Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK

The feasibility of the project called IceLink is now being examined, which entails laying 800–1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable e...

Full description

Bibliographic Details
Published in:Business and Management Studies
Main Authors: Sasaki, Daisuke, Nakayama, Mikiyasu
Format: Article in Journal/Newspaper
Language:English
Published: Redfame Publishing 2016
Subjects:
Online Access:https://redfame.com/journal/index.php/bms/article/view/1518
https://doi.org/10.11114/bms.v2i2.1518
id ftredfame:oai:ojs.www.redfame.com:article/1518
record_format openpolar
spelling ftredfame:oai:ojs.www.redfame.com:article/1518 2023-10-01T03:56:58+02:00 Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK Sasaki, Daisuke Nakayama, Mikiyasu 2016-04-29 application/pdf https://redfame.com/journal/index.php/bms/article/view/1518 https://doi.org/10.11114/bms.v2i2.1518 eng eng Redfame Publishing https://redfame.com/journal/index.php/bms/article/view/1518/1697 https://redfame.com/journal/index.php/bms/article/view/1518 doi:10.11114/bms.v2i2.1518 Business and Management Studies; Vol 2, No 2 (2016); 14-20 2374-5924 2374-5916 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer-reviewed Article 2016 ftredfame https://doi.org/10.11114/bms.v2i2.1518 2023-09-03T06:47:22Z The feasibility of the project called IceLink is now being examined, which entails laying 800–1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable energy sources, though there exists a relatively high degree of potential risks (e.g., financial risk due to the lingering affect of the financial crisis). This study aims to examine the effectiveness of public financial support for the project by using a quantitative analysis as well as discussing public financial support as a possible measure to fill the viability gap. The simulation results imply that the project is unfeasible unless there is public financial support. In the light of the public nature of the project and its promotion of green power, public financial support may be acceptable. It can thus be said that public financial support will be effective for this project. Also, the sensitivity analysis results show break-even points for three major parameters:—WACC, wholesale power price, and CAPEX—to NPV. Furthermore, the corresponding public financial supports—concessional loans provided by public financial institutions, applying for the feed-in tariff (FiT) system in the UK, and receiving a government subsidy for initial investment—are discussed as potential measures to fill the viability gap. In order to have a feasible project, it is essential to introduce one or more effective measures of public financial support. Article in Journal/Newspaper Iceland Redfame Publishing: E-Journals Business and Management Studies 2 2 14
institution Open Polar
collection Redfame Publishing: E-Journals
op_collection_id ftredfame
language English
description The feasibility of the project called IceLink is now being examined, which entails laying 800–1,200 MW high-voltage direct current (HVDC) submarine cables over 1,000 km and transmitting over 5 TWh per annum. This project will meet the growing demand in Europe for electricity derived from renewable energy sources, though there exists a relatively high degree of potential risks (e.g., financial risk due to the lingering affect of the financial crisis). This study aims to examine the effectiveness of public financial support for the project by using a quantitative analysis as well as discussing public financial support as a possible measure to fill the viability gap. The simulation results imply that the project is unfeasible unless there is public financial support. In the light of the public nature of the project and its promotion of green power, public financial support may be acceptable. It can thus be said that public financial support will be effective for this project. Also, the sensitivity analysis results show break-even points for three major parameters:—WACC, wholesale power price, and CAPEX—to NPV. Furthermore, the corresponding public financial supports—concessional loans provided by public financial institutions, applying for the feed-in tariff (FiT) system in the UK, and receiving a government subsidy for initial investment—are discussed as potential measures to fill the viability gap. In order to have a feasible project, it is essential to introduce one or more effective measures of public financial support.
format Article in Journal/Newspaper
author Sasaki, Daisuke
Nakayama, Mikiyasu
spellingShingle Sasaki, Daisuke
Nakayama, Mikiyasu
Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
author_facet Sasaki, Daisuke
Nakayama, Mikiyasu
author_sort Sasaki, Daisuke
title Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_short Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_full Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_fullStr Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_full_unstemmed Effectiveness of Public Financial Support in an Electricity Transmission Project between Iceland and the UK
title_sort effectiveness of public financial support in an electricity transmission project between iceland and the uk
publisher Redfame Publishing
publishDate 2016
url https://redfame.com/journal/index.php/bms/article/view/1518
https://doi.org/10.11114/bms.v2i2.1518
genre Iceland
genre_facet Iceland
op_source Business and Management Studies; Vol 2, No 2 (2016); 14-20
2374-5924
2374-5916
op_relation https://redfame.com/journal/index.php/bms/article/view/1518/1697
https://redfame.com/journal/index.php/bms/article/view/1518
doi:10.11114/bms.v2i2.1518
op_doi https://doi.org/10.11114/bms.v2i2.1518
container_title Business and Management Studies
container_volume 2
container_issue 2
container_start_page 14
_version_ 1778527685707825152