Production Development : Layout Project at Lundqvist Trävaru AB

The purpose of the master thesis has been to examine the production system at the company Lundqvist Trävaru AB and use the gathered information to create a layout suggestion together with a couple of improvement ideas. The thesis is the final part of the Industrial Design Engineering programme at Lu...

Full description

Bibliographic Details
Main Author: Berglund, Andreas
Format: Bachelor Thesis
Language:English
Published: Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle 2019
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-77077
id ftluleatu:oai:DiVA.org:ltu-77077
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-77077 2023-05-15T17:09:17+02:00 Production Development : Layout Project at Lundqvist Trävaru AB Berglund, Andreas 2019 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-77077 eng eng Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-77077 info:eu-repo/semantics/openAccess Production Development Prefabricated Building Kits Layout Development LEAN Material Handling Production Flow Produktionsutveckling Prefabricerade Byggsatser Layoututveckling Materialhantering Produktionsflöde Other Engineering and Technologies Annan teknik Student thesis info:eu-repo/semantics/bachelorThesis text 2019 ftluleatu 2022-10-25T20:55:43Z The purpose of the master thesis has been to examine the production system at the company Lundqvist Trävaru AB and use the gathered information to create a layout suggestion together with a couple of improvement ideas. The thesis is the final part of the Industrial Design Engineering programme at Luleå University of Technology (LTU). Lundqvist Trävaru AB is a manufacturing company that specializes in producing prefabricated building kits out of wood, but the insufficient size of their current factory located in the industrial area of Öjebyn on the outskirts of Piteå, have created a need to relocate to alarger site. This new site is located at Haraholmen south of Piteå. The aim and objective have therefore been to develop a layout suggestion as well as a couple of improvement ideas, with the purpose of solving the identified problems at the current factory, thereby making sure that they do not reappear at the new site. Methods in the form of interviews, observations and documentation reviews were performed to identify potential problems with the production system and the work organization. To aid the investigation of the current factory, literature reviews of scientific books and articles were also performed during the project, with the purpose of giving the thesis a solid scientific foundation. After an overview of the production system had been created, the next step was to analyze the identified problems. These affected many different aspects of the company, for instance the material handling, work organization, flow ofinformation, production flexibility, inventory capacity and production flow. The main problem that in turn caused many of the identified problems was the insufficient inventory capacity, which led to problems with overflowing inventories and long delivery times for materials. This in turn affected thematerial handling negatively and made it hard to keep track of materials in the factory. Additional problems that were identified was divided workstations, scattered areas for material storage, an ... Bachelor Thesis Luleå Luleå Luleå Piteå Luleå University of Technology Publications (DiVA) Haraholmen ENVELOPE(7.894,7.894,63.167,63.167)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Production Development
Prefabricated Building Kits
Layout Development
LEAN
Material Handling
Production Flow
Produktionsutveckling
Prefabricerade Byggsatser
Layoututveckling
Materialhantering
Produktionsflöde
Other Engineering and Technologies
Annan teknik
spellingShingle Production Development
Prefabricated Building Kits
Layout Development
LEAN
Material Handling
Production Flow
Produktionsutveckling
Prefabricerade Byggsatser
Layoututveckling
Materialhantering
Produktionsflöde
Other Engineering and Technologies
Annan teknik
Berglund, Andreas
Production Development : Layout Project at Lundqvist Trävaru AB
topic_facet Production Development
Prefabricated Building Kits
Layout Development
LEAN
Material Handling
Production Flow
Produktionsutveckling
Prefabricerade Byggsatser
Layoututveckling
Materialhantering
Produktionsflöde
Other Engineering and Technologies
Annan teknik
description The purpose of the master thesis has been to examine the production system at the company Lundqvist Trävaru AB and use the gathered information to create a layout suggestion together with a couple of improvement ideas. The thesis is the final part of the Industrial Design Engineering programme at Luleå University of Technology (LTU). Lundqvist Trävaru AB is a manufacturing company that specializes in producing prefabricated building kits out of wood, but the insufficient size of their current factory located in the industrial area of Öjebyn on the outskirts of Piteå, have created a need to relocate to alarger site. This new site is located at Haraholmen south of Piteå. The aim and objective have therefore been to develop a layout suggestion as well as a couple of improvement ideas, with the purpose of solving the identified problems at the current factory, thereby making sure that they do not reappear at the new site. Methods in the form of interviews, observations and documentation reviews were performed to identify potential problems with the production system and the work organization. To aid the investigation of the current factory, literature reviews of scientific books and articles were also performed during the project, with the purpose of giving the thesis a solid scientific foundation. After an overview of the production system had been created, the next step was to analyze the identified problems. These affected many different aspects of the company, for instance the material handling, work organization, flow ofinformation, production flexibility, inventory capacity and production flow. The main problem that in turn caused many of the identified problems was the insufficient inventory capacity, which led to problems with overflowing inventories and long delivery times for materials. This in turn affected thematerial handling negatively and made it hard to keep track of materials in the factory. Additional problems that were identified was divided workstations, scattered areas for material storage, an ...
format Bachelor Thesis
author Berglund, Andreas
author_facet Berglund, Andreas
author_sort Berglund, Andreas
title Production Development : Layout Project at Lundqvist Trävaru AB
title_short Production Development : Layout Project at Lundqvist Trävaru AB
title_full Production Development : Layout Project at Lundqvist Trävaru AB
title_fullStr Production Development : Layout Project at Lundqvist Trävaru AB
title_full_unstemmed Production Development : Layout Project at Lundqvist Trävaru AB
title_sort production development : layout project at lundqvist trävaru ab
publisher Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle
publishDate 2019
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-77077
long_lat ENVELOPE(7.894,7.894,63.167,63.167)
geographic Haraholmen
geographic_facet Haraholmen
genre Luleå
Luleå
Luleå
Piteå
genre_facet Luleå
Luleå
Luleå
Piteå
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-77077
op_rights info:eu-repo/semantics/openAccess
_version_ 1766065327760736256