Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007

Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Mak...

Full description

Bibliographic Details
Other Authors: National Fisheries Resources Research Institute
Format: Book
Language:English
Published: National Fisheries Resources Research Institute (NaFIRRI) 2007
Subjects:
Online Access:http://hdl.handle.net/1834/32789
id ftoceandocs:oai:aquadocs.org:1834/32789
record_format openpolar
spelling ftoceandocs:oai:aquadocs.org:1834/32789 2023-05-15T16:02:46+02:00 Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007 National Fisheries Resources Research Institute 2007 application/pdf 15 http://hdl.handle.net/1834/32789 en eng National Fisheries Resources Research Institute (NaFIRRI) Jinja, Uganda http://hdl.handle.net/1834/32789 http://aquaticcommons.org/id/eprint/17144 4230 2016-03-01 14:25:04 17144 National Fisheries Resources Research Institute, Uganda Environment Fisheries monograph 2007 ftoceandocs 2023-04-06T17:04:45Z Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Makwanzi) and the immediate downstream .transect (Buyala-Kikubamutwe). The routine monitoring surveys were designed to be conducted twice a week at each of the tWo transects. It was anticipated that major immediate impacts were to occur during construction, and these needed to be known by BEL as part of a mitigation strategy. For example, the construction of it cofferdam could be accompanied by rapid changes in water quality and quantity downstream of the construction. These changes in turn could affect the fish catch and would probably be missed by the quarterly monitoring already in place. Therefore, a major cbjective of the more regular and rapid monitoring was to discern immediate impacts of construction activities by focusing on selected water quality parameters (total suspended solids, water conductivity, temperature, dissolved oxygen and pH) and fish catch characteristics (total catch, catch rates and value of the catch) Prepared for Bujagali Energy Limited (BEL) Book Dumbbell Island IODE-UNESCO: OceanDocs - E-Repository of Ocean Publications Dumbbell Island ENVELOPE(-67.583,-67.583,-68.717,-68.717)
institution Open Polar
collection IODE-UNESCO: OceanDocs - E-Repository of Ocean Publications
op_collection_id ftoceandocs
language English
topic Environment
Fisheries
spellingShingle Environment
Fisheries
Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
topic_facet Environment
Fisheries
description Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Makwanzi) and the immediate downstream .transect (Buyala-Kikubamutwe). The routine monitoring surveys were designed to be conducted twice a week at each of the tWo transects. It was anticipated that major immediate impacts were to occur during construction, and these needed to be known by BEL as part of a mitigation strategy. For example, the construction of it cofferdam could be accompanied by rapid changes in water quality and quantity downstream of the construction. These changes in turn could affect the fish catch and would probably be missed by the quarterly monitoring already in place. Therefore, a major cbjective of the more regular and rapid monitoring was to discern immediate impacts of construction activities by focusing on selected water quality parameters (total suspended solids, water conductivity, temperature, dissolved oxygen and pH) and fish catch characteristics (total catch, catch rates and value of the catch) Prepared for Bujagali Energy Limited (BEL)
author2 National Fisheries Resources Research Institute
format Book
title Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
title_short Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
title_full Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
title_fullStr Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
title_full_unstemmed Environmental and social impact monitoring of the Bujagali Hydropower Project (BHPP), Uganda Fisheries Component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the Bujagali Hydropower construction site, 29th September - 28th October 2007
title_sort environmental and social impact monitoring of the bujagali hydropower project (bhpp), uganda fisheries component: monthly patterns in physico-chemical conditions and fish catch in the immediate vicinity of the bujagali hydropower construction site, 29th september - 28th october 2007
publisher National Fisheries Resources Research Institute (NaFIRRI)
publishDate 2007
url http://hdl.handle.net/1834/32789
long_lat ENVELOPE(-67.583,-67.583,-68.717,-68.717)
geographic Dumbbell Island
geographic_facet Dumbbell Island
genre Dumbbell Island
genre_facet Dumbbell Island
op_source http://aquaticcommons.org/id/eprint/17144
4230
2016-03-01 14:25:04
17144
National Fisheries Resources Research Institute, Uganda
op_relation http://hdl.handle.net/1834/32789
_version_ 1766398460089597952