Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry

This report is a master thesis conducted during the spring semester of 2016 as a final part of the Masterof Science in Industrial Design Engineering at Luleå University of Technology. The aim of thisthesis was to map and analyze the production flow of Permobil in Timrå, Sweden. This was done inorder...

Full description

Bibliographic Details
Main Authors: Gustafsson, Malin, Vedin, Elin
Format: Bachelor Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-49767
id ftluleatu:oai:DiVA.org:ltu-49767
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-49767 2023-05-15T17:09:16+02:00 Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry Gustafsson, Malin Vedin, Elin 2016 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-49767 eng eng http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-49767 Local 714c6d2c-6530-40dc-aac7-e23d71ec9992 info:eu-repo/semantics/openAccess Technology Teknik Genomloppstid Lean Production hög variation och låg volym värdeflödesanalys Student thesis info:eu-repo/semantics/bachelorThesis text 2016 ftluleatu 2022-10-25T20:49:47Z This report is a master thesis conducted during the spring semester of 2016 as a final part of the Masterof Science in Industrial Design Engineering at Luleå University of Technology. The aim of thisthesis was to map and analyze the production flow of Permobil in Timrå, Sweden. This was done inorder to deliver concrete solution proposals in the end of the project, which lay within the Lean philosophyand are adapted to Permobil’s production categorized as high-mix and low-volume products.The overall objective has been to optimize Permobil’s production flow in order to reduce the throughputtime for their products.Permobil is a world leading manufacturer of electrical wheelchairs. Their vision is to stand up for theircostumers’ rights and provide the best possible solutions. For Permobil Timrå to be able to follow thedemand and increase its annual production from the current annual 4,600 chairs to an annual of 7,700chairs in 2018, the production must be more effective. Since the production in Timrå is characterizedby a high-mix and low-volume, problems can occur when reducing throughput time since provenmethods are not always suitable for this type of production.Implementation of the thesis has followed a cyclical approach through the project circle. To create abasic understanding of the work, a theoretical framework was conducted containing subjects as LeanProduction, challenges of implementing Lean, high-mix and low-volume, work in progress and pushand pull system. Mapping and analyzing the current situation was carried out through observations,unstructured interviews, a Deviation Analysis and Value stream mapping. The analysis resulted in arequirement specification that pointed on the requirements of future solutions would come to meet.The main requirements were estimated to good physical and psychological work environment, meetthe customer´s need and increased product flow. Workshops and brainstorming has been used to developand evaluate solution proposals.The mapping and the analysis of the current state show ... Bachelor Thesis Luleå Luleå Luleå Luleå University of Technology Publications (DiVA)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Technology
Teknik
Genomloppstid
Lean Production
hög variation och låg volym
värdeflödesanalys
spellingShingle Technology
Teknik
Genomloppstid
Lean Production
hög variation och låg volym
värdeflödesanalys
Gustafsson, Malin
Vedin, Elin
Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
topic_facet Technology
Teknik
Genomloppstid
Lean Production
hög variation och låg volym
värdeflödesanalys
description This report is a master thesis conducted during the spring semester of 2016 as a final part of the Masterof Science in Industrial Design Engineering at Luleå University of Technology. The aim of thisthesis was to map and analyze the production flow of Permobil in Timrå, Sweden. This was done inorder to deliver concrete solution proposals in the end of the project, which lay within the Lean philosophyand are adapted to Permobil’s production categorized as high-mix and low-volume products.The overall objective has been to optimize Permobil’s production flow in order to reduce the throughputtime for their products.Permobil is a world leading manufacturer of electrical wheelchairs. Their vision is to stand up for theircostumers’ rights and provide the best possible solutions. For Permobil Timrå to be able to follow thedemand and increase its annual production from the current annual 4,600 chairs to an annual of 7,700chairs in 2018, the production must be more effective. Since the production in Timrå is characterizedby a high-mix and low-volume, problems can occur when reducing throughput time since provenmethods are not always suitable for this type of production.Implementation of the thesis has followed a cyclical approach through the project circle. To create abasic understanding of the work, a theoretical framework was conducted containing subjects as LeanProduction, challenges of implementing Lean, high-mix and low-volume, work in progress and pushand pull system. Mapping and analyzing the current situation was carried out through observations,unstructured interviews, a Deviation Analysis and Value stream mapping. The analysis resulted in arequirement specification that pointed on the requirements of future solutions would come to meet.The main requirements were estimated to good physical and psychological work environment, meetthe customer´s need and increased product flow. Workshops and brainstorming has been used to developand evaluate solution proposals.The mapping and the analysis of the current state show ...
format Bachelor Thesis
author Gustafsson, Malin
Vedin, Elin
author_facet Gustafsson, Malin
Vedin, Elin
author_sort Gustafsson, Malin
title Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
title_short Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
title_full Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
title_fullStr Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
title_full_unstemmed Throughput Time Optimization in a Production Flow : A Case Study in the Power Wheelchairs Industry
title_sort throughput time optimization in a production flow : a case study in the power wheelchairs industry
publishDate 2016
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-49767
genre Luleå
Luleå
Luleå
genre_facet Luleå
Luleå
Luleå
op_relation http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-49767
Local 714c6d2c-6530-40dc-aac7-e23d71ec9992
op_rights info:eu-repo/semantics/openAccess
_version_ 1766065287882342400