Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; histori...

Full description

Bibliographic Details
Main Author: Not Available
Language:unknown
Published: 2015
Subjects:
USA
Online Access:http://www.osti.gov/servlets/purl/5901682
https://www.osti.gov/biblio/5901682
https://doi.org/10.2172/5901682