Goose River, Maine, demonstration project, January 1978-October 1978. Final report

The proposed Goose River Project is a commercial power development consisting of 4 power dams and one storage dam. All available energy is to be wholesaled to the Central Maine Power Company, the utility holding the franchise for the area. A description of the economic feasibility of the proposed pr...

Full description

Bibliographic Details
Main Author: Not Available
Language:unknown
Published: 2013
Subjects:
USA
Online Access:http://www.osti.gov/servlets/purl/5306064
https://www.osti.gov/biblio/5306064
https://doi.org/10.2172/5306064
id ftosti:oai:osti.gov:5306064
record_format openpolar
spelling ftosti:oai:osti.gov:5306064 2023-07-30T04:05:19+02:00 Goose River, Maine, demonstration project, January 1978-October 1978. Final report Not Available 2013-03-14 application/pdf http://www.osti.gov/servlets/purl/5306064 https://www.osti.gov/biblio/5306064 https://doi.org/10.2172/5306064 unknown http://www.osti.gov/servlets/purl/5306064 https://www.osti.gov/biblio/5306064 https://doi.org/10.2172/5306064 doi:10.2172/5306064 13 HYDRO ENERGY HYDROELECTRIC POWER PLANTS ECONOMIC ANALYSIS FEASIBILITY STUDIES DAMS DEMONSTRATION PROGRAMS ENERGY SOURCE DEVELOPMENT ENVIRONMENTAL EFFECTS INSTITUTIONAL FACTORS MAINE NUMERICAL DATA PLANNING REGULATIONS SOCIAL IMPACT TABLES US DOE DATA DATA FORMS ECONOMICS INFORMATION NATIONAL ORGANIZATIONS NORTH AMERICA NORTH ATLANTIC REGION POWER PLANTS US ORGANIZATIONS USA 2013 ftosti https://doi.org/10.2172/5306064 2023-07-11T10:38:34Z The proposed Goose River Project is a commercial power development consisting of 4 power dams and one storage dam. All available energy is to be wholesaled to the Central Maine Power Company, the utility holding the franchise for the area. A description of the economic feasibility of the proposed project is presented. Other/Unknown Material North Atlantic SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
institution Open Polar
collection SciTec Connect (Office of Scientific and Technical Information - OSTI, U.S. Department of Energy)
op_collection_id ftosti
language unknown
topic 13 HYDRO ENERGY
HYDROELECTRIC POWER PLANTS
ECONOMIC ANALYSIS
FEASIBILITY STUDIES
DAMS
DEMONSTRATION PROGRAMS
ENERGY SOURCE DEVELOPMENT
ENVIRONMENTAL EFFECTS
INSTITUTIONAL FACTORS
MAINE
NUMERICAL DATA
PLANNING
REGULATIONS
SOCIAL IMPACT
TABLES
US DOE
DATA
DATA FORMS
ECONOMICS
INFORMATION
NATIONAL ORGANIZATIONS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER PLANTS
US ORGANIZATIONS
USA
spellingShingle 13 HYDRO ENERGY
HYDROELECTRIC POWER PLANTS
ECONOMIC ANALYSIS
FEASIBILITY STUDIES
DAMS
DEMONSTRATION PROGRAMS
ENERGY SOURCE DEVELOPMENT
ENVIRONMENTAL EFFECTS
INSTITUTIONAL FACTORS
MAINE
NUMERICAL DATA
PLANNING
REGULATIONS
SOCIAL IMPACT
TABLES
US DOE
DATA
DATA FORMS
ECONOMICS
INFORMATION
NATIONAL ORGANIZATIONS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER PLANTS
US ORGANIZATIONS
USA
Not Available
Goose River, Maine, demonstration project, January 1978-October 1978. Final report
topic_facet 13 HYDRO ENERGY
HYDROELECTRIC POWER PLANTS
ECONOMIC ANALYSIS
FEASIBILITY STUDIES
DAMS
DEMONSTRATION PROGRAMS
ENERGY SOURCE DEVELOPMENT
ENVIRONMENTAL EFFECTS
INSTITUTIONAL FACTORS
MAINE
NUMERICAL DATA
PLANNING
REGULATIONS
SOCIAL IMPACT
TABLES
US DOE
DATA
DATA FORMS
ECONOMICS
INFORMATION
NATIONAL ORGANIZATIONS
NORTH AMERICA
NORTH ATLANTIC REGION
POWER PLANTS
US ORGANIZATIONS
USA
description The proposed Goose River Project is a commercial power development consisting of 4 power dams and one storage dam. All available energy is to be wholesaled to the Central Maine Power Company, the utility holding the franchise for the area. A description of the economic feasibility of the proposed project is presented.
author Not Available
author_facet Not Available
author_sort Not Available
title Goose River, Maine, demonstration project, January 1978-October 1978. Final report
title_short Goose River, Maine, demonstration project, January 1978-October 1978. Final report
title_full Goose River, Maine, demonstration project, January 1978-October 1978. Final report
title_fullStr Goose River, Maine, demonstration project, January 1978-October 1978. Final report
title_full_unstemmed Goose River, Maine, demonstration project, January 1978-October 1978. Final report
title_sort goose river, maine, demonstration project, january 1978-october 1978. final report
publishDate 2013
url http://www.osti.gov/servlets/purl/5306064
https://www.osti.gov/biblio/5306064
https://doi.org/10.2172/5306064
genre North Atlantic
genre_facet North Atlantic
op_relation http://www.osti.gov/servlets/purl/5306064
https://www.osti.gov/biblio/5306064
https://doi.org/10.2172/5306064
doi:10.2172/5306064
op_doi https://doi.org/10.2172/5306064
_version_ 1772817152679608320