Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK

The feasibility of the project called IceLink is now being examined, which entails laying 800¨C1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable...

Full description

Bibliographic Details
Main Authors: Daisuke Sasaki, Mikiyasu Nakayama
Format: Article in Journal/Newspaper
Language:unknown
Subjects:
Online Access:http://redfame.com/journal/index.php/bms/article/view/1518/1697
http://redfame.com/journal/index.php/bms/article/view/1518
id ftrepec:oai:RePEc:rfa:bmsjnl:v:2:y:2016:i:2:p:14-20
record_format openpolar
spelling ftrepec:oai:RePEc:rfa:bmsjnl:v:2:y:2016:i:2:p:14-20 2023-05-15T16:51:31+02:00 Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK Daisuke Sasaki Mikiyasu Nakayama http://redfame.com/journal/index.php/bms/article/view/1518/1697 http://redfame.com/journal/index.php/bms/article/view/1518 unknown http://redfame.com/journal/index.php/bms/article/view/1518/1697 http://redfame.com/journal/index.php/bms/article/view/1518 article ftrepec 2020-12-04T13:36:26Z The feasibility of the project called IceLink is now being examined, which entails laying 800¨C1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable energy sources, though there exists a relatively high degree of potential risks (e.g., financial risk due to the lingering affect of the financial crisis). This study aims to examine the effectiveness of public financial support for the project by using a quantitative analysis as well as discussing public financial support as a possible measure to fill the viability gap. The simulation results imply that the project is unfeasible unless there is public financial support. In the light of the public nature of the project and its promotion of green power, public financial support may be acceptable. It can thus be said that public financial support will be effective for this project. Also, the sensitivity analysis results show break-even points for three major parameters:¡ªWACC, wholesale power price, and CAPEX¡ªto NPV. Furthermore, the corresponding public financial supports¡ªconcessional loans provided by public financial institutions, applying for the feed-in tariff (FiT) system in the UK, and receiving a government subsidy for initial investment¡ªare discussed as potential measures to fill the viability gap. In order to have a feasible project, it is essential to introduce one or more effective measures of public financial support. renewable energy, electricity transmission, project viability, public financial support, IceLink Article in Journal/Newspaper Iceland RePEc (Research Papers in Economics)
institution Open Polar
collection RePEc (Research Papers in Economics)
op_collection_id ftrepec
language unknown
description The feasibility of the project called IceLink is now being examined, which entails laying 800¨C1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable energy sources, though there exists a relatively high degree of potential risks (e.g., financial risk due to the lingering affect of the financial crisis). This study aims to examine the effectiveness of public financial support for the project by using a quantitative analysis as well as discussing public financial support as a possible measure to fill the viability gap. The simulation results imply that the project is unfeasible unless there is public financial support. In the light of the public nature of the project and its promotion of green power, public financial support may be acceptable. It can thus be said that public financial support will be effective for this project. Also, the sensitivity analysis results show break-even points for three major parameters:¡ªWACC, wholesale power price, and CAPEX¡ªto NPV. Furthermore, the corresponding public financial supports¡ªconcessional loans provided by public financial institutions, applying for the feed-in tariff (FiT) system in the UK, and receiving a government subsidy for initial investment¡ªare discussed as potential measures to fill the viability gap. In order to have a feasible project, it is essential to introduce one or more effective measures of public financial support. renewable energy, electricity transmission, project viability, public financial support, IceLink
format Article in Journal/Newspaper
author Daisuke Sasaki
Mikiyasu Nakayama
spellingShingle Daisuke Sasaki
Mikiyasu Nakayama
Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
author_facet Daisuke Sasaki
Mikiyasu Nakayama
author_sort Daisuke Sasaki
title Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_short Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_full Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_fullStr Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_full_unstemmed Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_sort effectiveness of public financial support in an electricity transmission project between iceland and the uk
url http://redfame.com/journal/index.php/bms/article/view/1518/1697
http://redfame.com/journal/index.php/bms/article/view/1518
genre Iceland
genre_facet Iceland
op_relation http://redfame.com/journal/index.php/bms/article/view/1518/1697
http://redfame.com/journal/index.php/bms/article/view/1518
_version_ 1766041637647024128