Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden

A two-span railway concrete trough bridge over Luossajokk in Kiruna in northern Sweden has been studied. The owner wanted to increase the axle loads from 250 to 300 kN in order to reduce freight costs for iron ore. Examples are given of methods used and results obtained from the assessment where ben...

Full description

Bibliographic Details
Main Authors: Enochsson, Ola, Elfgren, Lennart, Olofsson, Thomas, Täljsten, Björn, Töyrä, Björn, Kronborg, Anders, Paulsson, Björn
Format: Conference Object
Language:English
Published: Luleå tekniska universitet, Byggkonstruktion och -produktion 2006
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-40467
id ftluleatu:oai:DiVA.org:ltu-40467
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-40467 2023-05-15T17:04:09+02:00 Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden Enochsson, Ola Elfgren, Lennart Olofsson, Thomas Täljsten, Björn Töyrä, Björn Kronborg, Anders Paulsson, Björn 2006 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-40467 eng eng Luleå tekniska universitet, Byggkonstruktion och -produktion Banverket, Luleå London : Taylor and Francis Group Bridge maintenance, safety, management, life-cycle performance and cost : Proceedings of the third International Conference on Bridge Maintenance, Safety and Management. IABMAS'06 http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-40467 urn:isbn:0-415-40315-4 Local f9e599f0-7183-11db-962b-000ea68e967b info:eu-repo/semantics/openAccess Infrastructure Engineering Infrastrukturteknik Construction Management Byggproduktion Conference paper info:eu-repo/semantics/conferenceObject text 2006 ftluleatu 2022-10-25T20:56:27Z A two-span railway concrete trough bridge over Luossajokk in Kiruna in northern Sweden has been studied. The owner wanted to increase the axle loads from 250 to 300 kN in order to reduce freight costs for iron ore. Examples are given of methods used and results obtained from the assessment where bending, shear and fatigue were studied. Material properties, loads and load carrying capacity were evaluated using deterministic and probabilistic methods. It was shown that the bridge could carry the higher loads with a safety index β > 4.7 for reasonable assumptions of the load distributions. A measurement system was installed to check the actual level of critical strains and the worst positions of the train. Results are also given from a condition monitoring program 2001-2006, launched to periodically check the development of strains with time. Godkänd; 2006; Bibliografisk uppgift: Abstract pp 887-888. Full paper P-332, 8 p, on attached CD; 20061111 (ysko) Conference Object Kiruna Northern Sweden Luleå University of Technology Publications (DiVA) Kiruna Luossajokk ENVELOPE(19.250,19.250,67.150,67.150)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Infrastructure Engineering
Infrastrukturteknik
Construction Management
Byggproduktion
spellingShingle Infrastructure Engineering
Infrastrukturteknik
Construction Management
Byggproduktion
Enochsson, Ola
Elfgren, Lennart
Olofsson, Thomas
Täljsten, Björn
Töyrä, Björn
Kronborg, Anders
Paulsson, Björn
Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
topic_facet Infrastructure Engineering
Infrastrukturteknik
Construction Management
Byggproduktion
description A two-span railway concrete trough bridge over Luossajokk in Kiruna in northern Sweden has been studied. The owner wanted to increase the axle loads from 250 to 300 kN in order to reduce freight costs for iron ore. Examples are given of methods used and results obtained from the assessment where bending, shear and fatigue were studied. Material properties, loads and load carrying capacity were evaluated using deterministic and probabilistic methods. It was shown that the bridge could carry the higher loads with a safety index β > 4.7 for reasonable assumptions of the load distributions. A measurement system was installed to check the actual level of critical strains and the worst positions of the train. Results are also given from a condition monitoring program 2001-2006, launched to periodically check the development of strains with time. Godkänd; 2006; Bibliografisk uppgift: Abstract pp 887-888. Full paper P-332, 8 p, on attached CD; 20061111 (ysko)
format Conference Object
author Enochsson, Ola
Elfgren, Lennart
Olofsson, Thomas
Täljsten, Björn
Töyrä, Björn
Kronborg, Anders
Paulsson, Björn
author_facet Enochsson, Ola
Elfgren, Lennart
Olofsson, Thomas
Täljsten, Björn
Töyrä, Björn
Kronborg, Anders
Paulsson, Björn
author_sort Enochsson, Ola
title Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
title_short Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
title_full Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
title_fullStr Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
title_full_unstemmed Assessment and condition monitoring of a concrete railway bridge in Kiruna, Sweden
title_sort assessment and condition monitoring of a concrete railway bridge in kiruna, sweden
publisher Luleå tekniska universitet, Byggkonstruktion och -produktion
publishDate 2006
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-40467
long_lat ENVELOPE(19.250,19.250,67.150,67.150)
geographic Kiruna
Luossajokk
geographic_facet Kiruna
Luossajokk
genre Kiruna
Northern Sweden
genre_facet Kiruna
Northern Sweden
op_relation Bridge maintenance, safety, management, life-cycle performance and cost : Proceedings of the third International Conference on Bridge Maintenance, Safety and Management. IABMAS'06
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-40467
urn:isbn:0-415-40315-4
Local f9e599f0-7183-11db-962b-000ea68e967b
op_rights info:eu-repo/semantics/openAccess
_version_ 1766058190564229120