Krökningsmätning av produktionsborrhål i MUJ
While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a vari...
Main Authors: | , |
---|---|
Format: | Bachelor Thesis |
Language: | Swedish |
Published: |
Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695 |
_version_ | 1821579330685239296 |
---|---|
author | Eklundh, Henrik Ferm, Simon |
author_facet | Eklundh, Henrik Ferm, Simon |
author_sort | Eklundh, Henrik |
collection | Luleå University of Technology Publications (DiVA) |
description | While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a variety of factors including drilling techniques such as weight on bit (WOB) or drill string diameter and rock properties such as density and crystal structure. It is important to study the deviation of the drill holes to ensure that the borehole is aligned correctly. When there is deviation within a boreholes major negative consequences can occur. This thesis describes the results from deviation measurements of drill holes from two different drifts within the ore body ”Alliansen” in the LKAB mine in Malmberget (MUJ). In the first drift, the production holes were drilled with a 115 mm drill bit, and in the second a drill bit of 105 mm. This is based on a project “Klenare borrhål” initiated by LKAB Wassara, a subsidiary of LKAB. LKAB Wassara wished to evaluate a possible reduction of drill hole diameter from the current 115 mm, to 105 mm. If the project had positive outcome, further attempts with an even smaller borehole diameter of 89 mm would be tested. There will also be curvature measurements as part of the evaluation of Wassaras new drill hammer, W90. The results of the measurements show that the average deviation of drill holes drilled with a larger diameter drill bit had much higher deviation than for the smaller diameter drill holes drilled with a smaller drill bit. |
format | Bachelor Thesis |
genre | Malmberget |
genre_facet | Malmberget |
id | ftluleatu:oai:DiVA.org:ltu-61695 |
institution | Open Polar |
language | Swedish |
op_collection_id | ftluleatu |
op_rights | info:eu-repo/semantics/openAccess |
publishDate | 2017 |
publisher | Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser |
record_format | openpolar |
spelling | ftluleatu:oai:DiVA.org:ltu-61695 2025-01-16T23:02:35+00:00 Krökningsmätning av produktionsborrhål i MUJ Eklundh, Henrik Ferm, Simon 2017 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695 swe swe Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser info:eu-repo/semantics/openAccess Engineering and Technology Teknik och teknologier Student thesis info:eu-repo/semantics/bachelorThesis text 2017 ftluleatu 2024-12-18T12:24:47Z While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a variety of factors including drilling techniques such as weight on bit (WOB) or drill string diameter and rock properties such as density and crystal structure. It is important to study the deviation of the drill holes to ensure that the borehole is aligned correctly. When there is deviation within a boreholes major negative consequences can occur. This thesis describes the results from deviation measurements of drill holes from two different drifts within the ore body ”Alliansen” in the LKAB mine in Malmberget (MUJ). In the first drift, the production holes were drilled with a 115 mm drill bit, and in the second a drill bit of 105 mm. This is based on a project “Klenare borrhål” initiated by LKAB Wassara, a subsidiary of LKAB. LKAB Wassara wished to evaluate a possible reduction of drill hole diameter from the current 115 mm, to 105 mm. If the project had positive outcome, further attempts with an even smaller borehole diameter of 89 mm would be tested. There will also be curvature measurements as part of the evaluation of Wassaras new drill hammer, W90. The results of the measurements show that the average deviation of drill holes drilled with a larger diameter drill bit had much higher deviation than for the smaller diameter drill holes drilled with a smaller drill bit. Bachelor Thesis Malmberget Luleå University of Technology Publications (DiVA) |
spellingShingle | Engineering and Technology Teknik och teknologier Eklundh, Henrik Ferm, Simon Krökningsmätning av produktionsborrhål i MUJ |
title | Krökningsmätning av produktionsborrhål i MUJ |
title_full | Krökningsmätning av produktionsborrhål i MUJ |
title_fullStr | Krökningsmätning av produktionsborrhål i MUJ |
title_full_unstemmed | Krökningsmätning av produktionsborrhål i MUJ |
title_short | Krökningsmätning av produktionsborrhål i MUJ |
title_sort | krökningsmätning av produktionsborrhål i muj |
topic | Engineering and Technology Teknik och teknologier |
topic_facet | Engineering and Technology Teknik och teknologier |
url | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695 |