Page 530

In 1995, the North Dakota State Legislature repealed a portion of the North Dakota Century Code dealing with the preservation of wetlands. The National Wildlife Federation interpreted this action as withdrawal of State support for the Statement of Principles and withdrew from the collaborative proce...

Full description

Bibliographic Details
Language:unknown
Subjects:
Online Access:http://cdm16921.contentdm.oclc.org/cdm/ref/collection/ndbb/id/9414
id ftnorthdakotastu:oai:cdm16921.contentdm.oclc.org:ndbb/9414
record_format openpolar
spelling ftnorthdakotastu:oai:cdm16921.contentdm.oclc.org:ndbb/9414 2023-05-15T16:35:32+02:00 Page 530 http://cdm16921.contentdm.oclc.org/cdm/ref/collection/ndbb/id/9414 unknown http://cdm16921.contentdm.oclc.org/cdm/ref/collection/ndbb/id/9414 ftnorthdakotastu 2017-12-14T11:05:20Z In 1995, the North Dakota State Legislature repealed a portion of the North Dakota Century Code dealing with the preservation of wetlands. The National Wildlife Federation interpreted this action as withdrawal of State support for the Statement of Principles and withdrew from the collaborative process. Garrison Diversion Today Today, Garrison Diversion has taken the project one step further. The proposed Garrison Diversion Completion Plan proposed by the District, calls for $400 million in federal appropriations. This would complete a downsized principal water delivery system to provide reliable, high-quality water to the Red River Valley, Devils Lake Basin, and the Oakes Test Area. The District has proposed to replace the Lonetree Reservoir and Sykeston Canal with a 22-mile pipeline that would also be used as a treatment facility to prevent the transfer of biota to the Hudson Bay watershed. The state of North Dakota will be responsible for matching 15 percent of the reimbursable project costs. The State, or its designee, would also be responsible for construction, operation and maintenance. Cost of the existing facilities would be deemed as non-repayable costs. In exchange for de-authorizing the remaining non-Indian federal irrigation acreage, a portion of the Pick-Sloan power revenues for irrigation would be converted to an economic recovery fund. These funds would mainly be used for development and utilization of major MR&I water systems across the state. An additional amount of money from the economic recovery fund would be used for Indian MR&I water systems on the Fort Berthold, Standing Rock and Spirit Lake Reservations. These projects would meet the economic, public health and environmental needs on those reservations and are still in the development process with representatives of the reservations. All of the future Garrison Diversion facilities and programs would meet the requirements from previous legislation and would deliver and meet the demands and needs of the state for a high-quality, reliable source of Missouri River water. 530 Chapter 10 Physical Characteristics Other/Unknown Material Hudson Bay North Dakota State University (NDSU): Digital Horizons Hudson Bay Indian Hudson Devils Lake ENVELOPE(-107.884,-107.884,56.717,56.717) Spirit Lake ENVELOPE(-134.740,-134.740,60.254,60.254)
institution Open Polar
collection North Dakota State University (NDSU): Digital Horizons
op_collection_id ftnorthdakotastu
language unknown
description In 1995, the North Dakota State Legislature repealed a portion of the North Dakota Century Code dealing with the preservation of wetlands. The National Wildlife Federation interpreted this action as withdrawal of State support for the Statement of Principles and withdrew from the collaborative process. Garrison Diversion Today Today, Garrison Diversion has taken the project one step further. The proposed Garrison Diversion Completion Plan proposed by the District, calls for $400 million in federal appropriations. This would complete a downsized principal water delivery system to provide reliable, high-quality water to the Red River Valley, Devils Lake Basin, and the Oakes Test Area. The District has proposed to replace the Lonetree Reservoir and Sykeston Canal with a 22-mile pipeline that would also be used as a treatment facility to prevent the transfer of biota to the Hudson Bay watershed. The state of North Dakota will be responsible for matching 15 percent of the reimbursable project costs. The State, or its designee, would also be responsible for construction, operation and maintenance. Cost of the existing facilities would be deemed as non-repayable costs. In exchange for de-authorizing the remaining non-Indian federal irrigation acreage, a portion of the Pick-Sloan power revenues for irrigation would be converted to an economic recovery fund. These funds would mainly be used for development and utilization of major MR&I water systems across the state. An additional amount of money from the economic recovery fund would be used for Indian MR&I water systems on the Fort Berthold, Standing Rock and Spirit Lake Reservations. These projects would meet the economic, public health and environmental needs on those reservations and are still in the development process with representatives of the reservations. All of the future Garrison Diversion facilities and programs would meet the requirements from previous legislation and would deliver and meet the demands and needs of the state for a high-quality, reliable source of Missouri River water. 530 Chapter 10 Physical Characteristics
title Page 530
spellingShingle Page 530
title_short Page 530
title_full Page 530
title_fullStr Page 530
title_full_unstemmed Page 530
title_sort page 530
url http://cdm16921.contentdm.oclc.org/cdm/ref/collection/ndbb/id/9414
long_lat ENVELOPE(-107.884,-107.884,56.717,56.717)
ENVELOPE(-134.740,-134.740,60.254,60.254)
geographic Hudson Bay
Indian
Hudson
Devils Lake
Spirit Lake
geographic_facet Hudson Bay
Indian
Hudson
Devils Lake
Spirit Lake
genre Hudson Bay
genre_facet Hudson Bay
op_relation http://cdm16921.contentdm.oclc.org/cdm/ref/collection/ndbb/id/9414
_version_ 1766025767294074880