Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts
Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required...
Main Author: | |
---|---|
Language: | unknown |
Published: |
2013
|
Subjects: | |
Online Access: | http://www.osti.gov/servlets/purl/5766688 https://www.osti.gov/biblio/5766688 https://doi.org/10.2172/5766688 |
id |
ftosti:oai:osti.gov:5766688 |
---|---|
record_format |
openpolar |
spelling |
ftosti:oai:osti.gov:5766688 2023-07-30T04:05:30+02:00 Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts None 2013-04-25 application/pdf http://www.osti.gov/servlets/purl/5766688 https://www.osti.gov/biblio/5766688 https://doi.org/10.2172/5766688 unknown http://www.osti.gov/servlets/purl/5766688 https://www.osti.gov/biblio/5766688 https://doi.org/10.2172/5766688 doi:10.2172/5766688 13 HYDRO ENERGY LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES MASSACHUSETTS HYDROELECTRIC POWER DAMS LEGAL ASPECTS POWER GENERATION SOCIAL IMPACT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA 2013 ftosti https://doi.org/10.2172/5766688 2023-07-11T10:42:26Z Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required to rehabilitate the structures. Analyses of hydrology and power potential were carried out and a packaged tube turbine-generator unit was found to be suitable for installation at all sites. Project layouts were developed making maximum use of existing structures and natural and man-made features. Capital and operation and maintenance costs were estimated based on the project layouts and the selected turbine-generator units. Financial analyses were performed using a set of baseline assumptions. Sensitivity tests of alternative assumptions were also prepared, along with analyses of assistance program alternatives. Finally, the legal, environmental, and socio-institutional considerations affecting development of the hydro projects were identified and reviewed. Hydro developments on the Mill River were found to be technically feasible, presenting no extraordinary engineering, environmental, or legal problems. However, none of these projects, either individually or jointly, would be financially feasible without substantial assistance in the form of capital grants. Other/Unknown Material North Atlantic SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) Low Head ENVELOPE(-58.133,-58.133,-62.150,-62.150) Northampton ENVELOPE(169.167,169.167,-72.667,-72.667) |
institution |
Open Polar |
collection |
SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy) |
op_collection_id |
ftosti |
language |
unknown |
topic |
13 HYDRO ENERGY LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES MASSACHUSETTS HYDROELECTRIC POWER DAMS LEGAL ASPECTS POWER GENERATION SOCIAL IMPACT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA |
spellingShingle |
13 HYDRO ENERGY LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES MASSACHUSETTS HYDROELECTRIC POWER DAMS LEGAL ASPECTS POWER GENERATION SOCIAL IMPACT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA None Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
topic_facet |
13 HYDRO ENERGY LOW-HEAD HYDROELECTRIC POWER PLANTS ECONOMICS ENVIRONMENTAL IMPACTS FEASIBILITY STUDIES MASSACHUSETTS HYDROELECTRIC POWER DAMS LEGAL ASPECTS POWER GENERATION SOCIAL IMPACT ELECTRIC POWER ENERGY SOURCES HYDROELECTRIC POWER PLANTS NORTH AMERICA NORTH ATLANTIC REGION POWER POWER PLANTS RENEWABLE ENERGY SOURCES USA |
description |
Five existing dams along a 6.5-mile reach of the Mill River in the City of Northampton, Massachusetts were studied to assess the feasibility of developing the sites for low-head hydroelectric power generation. Each of the dams was inspected to evaluate existing conditions and necessary work required to rehabilitate the structures. Analyses of hydrology and power potential were carried out and a packaged tube turbine-generator unit was found to be suitable for installation at all sites. Project layouts were developed making maximum use of existing structures and natural and man-made features. Capital and operation and maintenance costs were estimated based on the project layouts and the selected turbine-generator units. Financial analyses were performed using a set of baseline assumptions. Sensitivity tests of alternative assumptions were also prepared, along with analyses of assistance program alternatives. Finally, the legal, environmental, and socio-institutional considerations affecting development of the hydro projects were identified and reviewed. Hydro developments on the Mill River were found to be technically feasible, presenting no extraordinary engineering, environmental, or legal problems. However, none of these projects, either individually or jointly, would be financially feasible without substantial assistance in the form of capital grants. |
author |
None |
author_facet |
None |
author_sort |
None |
title |
Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
title_short |
Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
title_full |
Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
title_fullStr |
Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
title_full_unstemmed |
Feasibility study for low-head hydropower on the Mill River, Northampton, Massachusetts |
title_sort |
feasibility study for low-head hydropower on the mill river, northampton, massachusetts |
publishDate |
2013 |
url |
http://www.osti.gov/servlets/purl/5766688 https://www.osti.gov/biblio/5766688 https://doi.org/10.2172/5766688 |
long_lat |
ENVELOPE(-58.133,-58.133,-62.150,-62.150) ENVELOPE(169.167,169.167,-72.667,-72.667) |
geographic |
Low Head Northampton |
geographic_facet |
Low Head Northampton |
genre |
North Atlantic |
genre_facet |
North Atlantic |
op_relation |
http://www.osti.gov/servlets/purl/5766688 https://www.osti.gov/biblio/5766688 https://doi.org/10.2172/5766688 doi:10.2172/5766688 |
op_doi |
https://doi.org/10.2172/5766688 |
_version_ |
1772817473514504192 |