at 0.11. Here, the top failure mode is optical connector failure. The Markov chain was used to estimate the availability of the probe from different phases of the deployment. • From on-site probe cleaning: 95% confidence that the probability of success is higher than 0.7. • From on-site testing: 95% confidence that the probability of success is higher than 0.73. • From sheave deployment: 95% confidence that the probability of success if higher than 0.83. • From probe positioning: 95% confidence that the probability of success is higher than 0.90. Finally, the probability of a successful probe deployment following the probe pre-deployment is greater than 0.87, with 95% confidence. Book Antarc* Antarctic University of Southampton: e-Prints Soton Antarctic The Antarctic
institution Open Polar
collection University of Southampton: e-Prints Soton
op_collection_id ftsouthampton
language English
description The Natural Environment Research Council is partly funding the development and deployment of a scientific probe in the Antarctic subglacial Lake Ellsworth. The deployment will take place in 2013. This report aims to quantify the technical risks of the probe development, design and deployment. A high level representation of the entire probe deployment process is captured in a Markov chain – a form of graphical probabilistic model. The transition from one state, or phase of the deployment, to the next depends on several factors, including: reliability of components and reliability of processes. We use fault trees to quantify the probability of failure of the complex processes that must take place to facilitate the transition from one state to another. The Shelf expert judgment elicitation package was followed to elicit expert judgments for the probability of failure for each failure mode. The top two technical risks are: • Failure to clean Jacket of the hot water drill hose: 95% quantile at 0.96. • Probe electronic failure: 95% quantile at 0.11. Here, the top failure mode is optical connector failure. The Markov chain was used to estimate the availability of the probe from different phases of the deployment. • From on-site probe cleaning: 95% confidence that the probability of success is higher than 0.7. • From on-site testing: 95% confidence that the probability of success is higher than 0.73. • From sheave deployment: 95% confidence that the probability of success if higher than 0.83. • From probe positioning: 95% confidence that the probability of success is higher than 0.90. Finally, the probability of a successful probe deployment following the probe pre-deployment is greater than 0.87, with 95% confidence.
format Book
author Brito, M.P.
Griffiths, G.
Mowlem, M.
Waugh, E.
Saw, K.
Wyatt, J.B.
Tsaloglou, M-N.
Fowler, L.
Campbell, J.
Rundle, N.
spellingShingle Brito, M.P.
Griffiths, G.
Mowlem, M.
Waugh, E.
Saw, K.
Wyatt, J.B.
Tsaloglou, M-N.
Fowler, L.
Campbell, J.
Rundle, N.
Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
author_facet Brito, M.P.
Griffiths, G.
Mowlem, M.
Waugh, E.
Saw, K.
Wyatt, J.B.
Tsaloglou, M-N.
Fowler, L.
Campbell, J.
Rundle, N.
author_sort Brito, M.P.
title Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
title_short Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
title_full Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
title_fullStr Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
title_full_unstemmed Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment
title_sort reliability case notes no. 6. risk assessment of the ellsworth probe: development, design and deployment
publisher National Oceanography Centre
publishDate 2011
url https://eprints.soton.ac.uk/187347/
https://eprints.soton.ac.uk/187347/1/NOC_R%2526C_03.pdf
geographic Antarctic
The Antarctic
geographic_facet Antarctic
The Antarctic
genre Antarc*
Antarctic
genre_facet Antarc*
Antarctic
op_relation https://eprints.soton.ac.uk/187347/1/NOC_R%2526C_03.pdf
Brito, M.P., Griffiths, G., Mowlem, M., Waugh, E., Saw, K., Wyatt, J.B., Tsaloglou, M-N., Fowler, L., Campbell, J. and Rundle, N. (2011) Reliability Case Notes No. 6. Risk assessment of the Ellsworth probe: development, design and deployment (National Oceanography Centre Research and Consultancy Report, 3) Southampton, UK. National Oceanography Centre 40pp.
_version_ 1772809871557656576