Muskrat Falls Project-A Critical Review

The Muskrat falls hydroelectric project in Newfoundland and Labrador is an 824 MW hydroelectric facility and over 1600 km of transmission lines across the province including a maritime link between Newfoundland and Nova Scotia. It has important benefits for the province such as connecting it to the...

Full description

Bibliographic Details
Main Author: Elsaraf, Hashem
Format: Report
Language:English
Published: Memorial University of Newfoundland 2020
Subjects:
Online Access:https://research.library.mun.ca/14917/
https://research.library.mun.ca/14917/1/Muskrat%20Falls%20Project-A%20Critical%20Review.pdf
id ftmemorialuniv:oai:research.library.mun.ca:14917
record_format openpolar
spelling ftmemorialuniv:oai:research.library.mun.ca:14917 2023-10-01T03:57:35+02:00 Muskrat Falls Project-A Critical Review Elsaraf, Hashem 2020 application/pdf https://research.library.mun.ca/14917/ https://research.library.mun.ca/14917/1/Muskrat%20Falls%20Project-A%20Critical%20Review.pdf en eng Memorial University of Newfoundland https://research.library.mun.ca/14917/1/Muskrat%20Falls%20Project-A%20Critical%20Review.pdf Elsaraf, Hashem <https://research.library.mun.ca/view/creator_az/Elsaraf=3AHashem=3A=3A.html> (2020) Muskrat Falls Project-A Critical Review. Research Report. Memorial University of Newfoundland, St. John's, Newfoundland and Labrador. (Submitted) cc_by_nc Report NonPeerReviewed 2020 ftmemorialuniv 2023-09-03T06:50:00Z The Muskrat falls hydroelectric project in Newfoundland and Labrador is an 824 MW hydroelectric facility and over 1600 km of transmission lines across the province including a maritime link between Newfoundland and Nova Scotia. It has important benefits for the province such as connecting it to the North American electricity market, increasing employment for local labor, CO2 emissions reduction, and making the province’s electricity 98% renewable. However, the project has faced many issues such as economic, temporal, political and environmental problems. In this article, a study is presented which highlights the different aspects of this project and the process involved in its assessment and implementation. Environmental and economic issues related to Methyl mercury, impact of COVID -19 pandemic, impact of oil prices and the contribution of the hiding hand principle to the project’s development were addressed. From an engineering perspective and to expand on the wind alternative, original work designing a wind project of similar generation capacity to Muskrat Falls (4.9 TWh) is presented. Using a multifactorial wind farm sitting approach, four sites for possible wind energy deployment were selected which are: Portugal Cove, Bonavista, Grand Banks and Saint Bride’s. Through a review of the most prominent wind farms inside and outside Canada, five types of wind turbines were selected for the study which are GE-2.5 XL, Vestas 164, Enercon E-126, GE 1.5s and Siemens SWT 3.6. A parametric study of 36 systems was then conducted to test each turbine model at each location at different hub heights. The study included both financial (LCOE, Profit) and area (Energy density, Profit/Area) considerations. After careful comparison, Bonavista wind site with Enercon-126 wind turbine at 135 m hub height was justifiably the best system. The system is then further developed by adding ACS880 inverter from ABB (for power conditioning and HVDC transmission) and reporting on the final system values (4.83 TWh energy production, 884 ... Report Newfoundland Memorial University of Newfoundland: Research Repository Newfoundland Canada
institution Open Polar
collection Memorial University of Newfoundland: Research Repository
op_collection_id ftmemorialuniv
language English
description The Muskrat falls hydroelectric project in Newfoundland and Labrador is an 824 MW hydroelectric facility and over 1600 km of transmission lines across the province including a maritime link between Newfoundland and Nova Scotia. It has important benefits for the province such as connecting it to the North American electricity market, increasing employment for local labor, CO2 emissions reduction, and making the province’s electricity 98% renewable. However, the project has faced many issues such as economic, temporal, political and environmental problems. In this article, a study is presented which highlights the different aspects of this project and the process involved in its assessment and implementation. Environmental and economic issues related to Methyl mercury, impact of COVID -19 pandemic, impact of oil prices and the contribution of the hiding hand principle to the project’s development were addressed. From an engineering perspective and to expand on the wind alternative, original work designing a wind project of similar generation capacity to Muskrat Falls (4.9 TWh) is presented. Using a multifactorial wind farm sitting approach, four sites for possible wind energy deployment were selected which are: Portugal Cove, Bonavista, Grand Banks and Saint Bride’s. Through a review of the most prominent wind farms inside and outside Canada, five types of wind turbines were selected for the study which are GE-2.5 XL, Vestas 164, Enercon E-126, GE 1.5s and Siemens SWT 3.6. A parametric study of 36 systems was then conducted to test each turbine model at each location at different hub heights. The study included both financial (LCOE, Profit) and area (Energy density, Profit/Area) considerations. After careful comparison, Bonavista wind site with Enercon-126 wind turbine at 135 m hub height was justifiably the best system. The system is then further developed by adding ACS880 inverter from ABB (for power conditioning and HVDC transmission) and reporting on the final system values (4.83 TWh energy production, 884 ...
format Report
author Elsaraf, Hashem
spellingShingle Elsaraf, Hashem
Muskrat Falls Project-A Critical Review
author_facet Elsaraf, Hashem
author_sort Elsaraf, Hashem
title Muskrat Falls Project-A Critical Review
title_short Muskrat Falls Project-A Critical Review
title_full Muskrat Falls Project-A Critical Review
title_fullStr Muskrat Falls Project-A Critical Review
title_full_unstemmed Muskrat Falls Project-A Critical Review
title_sort muskrat falls project-a critical review
publisher Memorial University of Newfoundland
publishDate 2020
url https://research.library.mun.ca/14917/
https://research.library.mun.ca/14917/1/Muskrat%20Falls%20Project-A%20Critical%20Review.pdf
geographic Newfoundland
Canada
geographic_facet Newfoundland
Canada
genre Newfoundland
genre_facet Newfoundland
op_relation https://research.library.mun.ca/14917/1/Muskrat%20Falls%20Project-A%20Critical%20Review.pdf
Elsaraf, Hashem <https://research.library.mun.ca/view/creator_az/Elsaraf=3AHashem=3A=3A.html> (2020) Muskrat Falls Project-A Critical Review. Research Report. Memorial University of Newfoundland, St. John's, Newfoundland and Labrador. (Submitted)
op_rights cc_by_nc
_version_ 1778529272834555904