Optimized billet-production scheduling for an aluminium casting house

This research investigates the potential of time savings in the production process of an aluminium smelter in Iceland, i.e. the Rio Tinto Alcan aluminium smelter called ISAL. The focus was on the casting house. A mixed integer linear optimization model was developed to propose the optimal production...

Full description

Bibliographic Details
Main Author: Garðar Ingi Reynisson 1987-
Other Authors: Háskólinn í Reykjavík
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://hdl.handle.net/1946/28775
_version_ 1821557095755939840
author Garðar Ingi Reynisson 1987-
author2 Háskólinn í Reykjavík
author_facet Garðar Ingi Reynisson 1987-
author_sort Garðar Ingi Reynisson 1987-
collection Skemman (Iceland)
description This research investigates the potential of time savings in the production process of an aluminium smelter in Iceland, i.e. the Rio Tinto Alcan aluminium smelter called ISAL. The focus was on the casting house. A mixed integer linear optimization model was developed to propose the optimal production schedule for each production week, based on the customer's demands. The model minimizes the mould exchanges for the casting machines and controls the mass of raw material in each production period by using chemical analysis. It was essential to track the usage of raw material because the furnaces cannot be emptied completely in each period and there are always some residues left in the furnaces. The ingredients of each cast must fit between certain upper and lower limits of each element to fulfil quality standards. Given that fact, it's essential to consider the residues in the furnace where upcoming alloy is fabricated. Otherwise the cast is ruined. The model was tested for two different production weeks from 2016. The first week can be considered as a typical production week but the latter is more challenging. The optimization model was able to return an applicable production schedule for the first week but the production schedule for the latter week was very close being applicable. % for both cases. Í þessu verkefni var kannað hvort hægt væri að ná fram tímasparnaði í framleiðsluferli Álversins í Straumsvík, nánar tiltekið innan steypuskálans. Þróað var línulegt bestunarlíkan, þ.e. blandað heiltölulíkan, til þess að reikna út hagstæðasta framleiðsluskipulag fyrir hverja framleiðsluviku. Líkanið tekur inn pantanir fyrir heila framleiðsluviku og skilar uppröðun af hagstæðasta framleiðsluskipulagi. Bestunarlíkanið lágmarkar heildarfjölda mótaskipta í hverri framleiðsluviku ásamt því að stýra hráefnisnotkun við framleiðsluna með efnagreiningu. Nauðsynlegt þótti að taka sérstakt tillit til hráefnisnotkunarinnar vegna þess að ekki er hægt að tæma allt innihald úr íblöndunarofnunum í hverri framleiðslulotu. Þar af ...
format Thesis
genre Iceland
genre_facet Iceland
id ftskemman:oai:skemman.is:1946/28775
institution Open Polar
language English
op_collection_id ftskemman
op_relation http://hdl.handle.net/1946/28775
publishDate 2017
record_format openpolar
spelling ftskemman:oai:skemman.is:1946/28775 2025-01-16T22:40:26+00:00 Optimized billet-production scheduling for an aluminium casting house Garðar Ingi Reynisson 1987- Háskólinn í Reykjavík 2017-05 application/pdf http://hdl.handle.net/1946/28775 en eng http://hdl.handle.net/1946/28775 Rekstrarverkfræði Framleiðslustjórnun Bestun Álframleiðsla Tækni- og verkfræðideild Meistaraprófsritgerðir Engineering management Production management Optimization Aluminum School of Science and Engineering Thesis Master's 2017 ftskemman 2022-12-11T06:55:00Z This research investigates the potential of time savings in the production process of an aluminium smelter in Iceland, i.e. the Rio Tinto Alcan aluminium smelter called ISAL. The focus was on the casting house. A mixed integer linear optimization model was developed to propose the optimal production schedule for each production week, based on the customer's demands. The model minimizes the mould exchanges for the casting machines and controls the mass of raw material in each production period by using chemical analysis. It was essential to track the usage of raw material because the furnaces cannot be emptied completely in each period and there are always some residues left in the furnaces. The ingredients of each cast must fit between certain upper and lower limits of each element to fulfil quality standards. Given that fact, it's essential to consider the residues in the furnace where upcoming alloy is fabricated. Otherwise the cast is ruined. The model was tested for two different production weeks from 2016. The first week can be considered as a typical production week but the latter is more challenging. The optimization model was able to return an applicable production schedule for the first week but the production schedule for the latter week was very close being applicable. % for both cases. Í þessu verkefni var kannað hvort hægt væri að ná fram tímasparnaði í framleiðsluferli Álversins í Straumsvík, nánar tiltekið innan steypuskálans. Þróað var línulegt bestunarlíkan, þ.e. blandað heiltölulíkan, til þess að reikna út hagstæðasta framleiðsluskipulag fyrir hverja framleiðsluviku. Líkanið tekur inn pantanir fyrir heila framleiðsluviku og skilar uppröðun af hagstæðasta framleiðsluskipulagi. Bestunarlíkanið lágmarkar heildarfjölda mótaskipta í hverri framleiðsluviku ásamt því að stýra hráefnisnotkun við framleiðsluna með efnagreiningu. Nauðsynlegt þótti að taka sérstakt tillit til hráefnisnotkunarinnar vegna þess að ekki er hægt að tæma allt innihald úr íblöndunarofnunum í hverri framleiðslulotu. Þar af ... Thesis Iceland Skemman (Iceland)
spellingShingle Rekstrarverkfræði
Framleiðslustjórnun
Bestun
Álframleiðsla
Tækni- og verkfræðideild
Meistaraprófsritgerðir
Engineering management
Production management
Optimization
Aluminum
School of Science and Engineering
Garðar Ingi Reynisson 1987-
Optimized billet-production scheduling for an aluminium casting house
title Optimized billet-production scheduling for an aluminium casting house
title_full Optimized billet-production scheduling for an aluminium casting house
title_fullStr Optimized billet-production scheduling for an aluminium casting house
title_full_unstemmed Optimized billet-production scheduling for an aluminium casting house
title_short Optimized billet-production scheduling for an aluminium casting house
title_sort optimized billet-production scheduling for an aluminium casting house
topic Rekstrarverkfræði
Framleiðslustjórnun
Bestun
Álframleiðsla
Tækni- og verkfræðideild
Meistaraprófsritgerðir
Engineering management
Production management
Optimization
Aluminum
School of Science and Engineering
topic_facet Rekstrarverkfræði
Framleiðslustjórnun
Bestun
Álframleiðsla
Tækni- og verkfræðideild
Meistaraprófsritgerðir
Engineering management
Production management
Optimization
Aluminum
School of Science and Engineering
url http://hdl.handle.net/1946/28775