Chicopee Hydroelectric Project. Feasibility assessment
The results of a feasibility analysis for hydroelectric generating facilities at the Chicopee Falls Dam in Chicopee, Massachusetts are presented. The project has been examined for economic, engineering, and environmental viability. The projected facility controls a 714 square mile drainage area and...
Main Author: | |
---|---|
Language: | unknown |
Published: |
2015
|
Subjects: | |
Online Access: | http://www.osti.gov/servlets/purl/5766717 https://www.osti.gov/biblio/5766717 https://doi.org/10.2172/5766717 |