Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report

The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasib...

Full description

Bibliographic Details
Main Author: None
Language:unknown
Published: 2013
Subjects:
USA
Online Access:http://www.osti.gov/servlets/purl/5877240
https://www.osti.gov/biblio/5877240
https://doi.org/10.2172/5877240
id ftosti:oai:osti.gov:5877240
record_format openpolar
spelling ftosti:oai:osti.gov:5877240 2023-07-30T04:05:28+02:00 Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report None 2013-04-25 application/pdf http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 unknown http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 doi:10.2172/5877240 13 HYDRO ENERGY DAMS RETROFITTING LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES VERMONT HYDROELECTRIC POWER LEGAL ASPECTS REGULATIONS TECHNOLOGY ASSESSMENT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA 2013 ftosti https://doi.org/10.2172/5877240 2023-07-11T10:43:10Z The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL) Other/Unknown Material North Atlantic SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Low Head ENVELOPE(-58.133,-58.133,-62.150,-62.150)
institution Open Polar
collection SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
op_collection_id ftosti
language unknown
topic 13 HYDRO ENERGY
DAMS
RETROFITTING
LOW-HEAD HYDROELECTRIC POWER PLANTS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
VERMONT
HYDROELECTRIC POWER
LEGAL ASPECTS
REGULATIONS
TECHNOLOGY ASSESSMENT
ELECTRIC POWER
ENERGY SOURCES
HYDROELECTRIC POWER PLANTS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER PLANTS
RENEWABLE ENERGY SOURCES
USA
spellingShingle 13 HYDRO ENERGY
DAMS
RETROFITTING
LOW-HEAD HYDROELECTRIC POWER PLANTS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
VERMONT
HYDROELECTRIC POWER
LEGAL ASPECTS
REGULATIONS
TECHNOLOGY ASSESSMENT
ELECTRIC POWER
ENERGY SOURCES
HYDROELECTRIC POWER PLANTS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER PLANTS
RENEWABLE ENERGY SOURCES
USA
None
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
topic_facet 13 HYDRO ENERGY
DAMS
RETROFITTING
LOW-HEAD HYDROELECTRIC POWER PLANTS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
VERMONT
HYDROELECTRIC POWER
LEGAL ASPECTS
REGULATIONS
TECHNOLOGY ASSESSMENT
ELECTRIC POWER
ENERGY SOURCES
HYDROELECTRIC POWER PLANTS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER PLANTS
RENEWABLE ENERGY SOURCES
USA
description The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL)
author None
author_facet None
author_sort None
title Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
title_short Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
title_full Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
title_fullStr Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
title_full_unstemmed Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
title_sort feasibility of determination of low-head hydroelectric power development at existing sites: north hartland dam project. feasibility report
publishDate 2013
url http://www.osti.gov/servlets/purl/5877240
https://www.osti.gov/biblio/5877240
https://doi.org/10.2172/5877240
long_lat ENVELOPE(-58.133,-58.133,-62.150,-62.150)
geographic Low Head
geographic_facet Low Head
genre North Atlantic
genre_facet North Atlantic
op_relation http://www.osti.gov/servlets/purl/5877240
https://www.osti.gov/biblio/5877240
https://doi.org/10.2172/5877240
doi:10.2172/5877240
op_doi https://doi.org/10.2172/5877240
_version_ 1772817403305000960