Studie av omskjutningar i tunneldrivningsprojekt

Conventional drill and blast tunnelling consists of mainly seven elements which together makes a cycle. This cycle includes drilling and blasting which are crucial factors in tunnelling projects, as these have a major influence on how the project will progress. After blasting there can be occurrence...

Full description

Bibliographic Details
Main Author: de Groot, Laura
Format: Bachelor Thesis
Language:Swedish
Published: Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser 2017
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66139
id ftluleatu:oai:DiVA.org:ltu-66139
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-66139 2024-06-09T07:48:37+00:00 Studie av omskjutningar i tunneldrivningsprojekt de Groot, Laura 2017 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66139 swe swe LuleÃ¥ tekniska universitet, Institutionen för samhällsbyggnad och naturresurser http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66139 info:eu-repo/semantics/openAccess tunnel sprängning glasögon omskjutning Mineral and Mine Engineering Mineral- och gruvteknik Student thesis info:eu-repo/semantics/bachelorThesis text 2017 ftluleatu 2024-05-15T08:03:22Z Conventional drill and blast tunnelling consists of mainly seven elements which together makes a cycle. This cycle includes drilling and blasting which are crucial factors in tunnelling projects, as these have a major influence on how the project will progress. After blasting there can be occurrences of under-break with so called bootholes in it and a re-blast is needed. This is expensive and time-consuming, and is therefore indefensible due to causing extra costs as well as a delay in the completion of the whole project. A solution for this problem is needed to avoid blasting second times. Due to laws regulating the allowed fracture zone in tunnel-blasting, contour blasting is performed. The reason behind why bootlegs emerges after blasting is still unknown and depends on many varied factors, such as geology, blast pattern and the volume of explosives used. Different tests are done while blasting, thereafter the results are evaluated and documented. Each test was tried three times to get as a most reliable result as possible. Among others the amount of explosives ranged, double detonators in poor rock sections and a new drill plan was made. The main theory behind this project was that the problem with bootlegs mainly depended om poor geological situations in the rock. None of the test however have been successful enough to solve the problem and after almost every blast there where bootholes in the remaining rock. Recommendations for further testing are using a less amount of explosives as this was a successful method in Björkdalsgruvan in northern Sweden. Another thing worth giving a try is to remove the “helping-row†because it seems like it is breaking the contour-row and not doing any difference. Bachelor Thesis Northern Sweden Luleå University of Technology Publications (DiVA)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language Swedish
topic tunnel
sprängning
glasögon
omskjutning
Mineral and Mine Engineering
Mineral- och gruvteknik
spellingShingle tunnel
sprängning
glasögon
omskjutning
Mineral and Mine Engineering
Mineral- och gruvteknik
de Groot, Laura
Studie av omskjutningar i tunneldrivningsprojekt
topic_facet tunnel
sprängning
glasögon
omskjutning
Mineral and Mine Engineering
Mineral- och gruvteknik
description Conventional drill and blast tunnelling consists of mainly seven elements which together makes a cycle. This cycle includes drilling and blasting which are crucial factors in tunnelling projects, as these have a major influence on how the project will progress. After blasting there can be occurrences of under-break with so called bootholes in it and a re-blast is needed. This is expensive and time-consuming, and is therefore indefensible due to causing extra costs as well as a delay in the completion of the whole project. A solution for this problem is needed to avoid blasting second times. Due to laws regulating the allowed fracture zone in tunnel-blasting, contour blasting is performed. The reason behind why bootlegs emerges after blasting is still unknown and depends on many varied factors, such as geology, blast pattern and the volume of explosives used. Different tests are done while blasting, thereafter the results are evaluated and documented. Each test was tried three times to get as a most reliable result as possible. Among others the amount of explosives ranged, double detonators in poor rock sections and a new drill plan was made. The main theory behind this project was that the problem with bootlegs mainly depended om poor geological situations in the rock. None of the test however have been successful enough to solve the problem and after almost every blast there where bootholes in the remaining rock. Recommendations for further testing are using a less amount of explosives as this was a successful method in Björkdalsgruvan in northern Sweden. Another thing worth giving a try is to remove the “helping-row†because it seems like it is breaking the contour-row and not doing any difference.
format Bachelor Thesis
author de Groot, Laura
author_facet de Groot, Laura
author_sort de Groot, Laura
title Studie av omskjutningar i tunneldrivningsprojekt
title_short Studie av omskjutningar i tunneldrivningsprojekt
title_full Studie av omskjutningar i tunneldrivningsprojekt
title_fullStr Studie av omskjutningar i tunneldrivningsprojekt
title_full_unstemmed Studie av omskjutningar i tunneldrivningsprojekt
title_sort studie av omskjutningar i tunneldrivningsprojekt
publisher Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser
publishDate 2017
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66139
genre Northern Sweden
genre_facet Northern Sweden
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66139
op_rights info:eu-repo/semantics/openAccess
_version_ 1801380407415930880