EVALUATION OF SINGLE AND DUAL TURBINE-GENERATOR UNITS FOR PL-3

The investigation performed relative to the selection of a turbine- generator unit for the PL-3 portable nuclear power plant, Byrd Station, Antarctica, is described. Available conventional equipment was surveyed to minimize air shipment, installation, and cost requirements. Pertinent details of func...

Full description

Bibliographic Details
Main Author: Prall, T.F.
Language:unknown
Published: 2016
Subjects:
Online Access:http://www.osti.gov/servlets/purl/4792682
https://www.osti.gov/biblio/4792682
https://doi.org/10.2172/4792682