Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost

Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This research is in the field of Project Management and it examines the process leading to the development of a Cost Estimate. The focus of the research is on the application of the tools and techniques that are part of the co...

Full description

Bibliographic Details
Main Author: Viðar Helgason
Other Authors: Háskólinn á Akureyri
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/1946/7693
id ftskemman:oai:skemman.is:1946/7693
record_format openpolar
spelling ftskemman:oai:skemman.is:1946/7693 2023-05-15T13:08:37+02:00 Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost Viðar Helgason Háskólinn á Akureyri 2011-01 application/pdf http://hdl.handle.net/1946/7693 en eng http://hdl.handle.net/1946/7693 RES. The School for Renewable Energy Science Renewable energy source Meistaraprófsritgerðir Orkumál Virkjanir Kostnaðaráætlanir Thesis Master's 2011 ftskemman 2022-12-11T06:57:25Z Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This research is in the field of Project Management and it examines the process leading to the development of a Cost Estimate. The focus of the research is on the application of the tools and techniques that are part of the cost definition process. Consideration is given to what methodology is applied for the development of a Cost Estimate. Purpose – This research aims to document the current status of Project Cost Estimation within Landsvirkjun. The research also documents best practice in relation to Project Cost Estimation. Approach – To begin with, a literature review was performed where best practice for defining Project Cost was established. The review covered Project Management technics used for Private and Public Project Management. Next, a case study of available documents from Landsvirkjun was performed. It was intended to explain how cost estimation was performed by the company. Finally, another case study was performed were the subject for review was Small Hydropower Plant projects. The case study finding helped document current definitions and main cost elements of such projects. Findings – Regarding Landsvirkjun, it was concluded that more information was needed to make any definite conclusions regarding the management of project in connection to cost estimation. However it was possible to state what methods were applied to estimate cost, as well as issues regarding the WBS, Risk Management and contingency were identified. For Small Hydropower Plants (SHP), the definition of such project was clarified and as a result a classification system for SHP projects in Iceland was proposed. The main cost elements of SHP project were also discussed and the main categorise identified. Finally a CBS for small hydro was proposed. Key words – Landsvirkjun/ Energy Framer/ Cost Estimation/ WBS/ Contingency. Thesis Akureyri Akureyri Akureyri Iceland Skemman (Iceland) Akureyri
institution Open Polar
collection Skemman (Iceland)
op_collection_id ftskemman
language English
topic RES. The School for Renewable Energy Science
Renewable energy source
Meistaraprófsritgerðir
Orkumál
Virkjanir
Kostnaðaráætlanir
spellingShingle RES. The School for Renewable Energy Science
Renewable energy source
Meistaraprófsritgerðir
Orkumál
Virkjanir
Kostnaðaráætlanir
Viðar Helgason
Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
topic_facet RES. The School for Renewable Energy Science
Renewable energy source
Meistaraprófsritgerðir
Orkumál
Virkjanir
Kostnaðaráætlanir
description Verkefnið er unnið í tengslum við Háskóla Íslands og Háskólann á Akureyri This research is in the field of Project Management and it examines the process leading to the development of a Cost Estimate. The focus of the research is on the application of the tools and techniques that are part of the cost definition process. Consideration is given to what methodology is applied for the development of a Cost Estimate. Purpose – This research aims to document the current status of Project Cost Estimation within Landsvirkjun. The research also documents best practice in relation to Project Cost Estimation. Approach – To begin with, a literature review was performed where best practice for defining Project Cost was established. The review covered Project Management technics used for Private and Public Project Management. Next, a case study of available documents from Landsvirkjun was performed. It was intended to explain how cost estimation was performed by the company. Finally, another case study was performed were the subject for review was Small Hydropower Plant projects. The case study finding helped document current definitions and main cost elements of such projects. Findings – Regarding Landsvirkjun, it was concluded that more information was needed to make any definite conclusions regarding the management of project in connection to cost estimation. However it was possible to state what methods were applied to estimate cost, as well as issues regarding the WBS, Risk Management and contingency were identified. For Small Hydropower Plants (SHP), the definition of such project was clarified and as a result a classification system for SHP projects in Iceland was proposed. The main cost elements of SHP project were also discussed and the main categorise identified. Finally a CBS for small hydro was proposed. Key words – Landsvirkjun/ Energy Framer/ Cost Estimation/ WBS/ Contingency.
author2 Háskólinn á Akureyri
format Thesis
author Viðar Helgason
author_facet Viðar Helgason
author_sort Viðar Helgason
title Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
title_short Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
title_full Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
title_fullStr Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
title_full_unstemmed Landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
title_sort landsvirkjun cost estimating and assessment for small hydropower plants : methodology and basis for estimating cost
publishDate 2011
url http://hdl.handle.net/1946/7693
geographic Akureyri
geographic_facet Akureyri
genre Akureyri
Akureyri
Akureyri
Iceland
genre_facet Akureyri
Akureyri
Akureyri
Iceland
op_relation http://hdl.handle.net/1946/7693
_version_ 1766103170170224640