Biological Monitoring Program for East Fork Poplar Creek

In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biologicai Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect...

Full description

Bibliographic Details
Main Author: Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.
Language:unknown
Published: 2009
Subjects:
Online Access:http://www.osti.gov/servlets/purl/6822-wo80KS/webviewable/
id ftosti:oai:osti.gov:6822
record_format openpolar
spelling ftosti:oai:osti.gov:6822 2023-05-15T15:41:09+02:00 Biological Monitoring Program for East Fork Poplar Creek Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. 2009-11-04 application/pdf http://www.osti.gov/servlets/purl/6822-wo80KS/webviewable/ unknown http://www.osti.gov/servlets/purl/6822-wo80KS/webviewable/ 54 ENVIRONMENTAL SCIENCES Y-12 Plant Streams Fishes Toxicity Monitoring Progress Report 2009 ftosti 2010-02-15T09:21:33Z In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biologicai Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the compiex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC, These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumuiation studies, and (4) ecological surveys of the periphyton, benthic macro invertebrate, and fish communities. Monitoring is currently being conducted at five sites, although sites maybe excluded and/or others added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) concentration of mercury in the adjacent floodplain, (5) appropriate habitat distribution, and (6) access. The sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18 and 19), iocated off the ORR and below an area of intensive commercial and limited light industrial development; EFK 13.8 (also EFK 14), located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1 ). Other sampling sites on EFPC are utilized as appropriate for individual tasks. Brushy Fork (BF) at kilometer (BFK) 7.6 is used as a reference stream in most tasks of the BMAP. Additional sites off the ORR are also occasional 1 y used for reference, including Beaver Creek, Bull Run, Hinds Creek, Paint Rock Creek, and the Einory River in Watts Bar Reservoir (Fig. 1.2). Other/Unknown Material Beaver Creek SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) The ''Y'' ENVELOPE(-112.453,-112.453,57.591,57.591) Rock Creek ENVELOPE(-139.092,-139.092,64.062,64.062)
institution Open Polar
collection SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
op_collection_id ftosti
language unknown
topic 54 ENVIRONMENTAL SCIENCES
Y-12 Plant
Streams
Fishes
Toxicity
Monitoring
Progress Report
spellingShingle 54 ENVIRONMENTAL SCIENCES
Y-12 Plant
Streams
Fishes
Toxicity
Monitoring
Progress Report
Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.
Biological Monitoring Program for East Fork Poplar Creek
topic_facet 54 ENVIRONMENTAL SCIENCES
Y-12 Plant
Streams
Fishes
Toxicity
Monitoring
Progress Report
description In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit, a Biologicai Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y-12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the compiex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic integrity of EFPC, These tasks are (1) toxicity monitoring, (2) biological indicator studies, (3) bioaccumuiation studies, and (4) ecological surveys of the periphyton, benthic macro invertebrate, and fish communities. Monitoring is currently being conducted at five sites, although sites maybe excluded and/or others added depending upon the specific objectives of the various tasks. Criteria used in selecting the sites include: (1) location of sampling sites used in other studies, (2) known or suspected sources of downstream impacts, (3) proximity to U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) boundaries, (4) concentration of mercury in the adjacent floodplain, (5) appropriate habitat distribution, and (6) access. The sampling sites include upper EFPC at kilometers (EFKs) 24.4 and 23.4 [upstream and downstream of Lake Reality (LR) respectively]; EFK 18.7 (also EFK 18 and 19), iocated off the ORR and below an area of intensive commercial and limited light industrial development; EFK 13.8 (also EFK 14), located upstream from the Oak Ridge Wastewater Treatment Facility (ORWTF); and EFK 6.3 located approximately 1.4 km below the ORR boundary (Fig. 1.1 ). Other sampling sites on EFPC are utilized as appropriate for individual tasks. Brushy Fork (BF) at kilometer (BFK) 7.6 is used as a reference stream in most tasks of the BMAP. Additional sites off the ORR are also occasional 1 y used for reference, including Beaver Creek, Bull Run, Hinds Creek, Paint Rock Creek, and the Einory River in Watts Bar Reservoir (Fig. 1.2).
author Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.
author_facet Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.
author_sort Adams, S.M.; Christensen, S.W.; Greeley, M.S.jr; Hill, W.R.; Kszos, L.A.; McCarthy, J.F.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.
title Biological Monitoring Program for East Fork Poplar Creek
title_short Biological Monitoring Program for East Fork Poplar Creek
title_full Biological Monitoring Program for East Fork Poplar Creek
title_fullStr Biological Monitoring Program for East Fork Poplar Creek
title_full_unstemmed Biological Monitoring Program for East Fork Poplar Creek
title_sort biological monitoring program for east fork poplar creek
publishDate 2009
url http://www.osti.gov/servlets/purl/6822-wo80KS/webviewable/
long_lat ENVELOPE(-112.453,-112.453,57.591,57.591)
ENVELOPE(-139.092,-139.092,64.062,64.062)
geographic The ''Y''
Rock Creek
geographic_facet The ''Y''
Rock Creek
genre Beaver Creek
genre_facet Beaver Creek
op_relation http://www.osti.gov/servlets/purl/6822-wo80KS/webviewable/
_version_ 1766374030532673536