The Troms line : an economic analysis

The aim of this thesis is to bring the old assessments regarding the Troms Line back to life again, and examine whether it would be a good idea, from an economic point of view, to revive the project. When examining the regional conditions, it is evident that there is one factor that has changed, and...

Full description

Bibliographic Details
Main Author: Tjørve, Thomas
Format: Master Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://hdl.handle.net/11250/223990
id ftnorgehandelshs:oai:openaccess.nhh.no:11250/223990
record_format openpolar
spelling ftnorgehandelshs:oai:openaccess.nhh.no:11250/223990 2023-05-15T15:37:27+02:00 The Troms line : an economic analysis Tjørve, Thomas 2014 application/pdf http://hdl.handle.net/11250/223990 eng eng http://hdl.handle.net/11250/223990 energy natural resources and the environment VDP::Social science: 200::Economics: 210::Business: 213 Master thesis 2014 ftnorgehandelshs 2021-10-19T20:06:38Z The aim of this thesis is to bring the old assessments regarding the Troms Line back to life again, and examine whether it would be a good idea, from an economic point of view, to revive the project. When examining the regional conditions, it is evident that there is one factor that has changed, and is expected to change more in the coming years. This is the mined volumes of minerals, especially in Sweden, but also in Finland. The most notable of course being iron ore. In conjunction with withdrawing ice, and the gradual opening of the Northeast Passage, the connection of the largest city in the region – Tromsø – to the rail network would, in some aspects, seem reasonable. The thesis bases its analysis on the guide provided by the National Rail Administration and the values it provides, and derives numbers regarding the current traffic in the region from the National Public Roads Administration and published statistics by Statistics Norway. The shortage of potential passengers in the region is acknowledged as the main cause for the project being found to be very unprofitable. There were two separate route alternatives being examined, both following the same route from Narvik to Andselv. From Andselv, one alternative is primarily based on bridge-building and crosses Malangen on its way to Tromsø. The second alternative passes through Nordkjosbotn and follows the Balsfjord on its way to Tromsø. The first alternative was found to be the most profitable, but even with very beneficial scenarios examined in the performed sensitivity analyses, there seems to be no basis to recommend such a considerable investment. The thesis therefore concludes with a recommendation of not pursuing the project, with one exception: If the increasing demand for shipping cannot be covered by the port in Narvik, or other bottlenecks, the willingness-to-pay by foreign interest could be assumed to be quite high, as alternatives are scarce and significantly more costly. A co-funding of some kind, by private or/and public foreign interests could render an otherwise unprofitable project to become profitable. nhhmas Master Thesis Balsfjord Malangen Narvik Narvik Northeast Passage Tromsø Troms NHH Brage Open institutional repository (Norwegian School of Economics) Andselv ENVELOPE(18.516,18.516,69.066,69.066) Balsfjord ENVELOPE(19.227,19.227,69.240,69.240) Malangen ENVELOPE(18.598,18.598,69.400,69.400) Narvik ENVELOPE(17.427,17.427,68.438,68.438) Nordkjosbotn ENVELOPE(21.051,21.051,69.793,69.793) Norway Tromsø
institution Open Polar
collection NHH Brage Open institutional repository (Norwegian School of Economics)
op_collection_id ftnorgehandelshs
language English
topic energy
natural resources and the environment
VDP::Social science: 200::Economics: 210::Business: 213
spellingShingle energy
natural resources and the environment
VDP::Social science: 200::Economics: 210::Business: 213
Tjørve, Thomas
The Troms line : an economic analysis
topic_facet energy
natural resources and the environment
VDP::Social science: 200::Economics: 210::Business: 213
description The aim of this thesis is to bring the old assessments regarding the Troms Line back to life again, and examine whether it would be a good idea, from an economic point of view, to revive the project. When examining the regional conditions, it is evident that there is one factor that has changed, and is expected to change more in the coming years. This is the mined volumes of minerals, especially in Sweden, but also in Finland. The most notable of course being iron ore. In conjunction with withdrawing ice, and the gradual opening of the Northeast Passage, the connection of the largest city in the region – Tromsø – to the rail network would, in some aspects, seem reasonable. The thesis bases its analysis on the guide provided by the National Rail Administration and the values it provides, and derives numbers regarding the current traffic in the region from the National Public Roads Administration and published statistics by Statistics Norway. The shortage of potential passengers in the region is acknowledged as the main cause for the project being found to be very unprofitable. There were two separate route alternatives being examined, both following the same route from Narvik to Andselv. From Andselv, one alternative is primarily based on bridge-building and crosses Malangen on its way to Tromsø. The second alternative passes through Nordkjosbotn and follows the Balsfjord on its way to Tromsø. The first alternative was found to be the most profitable, but even with very beneficial scenarios examined in the performed sensitivity analyses, there seems to be no basis to recommend such a considerable investment. The thesis therefore concludes with a recommendation of not pursuing the project, with one exception: If the increasing demand for shipping cannot be covered by the port in Narvik, or other bottlenecks, the willingness-to-pay by foreign interest could be assumed to be quite high, as alternatives are scarce and significantly more costly. A co-funding of some kind, by private or/and public foreign interests could render an otherwise unprofitable project to become profitable. nhhmas
format Master Thesis
author Tjørve, Thomas
author_facet Tjørve, Thomas
author_sort Tjørve, Thomas
title The Troms line : an economic analysis
title_short The Troms line : an economic analysis
title_full The Troms line : an economic analysis
title_fullStr The Troms line : an economic analysis
title_full_unstemmed The Troms line : an economic analysis
title_sort troms line : an economic analysis
publishDate 2014
url http://hdl.handle.net/11250/223990
long_lat ENVELOPE(18.516,18.516,69.066,69.066)
ENVELOPE(19.227,19.227,69.240,69.240)
ENVELOPE(18.598,18.598,69.400,69.400)
ENVELOPE(17.427,17.427,68.438,68.438)
ENVELOPE(21.051,21.051,69.793,69.793)
geographic Andselv
Balsfjord
Malangen
Narvik
Nordkjosbotn
Norway
Tromsø
geographic_facet Andselv
Balsfjord
Malangen
Narvik
Nordkjosbotn
Norway
Tromsø
genre Balsfjord
Malangen
Narvik
Narvik
Northeast Passage
Tromsø
Troms
genre_facet Balsfjord
Malangen
Narvik
Narvik
Northeast Passage
Tromsø
Troms
op_relation http://hdl.handle.net/11250/223990
_version_ 1766368024252645376