Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla

This report is the final thesis project for a Master of Science in Industrial Design Engineering at Luleå University of Technology, conducted during a 20 week period between September 2015 and January 2016. The purpose of this master thesis was to evaluate and analyse a PCB conformal coating process...

Full description

Bibliographic Details
Main Author: Livingstone, Agnes
Format: Bachelor Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55728
id ftluleatu:oai:DiVA.org:ltu-55728
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-55728 2023-05-15T17:09:17+02:00 Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla Livingstone, Agnes 2016 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55728 eng eng http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55728 Local c8f645ca-ae9b-4a80-a909-d7105edc1ff1 info:eu-repo/semantics/openAccess Technology Teknik Ledtid Hög variation/låg volym Kretskortslackering Student thesis info:eu-repo/semantics/bachelorThesis text 2016 ftluleatu 2022-10-25T20:52:58Z This report is the final thesis project for a Master of Science in Industrial Design Engineering at Luleå University of Technology, conducted during a 20 week period between September 2015 and January 2016. The purpose of this master thesis was to evaluate and analyse a PCB conformal coating process at Saab EDS in Järfälla, Sweden. The analysis was done with the in order to find ways to reduce lead time and increase efficiency in a sustainable manner within this process.At Saab EDS in Järfälla electronic circuit boards are assembled for use in electronic warfare - and counter measure systems. Since these PCB assemblies are used in very demanding and harsh environments (i.e. on military airplanes) they must be conformal coated. Conformal coating is a process whereby a protective film is applied to the PCB assembly. This process is tedious with a lot of manual application and correction, despite the fully automated coating equipment. There is also a predicted increase in both volume and product complexity making the current process insufficient to meet those demands. Reducing lead time in the process is however not straight forward since the production displays characteristics of high-mix/low-volume production.The project was conducted using a traditional development process where there was first a thorough review of available literature on the subject of lead time reduction in high-mic/low-volume environments and on the subject of efficiency in conformal coating. The current state was then mapped and analysed using a mix of different well-known methods such as value stream mapping and hierarchical task analysis. The current state analysis resulted in a number of process requirements meant to alleviate the most critical issues. Solutions to these issues where developed using a high level of participation from the operators and company stakeholders to identify viable and reliable solutions.The final results pointed to three different areas as having the largest potential to reduce lead time and increase efficiency ... Bachelor Thesis Luleå Luleå Luleå Luleå University of Technology Publications (DiVA)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Technology
Teknik
Ledtid
Hög variation/låg volym
Kretskortslackering
spellingShingle Technology
Teknik
Ledtid
Hög variation/låg volym
Kretskortslackering
Livingstone, Agnes
Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
topic_facet Technology
Teknik
Ledtid
Hög variation/låg volym
Kretskortslackering
description This report is the final thesis project for a Master of Science in Industrial Design Engineering at Luleå University of Technology, conducted during a 20 week period between September 2015 and January 2016. The purpose of this master thesis was to evaluate and analyse a PCB conformal coating process at Saab EDS in Järfälla, Sweden. The analysis was done with the in order to find ways to reduce lead time and increase efficiency in a sustainable manner within this process.At Saab EDS in Järfälla electronic circuit boards are assembled for use in electronic warfare - and counter measure systems. Since these PCB assemblies are used in very demanding and harsh environments (i.e. on military airplanes) they must be conformal coated. Conformal coating is a process whereby a protective film is applied to the PCB assembly. This process is tedious with a lot of manual application and correction, despite the fully automated coating equipment. There is also a predicted increase in both volume and product complexity making the current process insufficient to meet those demands. Reducing lead time in the process is however not straight forward since the production displays characteristics of high-mix/low-volume production.The project was conducted using a traditional development process where there was first a thorough review of available literature on the subject of lead time reduction in high-mic/low-volume environments and on the subject of efficiency in conformal coating. The current state was then mapped and analysed using a mix of different well-known methods such as value stream mapping and hierarchical task analysis. The current state analysis resulted in a number of process requirements meant to alleviate the most critical issues. Solutions to these issues where developed using a high level of participation from the operators and company stakeholders to identify viable and reliable solutions.The final results pointed to three different areas as having the largest potential to reduce lead time and increase efficiency ...
format Bachelor Thesis
author Livingstone, Agnes
author_facet Livingstone, Agnes
author_sort Livingstone, Agnes
title Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
title_short Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
title_full Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
title_fullStr Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
title_full_unstemmed Reducing Lead time in High-Mix Low-Volume Conformal Coating : A Study at PBA Production, SAAB Järfälla
title_sort reducing lead time in high-mix low-volume conformal coating : a study at pba production, saab järfälla
publishDate 2016
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55728
genre Luleå
Luleå
Luleå
genre_facet Luleå
Luleå
Luleå
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-55728
Local c8f645ca-ae9b-4a80-a909-d7105edc1ff1
op_rights info:eu-repo/semantics/openAccess
_version_ 1766065322017685504