Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.

Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real tim...

Full description

Bibliographic Details
Main Author: Sisterson, D. L.
Language:unknown
Published: 2018
Subjects:
Online Access:http://www.osti.gov/servlets/purl/966776
https://www.osti.gov/biblio/966776
https://doi.org/10.2172/966776
id ftosti:oai:osti.gov:966776
record_format openpolar
spelling ftosti:oai:osti.gov:966776 2023-07-30T04:05:44+02:00 Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009. Sisterson, D. L. 2018-09-25 application/pdf http://www.osti.gov/servlets/purl/966776 https://www.osti.gov/biblio/966776 https://doi.org/10.2172/966776 unknown http://www.osti.gov/servlets/purl/966776 https://www.osti.gov/biblio/966776 https://doi.org/10.2172/966776 doi:10.2172/966776 54 ENVIRONMENTAL SCIENCES LABORATORIES ATMOSPHERIC CHEMISTRY DATA PROCESSING DATA ACQUISITION AVAILABILITY 2018 ftosti https://doi.org/10.2172/966776 2023-07-11T08:47:50Z Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual ... Other/Unknown Material north slope Alaska SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Pacific
institution Open Polar
collection SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
op_collection_id ftosti
language unknown
topic 54 ENVIRONMENTAL SCIENCES
LABORATORIES
ATMOSPHERIC CHEMISTRY
DATA PROCESSING
DATA ACQUISITION
AVAILABILITY
spellingShingle 54 ENVIRONMENTAL SCIENCES
LABORATORIES
ATMOSPHERIC CHEMISTRY
DATA PROCESSING
DATA ACQUISITION
AVAILABILITY
Sisterson, D. L.
Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
topic_facet 54 ENVIRONMENTAL SCIENCES
LABORATORIES
ATMOSPHERIC CHEMISTRY
DATA PROCESSING
DATA ACQUISITION
AVAILABILITY
description Individual raw data streams from instrumentation at the Atmospheric Radiation Measurement (ARM) Program Climate Research Facility (ACRF) fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near-real time. Raw and processed data are then sent approximately daily to the ACRF Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the archive to the expected number of data records. The results are tabulated by (1) individual data stream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1 - (ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the third quarter of FY 2009 for the Southern Great Plains (SGP) site is 2,074.80 hours (0.95 x 2,184 hours this quarter); for the North Slope Alaska (NSA) locale it is 1,965.60 hours (0.90 x 2,184); and for the Tropical Western Pacific (TWP) locale it is 1,856.40 hours (0.85 x 2,184). The ARM Mobile Facility (AMF) was officially operational May 1 in Graciosa Island, the Azores, Portugal, so the OPSMAX time this quarter is 1390.80 hours (0.95 x 1464). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or data stream. Data availability reported here refers to the average of the individual, continuous data streams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual ...
author Sisterson, D. L.
author_facet Sisterson, D. L.
author_sort Sisterson, D. L.
title Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
title_short Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
title_full Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
title_fullStr Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
title_full_unstemmed Atmospheric Radiation Measurement program climate research facilities quarterly report April 1 - June 30, 2009.
title_sort atmospheric radiation measurement program climate research facilities quarterly report april 1 - june 30, 2009.
publishDate 2018
url http://www.osti.gov/servlets/purl/966776
https://www.osti.gov/biblio/966776
https://doi.org/10.2172/966776
geographic Pacific
geographic_facet Pacific
genre north slope
Alaska
genre_facet north slope
Alaska
op_relation http://www.osti.gov/servlets/purl/966776
https://www.osti.gov/biblio/966776
https://doi.org/10.2172/966776
doi:10.2172/966776
op_doi https://doi.org/10.2172/966776
_version_ 1772817865560293376