Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level

Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This M.Sc. thesis deals with the problem of determining the appropriate installed capacity for a specific hydro power plant development project, based on available hydrological measurements. This is important in order to maxim...

Full description

Bibliographic Details
Main Author: Ólafur Jónsson
Other Authors: Háskólinn á Akureyri
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/1946/7747
id ftskemman:oai:skemman.is:1946/7747
record_format openpolar
spelling ftskemman:oai:skemman.is:1946/7747 2023-05-15T13:08:33+02:00 Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level Ólafur Jónsson Háskólinn á Akureyri 2011-02 application/pdf http://hdl.handle.net/1946/7747 en eng http://hdl.handle.net/1946/7747 RES. The School for Renewable Energy Science Renewable energy sources Meistaraprófsritgerðir Orkumál Vatnsaflsvirkjanir Thesis Master's 2011 ftskemman 2022-12-11T06:51:47Z Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This M.Sc. thesis deals with the problem of determining the appropriate installed capacity for a specific hydro power plant development project, based on available hydrological measurements. This is important in order to maximize a return on investment for the project. Investment costs are not covered in this project. To accomplish a determination, a model was constructed to emulate the inflow and reservoir capability to produce power. The inflow data was analyzed using statistical measures and reservoir routing simulations. This gave indications on the current available flow of water and flow predictions for the future. A hypothetical power intensive customer was defined to control the energy demand in the system. Losses in waterways were worked out for different flow and water surface level in the reservoir. The model was then used to run iterative simulations for different values of installed capacity to find total revenue per year from sold energy and to record the results. Graphing the results clearly shows a peak were total revenue is maximized and indicates a recommended installed capacity of 58,8 [MW] for the way this scenario was set up. The results from this project have been verified against numbers at the same project location but done by the National Energy Authority in Iceland. This shows that the difference in total energy capability per year of these two compared results is within ~5% variance. Landsvirkjun Thesis Akureyri Akureyri Akureyri Iceland Skemman (Iceland) Akureyri
institution Open Polar
collection Skemman (Iceland)
op_collection_id ftskemman
language English
topic RES. The School for Renewable Energy Science
Renewable energy sources
Meistaraprófsritgerðir
Orkumál
Vatnsaflsvirkjanir
spellingShingle RES. The School for Renewable Energy Science
Renewable energy sources
Meistaraprófsritgerðir
Orkumál
Vatnsaflsvirkjanir
Ólafur Jónsson
Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
topic_facet RES. The School for Renewable Energy Science
Renewable energy sources
Meistaraprófsritgerðir
Orkumál
Vatnsaflsvirkjanir
description Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This M.Sc. thesis deals with the problem of determining the appropriate installed capacity for a specific hydro power plant development project, based on available hydrological measurements. This is important in order to maximize a return on investment for the project. Investment costs are not covered in this project. To accomplish a determination, a model was constructed to emulate the inflow and reservoir capability to produce power. The inflow data was analyzed using statistical measures and reservoir routing simulations. This gave indications on the current available flow of water and flow predictions for the future. A hypothetical power intensive customer was defined to control the energy demand in the system. Losses in waterways were worked out for different flow and water surface level in the reservoir. The model was then used to run iterative simulations for different values of installed capacity to find total revenue per year from sold energy and to record the results. Graphing the results clearly shows a peak were total revenue is maximized and indicates a recommended installed capacity of 58,8 [MW] for the way this scenario was set up. The results from this project have been verified against numbers at the same project location but done by the National Energy Authority in Iceland. This shows that the difference in total energy capability per year of these two compared results is within ~5% variance. Landsvirkjun
author2 Háskólinn á Akureyri
format Thesis
author Ólafur Jónsson
author_facet Ólafur Jónsson
author_sort Ólafur Jónsson
title Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
title_short Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
title_full Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
title_fullStr Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
title_full_unstemmed Hólmsá HEP : recommendations for installed capacity based on simulation of energy generation and reservoir level
title_sort hólmsá hep : recommendations for installed capacity based on simulation of energy generation and reservoir level
publishDate 2011
url http://hdl.handle.net/1946/7747
geographic Akureyri
geographic_facet Akureyri
genre Akureyri
Akureyri
Akureyri
Iceland
genre_facet Akureyri
Akureyri
Akureyri
Iceland
op_relation http://hdl.handle.net/1946/7747
_version_ 1766096894383095808