Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns

The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the...

Full description

Bibliographic Details
Main Author: Not Available
Language:unknown
Published: 2020
Subjects:
Online Access:http://www.osti.gov/servlets/purl/6215406
https://www.osti.gov/biblio/6215406
https://doi.org/10.2172/6215406
id ftosti:oai:osti.gov:6215406
record_format openpolar
spelling ftosti:oai:osti.gov:6215406 2023-07-30T04:01:26+02:00 Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns Not Available 2020-05-19 application/pdf http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 unknown http://www.osti.gov/servlets/purl/6215406 https://www.osti.gov/biblio/6215406 https://doi.org/10.2172/6215406 doi:10.2172/6215406 03 NATURAL GAS ALASKA GAS PIPELINE CONSTRUCTION COST ECONOMICS FORECASTING NATURAL GAS TANKER SHIPS TRANSPORT TRANSPORTATION SYSTEMS ENERGY SOURCES FLUIDS FOSSIL FUELS FUEL GAS FUELS GAS FUELS GASES PIPELINES SHIPS 2020 ftosti https://doi.org/10.2172/6215406 2023-07-11T10:46:06Z The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the magnitude of the overruns. The FPC estimates range from 5 to 10% cost overruns, whereas this report estimates direct cost overruns for the various proposals ranging from 30 to 40%; moreover, this report finds that overruns on total costs including financing (allowance for funds used during construction) may range from 40 to 55%. The Commissioners have estimated potential delays ranging from 0 to 12 months; this report anticipates delays ranging from 15 to 17 months. This report indicates the Arctic Gas proposal to contain the greatest uncertainty, while the Alcan and El Paso proposals contain less. The Alcan proposal has the earliest expected delivery date and the least total cost, followed by El Paso and Arctic Gas. (DLC) Other/Unknown Material Arctic Alaska SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Arctic
institution Open Polar
collection SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
op_collection_id ftosti
language unknown
topic 03 NATURAL GAS
ALASKA GAS PIPELINE
CONSTRUCTION
COST
ECONOMICS
FORECASTING
NATURAL GAS
TANKER SHIPS
TRANSPORT
TRANSPORTATION SYSTEMS
ENERGY SOURCES
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
PIPELINES
SHIPS
spellingShingle 03 NATURAL GAS
ALASKA GAS PIPELINE
CONSTRUCTION
COST
ECONOMICS
FORECASTING
NATURAL GAS
TANKER SHIPS
TRANSPORT
TRANSPORTATION SYSTEMS
ENERGY SOURCES
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
PIPELINES
SHIPS
Not Available
Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
topic_facet 03 NATURAL GAS
ALASKA GAS PIPELINE
CONSTRUCTION
COST
ECONOMICS
FORECASTING
NATURAL GAS
TANKER SHIPS
TRANSPORT
TRANSPORTATION SYSTEMS
ENERGY SOURCES
FLUIDS
FOSSIL FUELS
FUEL GAS
FUELS
GAS FUELS
GASES
PIPELINES
SHIPS
description The objective of this report is to review the analysis and findings of FPC in their recommendations to the President. It generally agrees with FPC's relative ranking among the projects with regard to the possibility of cost overrun and construction delay but differs sharply with respect to the magnitude of the overruns. The FPC estimates range from 5 to 10% cost overruns, whereas this report estimates direct cost overruns for the various proposals ranging from 30 to 40%; moreover, this report finds that overruns on total costs including financing (allowance for funds used during construction) may range from 40 to 55%. The Commissioners have estimated potential delays ranging from 0 to 12 months; this report anticipates delays ranging from 15 to 17 months. This report indicates the Arctic Gas proposal to contain the greatest uncertainty, while the Alcan and El Paso proposals contain less. The Alcan proposal has the earliest expected delivery date and the least total cost, followed by El Paso and Arctic Gas. (DLC)
author Not Available
author_facet Not Available
author_sort Not Available
title Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
title_short Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
title_full Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
title_fullStr Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
title_full_unstemmed Alaska Natural Gas Transportation Systems. White House Task Force Lead Agency report on construction delay and cost overruns
title_sort alaska natural gas transportation systems. white house task force lead agency report on construction delay and cost overruns
publishDate 2020
url http://www.osti.gov/servlets/purl/6215406
https://www.osti.gov/biblio/6215406
https://doi.org/10.2172/6215406
geographic Arctic
geographic_facet Arctic
genre Arctic
Alaska
genre_facet Arctic
Alaska
op_relation http://www.osti.gov/servlets/purl/6215406
https://www.osti.gov/biblio/6215406
https://doi.org/10.2172/6215406
doi:10.2172/6215406
op_doi https://doi.org/10.2172/6215406
_version_ 1772812176786980864