Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County
The Texas Department of Transportation proposes to widen United States Highway (US) 79 from approximately 0.3 miles (0.5 kilometers) west of Interstate Highway (IH) 45 to approximately 0.5 miles (0.8 kilometers) west of Farm-to-Market Road (FM) 1512 in Leon County, Texas. The project extends from th...
Main Author: | |
---|---|
Format: | Text |
Language: | unknown |
Published: |
SFA ScholarWorks
2020
|
Subjects: | |
Online Access: | https://scholarworks.sfasu.edu/ita/vol2020/iss1/108 https://scholarworks.sfasu.edu/cgi/viewcontent.cgi?article=4910&context=ita |
id |
ftsfstateaustin:oai:scholarworks.sfasu.edu:ita-4910 |
---|---|
record_format |
openpolar |
institution |
Open Polar |
collection |
Stephen F. Austin State University, Texas: Scholar Works @ SFA |
op_collection_id |
ftsfstateaustin |
language |
unknown |
topic |
Texas Archaeology Leon County American Material Culture American Studies Anthropology Archaeological Anthropology Environmental Studies History History of Art Architecture and Archaeology Other American Studies Other Arts and Humanities Other History of Art United States History |
spellingShingle |
Texas Archaeology Leon County American Material Culture American Studies Anthropology Archaeological Anthropology Environmental Studies History History of Art Architecture and Archaeology Other American Studies Other Arts and Humanities Other History of Art United States History Moore, Scotty Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
topic_facet |
Texas Archaeology Leon County American Material Culture American Studies Anthropology Archaeological Anthropology Environmental Studies History History of Art Architecture and Archaeology Other American Studies Other Arts and Humanities Other History of Art United States History |
description |
The Texas Department of Transportation proposes to widen United States Highway (US) 79 from approximately 0.3 miles (0.5 kilometers) west of Interstate Highway (IH) 45 to approximately 0.5 miles (0.8 kilometers) west of Farm-to-Market Road (FM) 1512 in Leon County, Texas. The project extends from the town of Buffalo to just west of the town of Jewett. Proposed improvements include the widening of the existing two-lane US 79 roadway to a four-lane divided highway. The proposed project is approximately 10.3 miles (16.6 kilometers) long and has a typical width of roughly 200 to 315 feet (61.0 to 96.0 meters), covering a total of 366.29 acres. The proposed project’s overall acreage includes 138.13 acres of existing right-of-way, 219.56 acres of proposed new right-of-way, 8.33 acres of proposed temporary construction license or temporary drainage easements, and 2.06 acres of proposed detention ponds. This project’s archeological area of potential effect (APE) is defined as the 366.29-acre overall footprint of proposed improvements. Maximum depth of impacts is expected to be less than 3.28 feet (1 meter) across the majority of APE, with deeper impacts expected at drainage crossings. The deepest impacts are expected adjacent to Tape Creek (approximately 13.0 feet [4.0 meters] and within two proposed detention pond locations (anticipated depth currently unknown). In March 2020, an intensive archeological survey was completed in order to inventory and evaluate archeological resources within the footprint of the proposed project to support compliance with the National Historic Preservation Act, as amended and the Antiquities Code of Texas. Survey was conducted within all existing right-of-way (138.13 acres) and within all parcels for which right-of-entry was given (approximately 102.84 acres). Many properties for which access was denied or for which there was no response to an access request were examined from adjacent properties or the current right-of-way. In all, 226 shovel test units and one backhoe trench were excavated within the APE; none of these excavations uncovered archeological materials of any age. One new archeological site, 41LN525, one isolated locality, and two isolated finds were recorded on the ground surface; none were associated with buried cultural resources. Field Site 01 lacks association with important people or events and lacks research potential; as a result, it is recommended ineligible for inclusion on the National Register of Historic Places. The isolated locality and isolated finds are, by definition, ineligible for inclusion on the National Register. For areas and parcels covered by survey or cleared from adjacent parcels, CMEC recommends that no further archeological investigations are warranted prior to construction activities. However, CMEC recommends that archeological survey be conducted across all portions of the proposed APE that were not subjected to survey or cleared from adjacent parcels, which cover an approximate total of 125.05 acres. The Texas Department of Transportation (TxDOT) proposes to widen United States Highway (US) 79 from approximately 0.3 miles (0.5 kilometers) west of Interstate Highway (IH) 45 to approximately 0.5 miles (0.8 kilometers) west of Farm-to-Market Road (FM) 1512 in Leon County, Texas. The proposed project is approximately 10.3 miles (16.6 kilometers) long and has a typical width of roughly 200 to 315 feet (61.0 to 96.0 meters), covering a total of 366.29 acres. This project’s archeological area of potential effect (APE) is defined as the entire 366.29-acre overall footprint of proposed improvements. The proposed project’s overall acreage includes 138.13 acres of existing right-of-way, 219.56 acres of proposed new right-of-way, 8.33 acres of proposed temporary construction license or temporary drainage easements, and 2.06 acres of proposed detention ponds. Maximum depth of impacts is expected to be less than 3.28 feet (1 meter) across the majority of APE, with deeper impacts expected at drainage crossings. The deepest impacts are expected adjacent to Tape Creek (approximately 13.0 feet [4.0 meters] and within two proposed detention pond locations (anticipated depth currently unknown). On March 9–13, 2020, an intensive archeological survey was completed in order to inventory and evaluate archeological resources within the footprint of proposed project to support compliance with the National Historic Preservation Act, as amended and the Antiquities Code of Texas. The fieldwork was carried out under Texas Antiquities Permit 9288 by Scotty Moore (Principal Investigator), Austin Blase, and Dietrich Geitz of Cox|McLain Environmental Consulting, Inc. (CMEC). Survey was conducted within all existing right-of-way locations (138.13 acres) and within all parcels for which right-of-entry was given (approximately 102.84 acres). Many properties for which access was denied or for which there was no response to an access request were examined from adjacent properties or the current right-of-way. In all, 226 shovel test units and one backhoe trench were excavated within the APE; none of these excavations uncovered archeological materials of any age. Much of the APE was determined to have been disturbed by construction and maintenance of the existing US 79 roadway and associated driveways, buried utilities, commercial and residential development, and water management features. These disturbances have greatly reduced the potential for intact archeological deposits throughout the APE. However, CMEC recommends that archeological survey be conducted across all portions of the proposed APE that were not subjected to survey (approximately 125.05 acres) due to lack of entry. If conditions allow and nearby soils are of sufficient depth, mechanical trenching at any currently inaccessible drainage crossings bounded by Holocene-age alluvium deeper than one meter (3.2 feet) should be undertaken. One new archeological site, one isolated locality, and two isolated finds were recorded on the APE’s ground surface during the survey; however, no artifacts were collected. Therefore, only project records will need to be curated per TAC 26.16 and 26.17. Project records will be permanently housed at the Center for Archaeological Studies at Texas State University. If any unanticipated cultural materials or deposits are found at any stage of clearing, preparation, or construction, the work should cease in that area and TxDOT personnel should be notified immediately. During evaluation of any unanticipated finds and coordination between TxDOT and the Texas Historical Commission, clearing, preparation, and/or construction could continue in any other areas along the corridor where no such deposits or materials are observed. The Texas Historical Commission concurred with all recommendations on May 18, 2020. |
format |
Text |
author |
Moore, Scotty |
author_facet |
Moore, Scotty |
author_sort |
Moore, Scotty |
title |
Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
title_short |
Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
title_full |
Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
title_fullStr |
Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
title_full_unstemmed |
Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County |
title_sort |
intensive archeological survey for proposed improvements to us highway 79 from west of interstate 45 to west of fm 1512 leon county |
publisher |
SFA ScholarWorks |
publishDate |
2020 |
url |
https://scholarworks.sfasu.edu/ita/vol2020/iss1/108 https://scholarworks.sfasu.edu/cgi/viewcontent.cgi?article=4910&context=ita |
long_lat |
ENVELOPE(-59.517,-59.517,-62.500,-62.500) ENVELOPE(78.139,78.139,-68.582,-68.582) |
geographic |
Austin Tac The Corridor |
geographic_facet |
Austin Tac The Corridor |
genre |
Archeological Survey |
genre_facet |
Archeological Survey |
op_source |
Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State |
op_relation |
https://scholarworks.sfasu.edu/ita/vol2020/iss1/108 https://scholarworks.sfasu.edu/cgi/viewcontent.cgi?article=4910&context=ita |
op_rights |
http://creativecommons.org/licenses/by/4.0/ |
op_rightsnorm |
CC-BY |
_version_ |
1766289625461030912 |
spelling |
ftsfstateaustin:oai:scholarworks.sfasu.edu:ita-4910 2023-05-15T14:17:44+02:00 Intensive Archeological Survey for Proposed Improvements to US Highway 79 from West of Interstate 45 to West of FM 1512 Leon County Moore, Scotty 2020-01-01T08:00:00Z application/pdf https://scholarworks.sfasu.edu/ita/vol2020/iss1/108 https://scholarworks.sfasu.edu/cgi/viewcontent.cgi?article=4910&context=ita unknown SFA ScholarWorks https://scholarworks.sfasu.edu/ita/vol2020/iss1/108 https://scholarworks.sfasu.edu/cgi/viewcontent.cgi?article=4910&context=ita http://creativecommons.org/licenses/by/4.0/ CC-BY Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State Texas Archaeology Leon County American Material Culture American Studies Anthropology Archaeological Anthropology Environmental Studies History History of Art Architecture and Archaeology Other American Studies Other Arts and Humanities Other History of Art United States History text 2020 ftsfstateaustin 2022-03-24T20:31:26Z The Texas Department of Transportation proposes to widen United States Highway (US) 79 from approximately 0.3 miles (0.5 kilometers) west of Interstate Highway (IH) 45 to approximately 0.5 miles (0.8 kilometers) west of Farm-to-Market Road (FM) 1512 in Leon County, Texas. The project extends from the town of Buffalo to just west of the town of Jewett. Proposed improvements include the widening of the existing two-lane US 79 roadway to a four-lane divided highway. The proposed project is approximately 10.3 miles (16.6 kilometers) long and has a typical width of roughly 200 to 315 feet (61.0 to 96.0 meters), covering a total of 366.29 acres. The proposed project’s overall acreage includes 138.13 acres of existing right-of-way, 219.56 acres of proposed new right-of-way, 8.33 acres of proposed temporary construction license or temporary drainage easements, and 2.06 acres of proposed detention ponds. This project’s archeological area of potential effect (APE) is defined as the 366.29-acre overall footprint of proposed improvements. Maximum depth of impacts is expected to be less than 3.28 feet (1 meter) across the majority of APE, with deeper impacts expected at drainage crossings. The deepest impacts are expected adjacent to Tape Creek (approximately 13.0 feet [4.0 meters] and within two proposed detention pond locations (anticipated depth currently unknown). In March 2020, an intensive archeological survey was completed in order to inventory and evaluate archeological resources within the footprint of the proposed project to support compliance with the National Historic Preservation Act, as amended and the Antiquities Code of Texas. Survey was conducted within all existing right-of-way (138.13 acres) and within all parcels for which right-of-entry was given (approximately 102.84 acres). Many properties for which access was denied or for which there was no response to an access request were examined from adjacent properties or the current right-of-way. In all, 226 shovel test units and one backhoe trench were excavated within the APE; none of these excavations uncovered archeological materials of any age. One new archeological site, 41LN525, one isolated locality, and two isolated finds were recorded on the ground surface; none were associated with buried cultural resources. Field Site 01 lacks association with important people or events and lacks research potential; as a result, it is recommended ineligible for inclusion on the National Register of Historic Places. The isolated locality and isolated finds are, by definition, ineligible for inclusion on the National Register. For areas and parcels covered by survey or cleared from adjacent parcels, CMEC recommends that no further archeological investigations are warranted prior to construction activities. However, CMEC recommends that archeological survey be conducted across all portions of the proposed APE that were not subjected to survey or cleared from adjacent parcels, which cover an approximate total of 125.05 acres. The Texas Department of Transportation (TxDOT) proposes to widen United States Highway (US) 79 from approximately 0.3 miles (0.5 kilometers) west of Interstate Highway (IH) 45 to approximately 0.5 miles (0.8 kilometers) west of Farm-to-Market Road (FM) 1512 in Leon County, Texas. The proposed project is approximately 10.3 miles (16.6 kilometers) long and has a typical width of roughly 200 to 315 feet (61.0 to 96.0 meters), covering a total of 366.29 acres. This project’s archeological area of potential effect (APE) is defined as the entire 366.29-acre overall footprint of proposed improvements. The proposed project’s overall acreage includes 138.13 acres of existing right-of-way, 219.56 acres of proposed new right-of-way, 8.33 acres of proposed temporary construction license or temporary drainage easements, and 2.06 acres of proposed detention ponds. Maximum depth of impacts is expected to be less than 3.28 feet (1 meter) across the majority of APE, with deeper impacts expected at drainage crossings. The deepest impacts are expected adjacent to Tape Creek (approximately 13.0 feet [4.0 meters] and within two proposed detention pond locations (anticipated depth currently unknown). On March 9–13, 2020, an intensive archeological survey was completed in order to inventory and evaluate archeological resources within the footprint of proposed project to support compliance with the National Historic Preservation Act, as amended and the Antiquities Code of Texas. The fieldwork was carried out under Texas Antiquities Permit 9288 by Scotty Moore (Principal Investigator), Austin Blase, and Dietrich Geitz of Cox|McLain Environmental Consulting, Inc. (CMEC). Survey was conducted within all existing right-of-way locations (138.13 acres) and within all parcels for which right-of-entry was given (approximately 102.84 acres). Many properties for which access was denied or for which there was no response to an access request were examined from adjacent properties or the current right-of-way. In all, 226 shovel test units and one backhoe trench were excavated within the APE; none of these excavations uncovered archeological materials of any age. Much of the APE was determined to have been disturbed by construction and maintenance of the existing US 79 roadway and associated driveways, buried utilities, commercial and residential development, and water management features. These disturbances have greatly reduced the potential for intact archeological deposits throughout the APE. However, CMEC recommends that archeological survey be conducted across all portions of the proposed APE that were not subjected to survey (approximately 125.05 acres) due to lack of entry. If conditions allow and nearby soils are of sufficient depth, mechanical trenching at any currently inaccessible drainage crossings bounded by Holocene-age alluvium deeper than one meter (3.2 feet) should be undertaken. One new archeological site, one isolated locality, and two isolated finds were recorded on the APE’s ground surface during the survey; however, no artifacts were collected. Therefore, only project records will need to be curated per TAC 26.16 and 26.17. Project records will be permanently housed at the Center for Archaeological Studies at Texas State University. If any unanticipated cultural materials or deposits are found at any stage of clearing, preparation, or construction, the work should cease in that area and TxDOT personnel should be notified immediately. During evaluation of any unanticipated finds and coordination between TxDOT and the Texas Historical Commission, clearing, preparation, and/or construction could continue in any other areas along the corridor where no such deposits or materials are observed. The Texas Historical Commission concurred with all recommendations on May 18, 2020. Text Archeological Survey Stephen F. Austin State University, Texas: Scholar Works @ SFA Austin Tac ENVELOPE(-59.517,-59.517,-62.500,-62.500) The Corridor ENVELOPE(78.139,78.139,-68.582,-68.582) |