THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization

This is a master thesis done in the program of industrial design engineering at Luleå University ofTechnology, conducted during the spring of 2021. The project is a collaboration with Epiroc RockDrills AB which is a leading global company in the mining industries, and the workshop in which thisthesi...

Full description

Bibliographic Details
Main Author: Backéus, Lina
Format: Bachelor Thesis
Language:English
Published: Luleå tekniska universitet, Institutionen för ekonomi, teknik, konst och samhälle 2021
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85890
id ftluleatu:oai:DiVA.org:ltu-85890
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-85890 2023-05-15T17:09:18+02:00 THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization Backéus, Lina 2021 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85890 eng eng Luleå tekniska universitet, Institutionen för ekonomi, teknik, konst och samhälle http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85890 info:eu-repo/semantics/openAccess Epiroc layout change work instruction setup SMED production efficiency utilization Production Engineering Human Work Science and Ergonomics Produktionsteknik arbetsvetenskap och ergonomi Design Student thesis info:eu-repo/semantics/bachelorThesis text 2021 ftluleatu 2022-10-25T20:57:31Z This is a master thesis done in the program of industrial design engineering at Luleå University ofTechnology, conducted during the spring of 2021. The project is a collaboration with Epiroc RockDrills AB which is a leading global company in the mining industries, and the workshop in which thisthesis is made manufactures and assembles rock drills sold worldwide. The aim of this thesis is toincrease the utilization of three lathes in the workshop that are often left unused when theiroperators have to leave the machines to perform other tasks. This is due to short operation timesthat require the operator to be present.The project follows a cyclic method in order to force the work forward without worrying aboutmissing information. There were three cycles with different aim. In the first cycle, the focus was onplanning the project and mapping the current state. In the second, a requirement specification wasmade and concepts were created. These concepts were further developed in the third cycle. Finally arecommendation was made.The current state was mapped using different methods like interviews and spaghetti diagram. Thesemethods showed that the lathes were unused mainly during setups, and that setups were timeconsuming due to equipment being placed far away from the lathes. The result showed that manyproblems could be related to bad layout design and lack of standardized work. In order to create abetter layout for the operators, a relationship chart was made and several suggestions constructedbased on it. The purpose of the layout changes was to get necessary equipment closer to the lathesin order for the setups to be performed faster. All suggestions were compared to the requirementspecification and only three were further developed during the third cycle.The lean tool SMED (Single Minute Exchange of Die) was used to create a standard for setups. Thisstandard was further developed into a work instruction to be better visualized for the operators.The final recommendation is to make layout changes according to one ... Bachelor Thesis Luleå Luleå Luleå Luleå University of Technology Publications (DiVA)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Epiroc
layout change
work instruction
setup
SMED
production
efficiency
utilization
Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
Design
spellingShingle Epiroc
layout change
work instruction
setup
SMED
production
efficiency
utilization
Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
Design
Backéus, Lina
THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
topic_facet Epiroc
layout change
work instruction
setup
SMED
production
efficiency
utilization
Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
Design
description This is a master thesis done in the program of industrial design engineering at Luleå University ofTechnology, conducted during the spring of 2021. The project is a collaboration with Epiroc RockDrills AB which is a leading global company in the mining industries, and the workshop in which thisthesis is made manufactures and assembles rock drills sold worldwide. The aim of this thesis is toincrease the utilization of three lathes in the workshop that are often left unused when theiroperators have to leave the machines to perform other tasks. This is due to short operation timesthat require the operator to be present.The project follows a cyclic method in order to force the work forward without worrying aboutmissing information. There were three cycles with different aim. In the first cycle, the focus was onplanning the project and mapping the current state. In the second, a requirement specification wasmade and concepts were created. These concepts were further developed in the third cycle. Finally arecommendation was made.The current state was mapped using different methods like interviews and spaghetti diagram. Thesemethods showed that the lathes were unused mainly during setups, and that setups were timeconsuming due to equipment being placed far away from the lathes. The result showed that manyproblems could be related to bad layout design and lack of standardized work. In order to create abetter layout for the operators, a relationship chart was made and several suggestions constructedbased on it. The purpose of the layout changes was to get necessary equipment closer to the lathesin order for the setups to be performed faster. All suggestions were compared to the requirementspecification and only three were further developed during the third cycle.The lean tool SMED (Single Minute Exchange of Die) was used to create a standard for setups. Thisstandard was further developed into a work instruction to be better visualized for the operators.The final recommendation is to make layout changes according to one ...
format Bachelor Thesis
author Backéus, Lina
author_facet Backéus, Lina
author_sort Backéus, Lina
title THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
title_short THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
title_full THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
title_fullStr THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
title_full_unstemmed THE BEST WAY TO WORK : Increasing the efficiency through layout changes and standardization
title_sort best way to work : increasing the efficiency through layout changes and standardization
publisher Luleå tekniska universitet, Institutionen för ekonomi, teknik, konst och samhälle
publishDate 2021
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85890
genre Luleå
Luleå
Luleå
genre_facet Luleå
Luleå
Luleå
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-85890
op_rights info:eu-repo/semantics/openAccess
_version_ 1766065345789952000