a multi parametric criteria for tidal energy converters siting in marine and fluvial environments

Abstract Marine renewable energy deployment involves site resource assessment as strategic support for installation and optimization. This part of the design needs to be based on best available measurement technologies and deployment methods, minimizing the investments. The siting and design of a ki...

Full description

Bibliographic Details
Published in:Energy Procedia
Main Authors: G.Lo Zupone, S. Massaro, S. Barbarelli, R. Sulpizio
Format: Article in Journal/Newspaper
Language:English
Published: 2018
Subjects:
Online Access:https://www.openaccessrepository.it/record/35146
https://doi.org/10.1016/j.egypro.2017.12.052