Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the...
Main Author: | |
---|---|
Language: | unknown |
Published: |
2020
|
Subjects: | |
Online Access: | http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 |
id |
ftosti:oai:osti.gov:6215406 |
---|---|
record_format |
openpolar |
spelling |
ftosti:oai:osti.gov:6215406 2023-07-30T04:01:26+02:00 Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns Not Available 2020-05-19 application/pdf http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 unknown http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 doi:10.2172/6215406 03 NATURAL GAS ALASKA GAS PIPELINE CONSTRUCTION COST ECONOMICS FORECASTING NATURAL GAS TANKER SHIPS TRANSPORT TRANSPORTATION SYSTEMS ENERGY SOURCES FLUIDS FOSSIL FUELS FUEL GAS FUELS GAS FUELS GASES PIPELINES SHIPS 2020 ftosti https://doi.org/10.2172/6215406 2023-07-11T10:46:06Z The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the magnitude of the overruns. The FPC estimates range from 5 to 10% cost overruns, whereas this report estimates direct cost overruns for the various proposals ranging from 30 to 40%; moreover, this report finds that overruns on total costs including financing (allowance for funds used during construction) may range from 40 to 55%. The Commissioners have estimated potential delays ranging from 0 to 12 months; this report anticipates delays ranging from 15 to 17 months. This report indicates the Arctic Gas proposal to contain the greatest uncertainty, while the Alcan and El Paso proposals contain less. The Alcan proposal has the earliest expected delivery date and the least total cost, followed by El Paso and Arctic Gas. (DLC) Other/Unknown Material Arctic Alaska SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Arctic |
institution |
Open Polar |
collection |
SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) |
op_collection_id |
ftosti |
language |
unknown |
topic |
03 NATURAL GAS ALASKA GAS PIPELINE CONSTRUCTION COST ECONOMICS FORECASTING NATURAL GAS TANKER SHIPS TRANSPORT TRANSPORTATION SYSTEMS ENERGY SOURCES FLUIDS FOSSIL FUELS FUEL GAS FUELS GAS FUELS GASES PIPELINES SHIPS |
spellingShingle |
03 NATURAL GAS ALASKA GAS PIPELINE CONSTRUCTION COST ECONOMICS FORECASTING NATURAL GAS TANKER SHIPS TRANSPORT TRANSPORTATION SYSTEMS ENERGY SOURCES FLUIDS FOSSIL FUELS FUEL GAS FUELS GAS FUELS GASES PIPELINES SHIPS Not Available Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
topic_facet |
03 NATURAL GAS ALASKA GAS PIPELINE CONSTRUCTION COST ECONOMICS FORECASTING NATURAL GAS TANKER SHIPS TRANSPORT TRANSPORTATION SYSTEMS ENERGY SOURCES FLUIDS FOSSIL FUELS FUEL GAS FUELS GAS FUELS GASES PIPELINES SHIPS |
description |
The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the magnitude of the overruns. The FPC estimates range from 5 to 10% cost overruns, whereas this report estimates direct cost overruns for the various proposals ranging from 30 to 40%; moreover, this report finds that overruns on total costs including financing (allowance for funds used during construction) may range from 40 to 55%. The Commissioners have estimated potential delays ranging from 0 to 12 months; this report anticipates delays ranging from 15 to 17 months. This report indicates the Arctic Gas proposal to contain the greatest uncertainty, while the Alcan and El Paso proposals contain less. The Alcan proposal has the earliest expected delivery date and the least total cost, followed by El Paso and Arctic Gas. (DLC) |
author |
Not Available |
author_facet |
Not Available |
author_sort |
Not Available |
title |
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
title_short |
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
title_full |
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
title_fullStr |
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
title_full_unstemmed |
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns |
title_sort |
alaska natural gas transportation systems. white house task force lead agency report on construction delay and cost overruns |
publishDate |
2020 |
url |
http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 |
geographic |
Arctic |
geographic_facet |
Arctic |
genre |
Arctic Alaska |
genre_facet |
Arctic Alaska |
op_relation |
http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 doi:10.2172/6215406 |
op_doi |
https://doi.org/10.2172/6215406 |
_version_ |
1772812176786980864 |