Optimization of Resource Allocation Using Queueing Theory
As the ice in the Arctic region is melting, new areas will open for oil exploration and production. These areas are however remote, with long sailing times from shore. In addition, the main warehouses of the oil companies are located in the southwestern part of Norway, thus increasing the transporta...
Main Author: | |
---|---|
Other Authors: | |
Format: | Master Thesis |
Language: | English |
Published: |
NTNU
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/11250/2350760 |
id |
ftntnutrondheimi:oai:ntnuopen.ntnu.no:11250/2350760 |
---|---|
record_format |
openpolar |
spelling |
ftntnutrondheimi:oai:ntnuopen.ntnu.no:11250/2350760 2023-05-15T15:19:33+02:00 Optimization of Resource Allocation Using Queueing Theory Hellum, Håkon Arne Torp Asbjørnslett, Bjørn Egil 2015 http://hdl.handle.net/11250/2350760 eng eng NTNU ntnudaim:13220 http://hdl.handle.net/11250/2350760 69 Marin teknikk Marin prosjektering og logistikk Master thesis 2015 ftntnutrondheimi 2019-09-17T06:50:58Z As the ice in the Arctic region is melting, new areas will open for oil exploration and production. These areas are however remote, with long sailing times from shore. In addition, the main warehouses of the oil companies are located in the southwestern part of Norway, thus increasing the transportation distances further. To operate, the offshore installations need a lot of equipment, some of which is absolutely necessary for the operation, so called mission critical equipment. This type of equipment have been the main focus in this thesis. When this type of equipment breaks down, or it is no longer needed, it is sent to one of the main warehouses for maintenance and recalibration. By storing spares of this equipment closer to the installation, response time when equipment breaks down is reduced. Three possible supply chain scenarios were created. The first scenario is the current scenario, where equipment is sent by trucks from one of the main warehouses and to the Hammerfest depot, from where it is shipped to the offshore installations by Platform Supply Vessels (PSVs). The two other scenarios utilize a offshore depot. The depot is assumed to be a converted bulk-carrier. In scenario 2 this depot vessel sails from Hammerfest, while in Scenario 3 it sails from one of the main warehouses. For scenario 2, the equipment is transported by truck to Hammerfest. For a continous operation, it was assumed that two vessels are needed. By setting an operability constraint the supply chain could be optimized with respect to costs. Operability is the percentage of time inventory of the equipment is present at the installation. Then, by combining the Genetic Algorithm in MATLAB with queueing theory, this optimization problem was solved. It was created as a closed queueing network, meaning that a finite population of customers travel inside the network. This was chosen due to the nature of the equipment studied. The steady state probabilities was calculated using Buzen s algorithm. Three demand cases were studied. The first case was low demand, where demand arises twice a year. In the medium demand case, demand arises every month. The final case, high demand, demand arises twice a month. In queueing theory, demand is modelled as arriving customers. In a closed queueing network where there are no customers arriving from outside the system, this arrival rate is equal to the service rate at the offshore installation. By varying the transportation costs for the system, an offshore depot vessel seemed more viable for the high demand case, thus preferring to allocate the inventory closer to the installation. Master Thesis Arctic Hammerfest NTNU Open Archive (Norwegian University of Science and Technology) Arctic Norway |
institution |
Open Polar |
collection |
NTNU Open Archive (Norwegian University of Science and Technology) |
op_collection_id |
ftntnutrondheimi |
language |
English |
topic |
Marin teknikk Marin prosjektering og logistikk |
spellingShingle |
Marin teknikk Marin prosjektering og logistikk Hellum, Håkon Arne Torp Optimization of Resource Allocation Using Queueing Theory |
topic_facet |
Marin teknikk Marin prosjektering og logistikk |
description |
As the ice in the Arctic region is melting, new areas will open for oil exploration and production. These areas are however remote, with long sailing times from shore. In addition, the main warehouses of the oil companies are located in the southwestern part of Norway, thus increasing the transportation distances further. To operate, the offshore installations need a lot of equipment, some of which is absolutely necessary for the operation, so called mission critical equipment. This type of equipment have been the main focus in this thesis. When this type of equipment breaks down, or it is no longer needed, it is sent to one of the main warehouses for maintenance and recalibration. By storing spares of this equipment closer to the installation, response time when equipment breaks down is reduced. Three possible supply chain scenarios were created. The first scenario is the current scenario, where equipment is sent by trucks from one of the main warehouses and to the Hammerfest depot, from where it is shipped to the offshore installations by Platform Supply Vessels (PSVs). The two other scenarios utilize a offshore depot. The depot is assumed to be a converted bulk-carrier. In scenario 2 this depot vessel sails from Hammerfest, while in Scenario 3 it sails from one of the main warehouses. For scenario 2, the equipment is transported by truck to Hammerfest. For a continous operation, it was assumed that two vessels are needed. By setting an operability constraint the supply chain could be optimized with respect to costs. Operability is the percentage of time inventory of the equipment is present at the installation. Then, by combining the Genetic Algorithm in MATLAB with queueing theory, this optimization problem was solved. It was created as a closed queueing network, meaning that a finite population of customers travel inside the network. This was chosen due to the nature of the equipment studied. The steady state probabilities was calculated using Buzen s algorithm. Three demand cases were studied. The first case was low demand, where demand arises twice a year. In the medium demand case, demand arises every month. The final case, high demand, demand arises twice a month. In queueing theory, demand is modelled as arriving customers. In a closed queueing network where there are no customers arriving from outside the system, this arrival rate is equal to the service rate at the offshore installation. By varying the transportation costs for the system, an offshore depot vessel seemed more viable for the high demand case, thus preferring to allocate the inventory closer to the installation. |
author2 |
Asbjørnslett, Bjørn Egil |
format |
Master Thesis |
author |
Hellum, Håkon Arne Torp |
author_facet |
Hellum, Håkon Arne Torp |
author_sort |
Hellum, Håkon Arne Torp |
title |
Optimization of Resource Allocation Using Queueing Theory |
title_short |
Optimization of Resource Allocation Using Queueing Theory |
title_full |
Optimization of Resource Allocation Using Queueing Theory |
title_fullStr |
Optimization of Resource Allocation Using Queueing Theory |
title_full_unstemmed |
Optimization of Resource Allocation Using Queueing Theory |
title_sort |
optimization of resource allocation using queueing theory |
publisher |
NTNU |
publishDate |
2015 |
url |
http://hdl.handle.net/11250/2350760 |
geographic |
Arctic Norway |
geographic_facet |
Arctic Norway |
genre |
Arctic Hammerfest |
genre_facet |
Arctic Hammerfest |
op_source |
69 |
op_relation |
ntnudaim:13220 http://hdl.handle.net/11250/2350760 |
_version_ |
1766349738336059392 |