Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika

The growing competition between companies have led to their supply chains becoming a means for obtaining competitive advantages. The supply chains have become more complex because of an increased focus on lower costs, a shorter life cycle on products and an increased demand. This increased complexit...

Full description

Bibliographic Details
Main Authors: Krönander, John, Åsling, Mattias
Format: Bachelor Thesis
Language:Swedish
Published: 2014
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-42814
_version_ 1821685405757472768
author Krönander, John
Åsling, Mattias
author_facet Krönander, John
Åsling, Mattias
author_sort Krönander, John
collection Luleå University of Technology Publications (DiVA)
description The growing competition between companies have led to their supply chains becoming a means for obtaining competitive advantages. The supply chains have become more complex because of an increased focus on lower costs, a shorter life cycle on products and an increased demand. This increased complexity have created a need to identify problems in the supply chain. Furthermore, as the competition have increased, the lead time have become an important parameter for companies. In a Make-to-Order (MTO) company a short lead time can be the deciding factor if they are to be the order winner. The lead time from the supplier is major contributing factor to the total lead time and inventory are often used to reduce its impact. Inventory can however be disadvantageous as it ties up capital and is a source of waste.ABB Components in Ludvika is a MTO company and a part of Power Products which is a division in ABB Ltd and are the world’s largest manufacturer of bushings. ABB Composites in Piteå are also a part of the division Power Products and produce insulators which is a component of the bushings. The procurement of insulators for one of Components products is based on a forecast due to long lead times from Composites and Components maintains a large inventory of insulators. Components has an ambition to make the supply of material more efficient to obtain shorter lead times and reduced inventory. This study was of a dual nature in which the first part had the purpose of identifying actions that can improve the efficiency of a supply chain in an MTO company. This was done through a process mapping of Components supply chain where factors affecting lead time and inventory were identified. From the process mapping an action with the potential to shorten the lead time and inventory levels were identified that formed the basis for the second phase of the study.This study shows that uncertainty in forecasts have a large effect on both the lead time through the amplification of the lead time gap and higher inventory levels. In ...
format Bachelor Thesis
genre Piteå
genre_facet Piteå
id ftluleatu:oai:DiVA.org:ltu-42814
institution Open Polar
language Swedish
op_collection_id ftluleatu
op_rights info:eu-repo/semantics/openAccess
publishDate 2014
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-42814 2025-01-17T00:20:11+00:00 Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika Krönander, John Åsling, Mattias 2014 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-42814 swe swe info:eu-repo/semantics/openAccess Social Behaviour Law Samhälls- beteendevetenskap juridik Logistik Dragande flöde Conwip Processkartläggning Kanban Student thesis info:eu-repo/semantics/bachelorThesis text 2014 ftluleatu 2024-12-18T12:24:47Z The growing competition between companies have led to their supply chains becoming a means for obtaining competitive advantages. The supply chains have become more complex because of an increased focus on lower costs, a shorter life cycle on products and an increased demand. This increased complexity have created a need to identify problems in the supply chain. Furthermore, as the competition have increased, the lead time have become an important parameter for companies. In a Make-to-Order (MTO) company a short lead time can be the deciding factor if they are to be the order winner. The lead time from the supplier is major contributing factor to the total lead time and inventory are often used to reduce its impact. Inventory can however be disadvantageous as it ties up capital and is a source of waste.ABB Components in Ludvika is a MTO company and a part of Power Products which is a division in ABB Ltd and are the world’s largest manufacturer of bushings. ABB Composites in Piteå are also a part of the division Power Products and produce insulators which is a component of the bushings. The procurement of insulators for one of Components products is based on a forecast due to long lead times from Composites and Components maintains a large inventory of insulators. Components has an ambition to make the supply of material more efficient to obtain shorter lead times and reduced inventory. This study was of a dual nature in which the first part had the purpose of identifying actions that can improve the efficiency of a supply chain in an MTO company. This was done through a process mapping of Components supply chain where factors affecting lead time and inventory were identified. From the process mapping an action with the potential to shorten the lead time and inventory levels were identified that formed the basis for the second phase of the study.This study shows that uncertainty in forecasts have a large effect on both the lead time through the amplification of the lead time gap and higher inventory levels. In ... Bachelor Thesis Piteå Luleå University of Technology Publications (DiVA)
spellingShingle Social Behaviour Law
Samhälls-
beteendevetenskap
juridik
Logistik
Dragande flöde
Conwip
Processkartläggning
Kanban
Krönander, John
Åsling, Mattias
Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title_full Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title_fullStr Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title_full_unstemmed Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title_short Effektiv materialförsörjning i en försörjningskedja hos ett MTO-företag : En fallstudie på ABB Components i Ludvika
title_sort effektiv materialförsörjning i en försörjningskedja hos ett mto-företag : en fallstudie på abb components i ludvika
topic Social Behaviour Law
Samhälls-
beteendevetenskap
juridik
Logistik
Dragande flöde
Conwip
Processkartläggning
Kanban
topic_facet Social Behaviour Law
Samhälls-
beteendevetenskap
juridik
Logistik
Dragande flöde
Conwip
Processkartläggning
Kanban
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-42814