Snowflake Settling Speed Experiment Field Campaign Report

The goal of the Snowflake Settling Speed Experiment was to study the impacts of ambient turbulence on the average hydrometeor settling speed. The existing U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) third Mobile Facility (AMF3) deployed at Oliktok Point (OLI) on the North...

Full description

Bibliographic Details
Main Author: Garrett, Timothy
Language:unknown
Published: 2019
Subjects:
Online Access:http://www.osti.gov/servlets/purl/1524340
https://www.osti.gov/biblio/1524340
Description
Summary:The goal of the Snowflake Settling Speed Experiment was to study the impacts of ambient turbulence on the average hydrometeor settling speed. The existing U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) third Mobile Facility (AMF3) deployed at Oliktok Point (OLI) on the North Slope of Alaska includes detailed measurements of air turbulence and ground-based measurements from the multi-angle snowflake camera (MASC) of hydrometeor size, type, orientation, and fallspeed. The existing MASC is surrounded by a double wind fence, which enables measurement of the terminal velocity in still air but limits the ability to study the correlation between ambient turbulence and hydrometeor fallspeed. The scientific objective of this campaign was to assess the impact of turbulence on hydrometeor fallspeed by placing a second MASC next to the DOE MASC and without a wind fence. The goal was to assess if the two instrument measured different fallspeeds as a function of ambient turbulence and winds that could be used to assess the impact of winds on MASC measurements and on hydrometeor settling speeds. The instrument used was the original University of Utah prototype built in 2011, and it was successfully deployed in November 2017. It appeared to run successfully for two weeks but then failed. Subsequent attempts by DOE Atmospheric System Research (ASR) personnel at OLI and later at Fairbanks did not find the cause of the failure and eventually the instrument was shipped back to Utah in July 2018.