Krökningsmätning av produktionsborrhål i MUJ

While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a vari...

Full description

Bibliographic Details
Main Authors: Eklundh, Henrik, Ferm, Simon
Format: Bachelor Thesis
Language:Swedish
Published: Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser 2017
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695
id ftluleatu:oai:DiVA.org:ltu-61695
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-61695 2023-05-15T17:10:09+02:00 Krökningsmätning av produktionsborrhål i MUJ Eklundh, Henrik Ferm, Simon 2017 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695 swe swe Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695 info:eu-repo/semantics/openAccess Engineering and Technology Teknik och teknologier Student thesis info:eu-repo/semantics/bachelorThesis text 2017 ftluleatu 2022-10-25T20:53:19Z While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a variety of factors including drilling techniques such as weight on bit (WOB) or drill string diameter and rock properties such as density and crystal structure. It is important to study the deviation of the drill holes to ensure that the borehole is aligned correctly. When there is deviation within a boreholes major negative consequences can occur. This thesis describes the results from deviation measurements of drill holes from two different drifts within the ore body ”Alliansen” in the LKAB mine in Malmberget (MUJ). In the first drift, the production holes were drilled with a 115 mm drill bit, and in the second a drill bit of 105 mm. This is based on a project “Klenare borrhål” initiated by LKAB Wassara, a subsidiary of LKAB. LKAB Wassara wished to evaluate a possible reduction of drill hole diameter from the current 115 mm, to 105 mm. If the project had positive outcome, further attempts with an even smaller borehole diameter of 89 mm would be tested. There will also be curvature measurements as part of the evaluation of Wassaras new drill hammer, W90. The results of the measurements show that the average deviation of drill holes drilled with a larger diameter drill bit had much higher deviation than for the smaller diameter drill holes drilled with a smaller drill bit. Bachelor Thesis Malmberget Luleå University of Technology Publications (DiVA)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language Swedish
topic Engineering and Technology
Teknik och teknologier
spellingShingle Engineering and Technology
Teknik och teknologier
Eklundh, Henrik
Ferm, Simon
Krökningsmätning av produktionsborrhål i MUJ
topic_facet Engineering and Technology
Teknik och teknologier
description While drilling holes it is extremely important that the drill holes are drilled as straight as possible. Even with the advances in drilling technology over the years it is still almost impossible. This is especially the case as the drilling depth increases. Drill hole deviation is affected by a variety of factors including drilling techniques such as weight on bit (WOB) or drill string diameter and rock properties such as density and crystal structure. It is important to study the deviation of the drill holes to ensure that the borehole is aligned correctly. When there is deviation within a boreholes major negative consequences can occur. This thesis describes the results from deviation measurements of drill holes from two different drifts within the ore body ”Alliansen” in the LKAB mine in Malmberget (MUJ). In the first drift, the production holes were drilled with a 115 mm drill bit, and in the second a drill bit of 105 mm. This is based on a project “Klenare borrhål” initiated by LKAB Wassara, a subsidiary of LKAB. LKAB Wassara wished to evaluate a possible reduction of drill hole diameter from the current 115 mm, to 105 mm. If the project had positive outcome, further attempts with an even smaller borehole diameter of 89 mm would be tested. There will also be curvature measurements as part of the evaluation of Wassaras new drill hammer, W90. The results of the measurements show that the average deviation of drill holes drilled with a larger diameter drill bit had much higher deviation than for the smaller diameter drill holes drilled with a smaller drill bit.
format Bachelor Thesis
author Eklundh, Henrik
Ferm, Simon
author_facet Eklundh, Henrik
Ferm, Simon
author_sort Eklundh, Henrik
title Krökningsmätning av produktionsborrhål i MUJ
title_short Krökningsmätning av produktionsborrhål i MUJ
title_full Krökningsmätning av produktionsborrhål i MUJ
title_fullStr Krökningsmätning av produktionsborrhål i MUJ
title_full_unstemmed Krökningsmätning av produktionsborrhål i MUJ
title_sort krökningsmätning av produktionsborrhål i muj
publisher Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser
publishDate 2017
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695
genre Malmberget
genre_facet Malmberget
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-61695
op_rights info:eu-repo/semantics/openAccess
_version_ 1766066592136822784