Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability

The Qinghai–Tibet power grid interconnection project is the first power transmission project with the highest altitude, longest transmission lines, longest distance running across the plateau frozen ground, and highest iron tower in the world. The risk evaluation on it can identify the overall risk...

Full description

Bibliographic Details
Main Authors: Cunbin Li, Yunqi Liu, Shuke Li
Format: Article in Journal/Newspaper
Language:unknown
Subjects:
Online Access:https://www.mdpi.com/2071-1050/8/1/85/pdf
https://www.mdpi.com/2071-1050/8/1/85/
id ftrepec:oai:RePEc:gam:jsusta:v:8:y:2016:i:1:p:85-:d:62344
record_format openpolar
spelling ftrepec:oai:RePEc:gam:jsusta:v:8:y:2016:i:1:p:85-:d:62344 2024-04-14T08:18:18+00:00 Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability Cunbin Li Yunqi Liu Shuke Li https://www.mdpi.com/2071-1050/8/1/85/pdf https://www.mdpi.com/2071-1050/8/1/85/ unknown https://www.mdpi.com/2071-1050/8/1/85/pdf https://www.mdpi.com/2071-1050/8/1/85/ article ftrepec 2024-03-19T10:30:49Z The Qinghai–Tibet power grid interconnection project is the first power transmission project with the highest altitude, longest transmission lines, longest distance running across the plateau frozen ground, and highest iron tower in the world. The risk evaluation on it can identify the overall risk level and key risk factors, which can reduce risk-induced loss and promote sustainable construction. In this paper, the risk of the Qinghai–Tibet power grid interconnection project was evaluated by employing a matter-element extension model under a fuzzy environment. After building the risk evaluation index system, the performances and weights of criteria were qualitatively judged by three groups of experts in different fields, and then the risk of the Qinghai–Tibet power grid interconnection project was rated by employing matter-element extension model. Meanwhile, the sensitivity analysis was performed to identify key risk criteria. The empirical results indicate the risk of the Qinghai–Tibet power grid interconnection project belongs to the “stronger” grade, tending to the “strongest” grade. “Social stability risk”, “altitude sickness seizure risk”, “permafrost-induced risk”, “severe weather-induced risk”, and “ecological destruction risk” are key sub-criteria, which should be paid more attention to when taking risk management measures. Finally, some countermeasures for key risks of the Qinghai–Tibet power grid interconnection project were given. The findings in this paper can provide references for engineering managers and related stakeholders. risk evaluation; Qinghai–Tibet power grid interconnection project; matter-element extension model; fuzzy theory; sensitivity analysis; sustainability Article in Journal/Newspaper permafrost RePEc (Research Papers in Economics)
institution Open Polar
collection RePEc (Research Papers in Economics)
op_collection_id ftrepec
language unknown
description The Qinghai–Tibet power grid interconnection project is the first power transmission project with the highest altitude, longest transmission lines, longest distance running across the plateau frozen ground, and highest iron tower in the world. The risk evaluation on it can identify the overall risk level and key risk factors, which can reduce risk-induced loss and promote sustainable construction. In this paper, the risk of the Qinghai–Tibet power grid interconnection project was evaluated by employing a matter-element extension model under a fuzzy environment. After building the risk evaluation index system, the performances and weights of criteria were qualitatively judged by three groups of experts in different fields, and then the risk of the Qinghai–Tibet power grid interconnection project was rated by employing matter-element extension model. Meanwhile, the sensitivity analysis was performed to identify key risk criteria. The empirical results indicate the risk of the Qinghai–Tibet power grid interconnection project belongs to the “stronger” grade, tending to the “strongest” grade. “Social stability risk”, “altitude sickness seizure risk”, “permafrost-induced risk”, “severe weather-induced risk”, and “ecological destruction risk” are key sub-criteria, which should be paid more attention to when taking risk management measures. Finally, some countermeasures for key risks of the Qinghai–Tibet power grid interconnection project were given. The findings in this paper can provide references for engineering managers and related stakeholders. risk evaluation; Qinghai–Tibet power grid interconnection project; matter-element extension model; fuzzy theory; sensitivity analysis; sustainability
format Article in Journal/Newspaper
author Cunbin Li
Yunqi Liu
Shuke Li
spellingShingle Cunbin Li
Yunqi Liu
Shuke Li
Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
author_facet Cunbin Li
Yunqi Liu
Shuke Li
author_sort Cunbin Li
title Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
title_short Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
title_full Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
title_fullStr Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
title_full_unstemmed Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability
title_sort risk evaluation of qinghai–tibet power grid interconnection project for sustainability
url https://www.mdpi.com/2071-1050/8/1/85/pdf
https://www.mdpi.com/2071-1050/8/1/85/
genre permafrost
genre_facet permafrost
op_relation https://www.mdpi.com/2071-1050/8/1/85/pdf
https://www.mdpi.com/2071-1050/8/1/85/
_version_ 1796317753024446464