A method of selection of cable harvesting machines for Vermont

There is much interest in the State of Vermont in cable harvesting. Since there are no time studies available for cable harvesting with various machines in Vermont, it is necessary to arrive at production and cost levels by a different method. The method chosen for this paper is made up of four part...

Full description

Bibliographic Details
Main Author: Stirler, Dennis John
Other Authors: O'Leary, John E., Forest Engineering
Format: Other/Unknown Material
Language:English
unknown
Published: Oregon State University
Subjects:
Online Access:https://ir.library.oregonstate.edu/concern/graduate_projects/9z903490p
id ftoregonstate:ir.library.oregonstate.edu:9z903490p
record_format openpolar
spelling ftoregonstate:ir.library.oregonstate.edu:9z903490p 2024-04-14T08:15:11+00:00 A method of selection of cable harvesting machines for Vermont Stirler, Dennis John O'Leary, John E. Forest Engineering https://ir.library.oregonstate.edu/concern/graduate_projects/9z903490p English [eng] eng unknown Oregon State University https://ir.library.oregonstate.edu/concern/graduate_projects/9z903490p Copyright Not Evaluated Logging Skyline -- Vermont -- Equipment and supplies -- Cost of operation -- Mathematical models Capstone Project ftoregonstate 2024-03-21T15:38:55Z There is much interest in the State of Vermont in cable harvesting. Since there are no time studies available for cable harvesting with various machines in Vermont, it is necessary to arrive at production and cost levels by a different method. The method chosen for this paper is made up of four parts. In the first part a decision table is used to decide which machine or machines best meet the requirements of the Green Mountain National Forest in Vermont. Second, using the (S,W) program for the HP 9830 desktop calculator, the payloads are found for each machine for a representative profile. Third, using this payload in combination with individual machine characteristics, a. theortical production per day is calculated for each machine. Fourth, yarding costs are constructed for a given set of conditions and this is combined with the production per day to arrive at a cost per MBF for each machine. In this paper the method for arriving at theoretical production and thus cost per MBF, is compared against an actual study done with a Smith Timbermaster in Newfoundland. The cost from the model was $27.82 as compared to $28.35 per MBF from the study. Using this method the machines found most suitable for conditions in Vermont that were specified were: 1) Ecologger II, 2) Rosedale Timbermaster, 3) Thunderbird, 4) Smith Timbermaster, and 5) Igland-Jones Trailer Alp. Payloads for a given profile were calculated for each machine. Using these payloads and individual characteristics, a theoretical daily production was calculated for each machine. Each machine was then costed out for situations when a skidder: l)is required, 2) is not required to clear the landing. Both situations were then calculated twice: using 16% (taxes, interest and insurance) and using 20% (taxes, interest and insurance);- The results show the inter-relationships between payload, production, initial costs, other costs, and the final cost per MBF. Since under present conditions the initial cost may be as important to a purchaser as cost per MBF at the ... Other/Unknown Material Newfoundland ScholarsArchive@OSU (Oregon State University) The Landing ENVELOPE(-45.689,-45.689,-60.733,-60.733) Thunderbird ENVELOPE(-128.637,-128.637,54.450,54.450) Green Mountain ENVELOPE(-135.921,-135.921,61.833,61.833)
institution Open Polar
collection ScholarsArchive@OSU (Oregon State University)
op_collection_id ftoregonstate
language English
unknown
topic Logging
Skyline -- Vermont -- Equipment and supplies -- Cost of operation -- Mathematical models
spellingShingle Logging
Skyline -- Vermont -- Equipment and supplies -- Cost of operation -- Mathematical models
Stirler, Dennis John
A method of selection of cable harvesting machines for Vermont
topic_facet Logging
Skyline -- Vermont -- Equipment and supplies -- Cost of operation -- Mathematical models
description There is much interest in the State of Vermont in cable harvesting. Since there are no time studies available for cable harvesting with various machines in Vermont, it is necessary to arrive at production and cost levels by a different method. The method chosen for this paper is made up of four parts. In the first part a decision table is used to decide which machine or machines best meet the requirements of the Green Mountain National Forest in Vermont. Second, using the (S,W) program for the HP 9830 desktop calculator, the payloads are found for each machine for a representative profile. Third, using this payload in combination with individual machine characteristics, a. theortical production per day is calculated for each machine. Fourth, yarding costs are constructed for a given set of conditions and this is combined with the production per day to arrive at a cost per MBF for each machine. In this paper the method for arriving at theoretical production and thus cost per MBF, is compared against an actual study done with a Smith Timbermaster in Newfoundland. The cost from the model was $27.82 as compared to $28.35 per MBF from the study. Using this method the machines found most suitable for conditions in Vermont that were specified were: 1) Ecologger II, 2) Rosedale Timbermaster, 3) Thunderbird, 4) Smith Timbermaster, and 5) Igland-Jones Trailer Alp. Payloads for a given profile were calculated for each machine. Using these payloads and individual characteristics, a theoretical daily production was calculated for each machine. Each machine was then costed out for situations when a skidder: l)is required, 2) is not required to clear the landing. Both situations were then calculated twice: using 16% (taxes, interest and insurance) and using 20% (taxes, interest and insurance);- The results show the inter-relationships between payload, production, initial costs, other costs, and the final cost per MBF. Since under present conditions the initial cost may be as important to a purchaser as cost per MBF at the ...
author2 O'Leary, John E.
Forest Engineering
format Other/Unknown Material
author Stirler, Dennis John
author_facet Stirler, Dennis John
author_sort Stirler, Dennis John
title A method of selection of cable harvesting machines for Vermont
title_short A method of selection of cable harvesting machines for Vermont
title_full A method of selection of cable harvesting machines for Vermont
title_fullStr A method of selection of cable harvesting machines for Vermont
title_full_unstemmed A method of selection of cable harvesting machines for Vermont
title_sort method of selection of cable harvesting machines for vermont
publisher Oregon State University
url https://ir.library.oregonstate.edu/concern/graduate_projects/9z903490p
long_lat ENVELOPE(-45.689,-45.689,-60.733,-60.733)
ENVELOPE(-128.637,-128.637,54.450,54.450)
ENVELOPE(-135.921,-135.921,61.833,61.833)
geographic The Landing
Thunderbird
Green Mountain
geographic_facet The Landing
Thunderbird
Green Mountain
genre Newfoundland
genre_facet Newfoundland
op_relation https://ir.library.oregonstate.edu/concern/graduate_projects/9z903490p
op_rights Copyright Not Evaluated
_version_ 1796313453556662272