Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report
The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasib...
Main Author: | |
---|---|
Language: | unknown |
Published: |
2013
|
Subjects: | |
Online Access: | http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 |
id |
ftosti:oai:osti.gov:5877240 |
---|---|
record_format |
openpolar |
spelling |
ftosti:oai:osti.gov:5877240 2023-07-30T04:05:28+02:00 Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report None 2013-04-25 application/pdf http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 unknown http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 doi:10.2172/5877240 13 HYDRO ENERGY DAMS RETROFITTING LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES VERMONT HYDROELECTRIC POWER LEGAL ASPECTS REGULATIONS TECHNOLOGY ASSESSMENT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA 2013 ftosti https://doi.org/10.2172/5877240 2023-07-11T10:43:10Z The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL) Other/Unknown Material North Atlantic SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Low Head ENVELOPE(-58.133,-58.133,-62.150,-62.150) |
institution |
Open Polar |
collection |
SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) |
op_collection_id |
ftosti |
language |
unknown |
topic |
13 HYDRO ENERGY DAMS RETROFITTING LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES VERMONT HYDROELECTRIC POWER LEGAL ASPECTS REGULATIONS TECHNOLOGY ASSESSMENT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA |
spellingShingle |
13 HYDRO ENERGY DAMS RETROFITTING LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES VERMONT HYDROELECTRIC POWER LEGAL ASPECTS REGULATIONS TECHNOLOGY ASSESSMENT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA None Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
topic_facet |
13 HYDRO ENERGY DAMS RETROFITTING LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES VERMONT HYDROELECTRIC POWER LEGAL ASPECTS REGULATIONS TECHNOLOGY ASSESSMENT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA |
description |
The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL) |
author |
None |
author_facet |
None |
author_sort |
None |
title |
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
title_short |
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
title_full |
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
title_fullStr |
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
title_full_unstemmed |
Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report |
title_sort |
feasibility of determination of low-head hydroelectric power development at existing sites: north hartland dam project. feasibility report |
publishDate |
2013 |
url |
http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 |
long_lat |
ENVELOPE(-58.133,-58.133,-62.150,-62.150) |
geographic |
Low Head |
geographic_facet |
Low Head |
genre |
North Atlantic |
genre_facet |
North Atlantic |
op_relation |
http://www.osti.gov/servlets/purl/5877240 https://www.osti.gov/biblio/5877240 https://doi.org/10.2172/5877240 doi:10.2172/5877240 |
op_doi |
https://doi.org/10.2172/5877240 |
_version_ |
1772817403305000960 |