Uncertainties for pressure-time efficiency measurements

In connection with the pressure-time project at the Norwegian University of Science and Technology and Luleå University of Technology, a number of tests with the pressure-time method have been performed at the Waterpower Laboratory in Trondheim, Norway. The aim is to lower the uncertainty and improv...

Full description

Bibliographic Details
Main Authors: Ramdal, Jørgen, Jonsson, Pontus, Dahlhaug, Ole Gunnar, Nielsen, Torbjørn, Cervantes, Michel
Format: Conference Object
Language:English
Published: Luleå tekniska universitet, Strömningslära och experimentell mekanik 2010
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-27801
id ftluleatu:oai:DiVA.org:ltu-27801
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-27801 2023-05-15T17:09:11+02:00 Uncertainties for pressure-time efficiency measurements Ramdal, Jørgen Jonsson, Pontus Dahlhaug, Ole Gunnar Nielsen, Torbjørn Cervantes, Michel 2010 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-27801 eng eng Luleå tekniska universitet, Strömningslära och experimentell mekanik Norwegian University of Science and Technology (NTNU), Trondheim The 8th International Conference on Hydraulic Efficiency Measurement http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-27801 Local 159df440-f221-11df-8b36-000ea68e967b info:eu-repo/semantics/openAccess Fluid Mechanics and Acoustics Strömningsmekanik och akustik Conference paper info:eu-repo/semantics/conferenceObject text 2010 ftluleatu 2022-10-25T20:51:26Z In connection with the pressure-time project at the Norwegian University of Science and Technology and Luleå University of Technology, a number of tests with the pressure-time method have been performed at the Waterpower Laboratory in Trondheim, Norway. The aim is to lower the uncertainty and improve usability of the method. Also a field test at the Anundsjoe power plant in Sweden has been performed. The pressure-time measurement is affected by random uncertainty. To minimize the effect of the random behavior it is found that a correct integration end limit in the integration of the differential pressure is essential. An analysis using 100 different end points for integration show a possible random error as large as 0.6%. A filtration method for finding an appropriate end point is developed and presented. In laboratory, the random behavior of the method can be described since many tests can be performed. During field measurements, this may not be feasible. However, the random uncertainty can be included if the efficiency curve can be described by polynomial regression curves. This method is presented with the Anundsjoe Power Plant measurements. Godkänd; 2010; 20101117 (ponjon) Conference Object Luleå Luleå Luleå Luleå University of Technology Publications (DiVA) Norway
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language English
topic Fluid Mechanics and Acoustics
Strömningsmekanik och akustik
spellingShingle Fluid Mechanics and Acoustics
Strömningsmekanik och akustik
Ramdal, Jørgen
Jonsson, Pontus
Dahlhaug, Ole Gunnar
Nielsen, Torbjørn
Cervantes, Michel
Uncertainties for pressure-time efficiency measurements
topic_facet Fluid Mechanics and Acoustics
Strömningsmekanik och akustik
description In connection with the pressure-time project at the Norwegian University of Science and Technology and Luleå University of Technology, a number of tests with the pressure-time method have been performed at the Waterpower Laboratory in Trondheim, Norway. The aim is to lower the uncertainty and improve usability of the method. Also a field test at the Anundsjoe power plant in Sweden has been performed. The pressure-time measurement is affected by random uncertainty. To minimize the effect of the random behavior it is found that a correct integration end limit in the integration of the differential pressure is essential. An analysis using 100 different end points for integration show a possible random error as large as 0.6%. A filtration method for finding an appropriate end point is developed and presented. In laboratory, the random behavior of the method can be described since many tests can be performed. During field measurements, this may not be feasible. However, the random uncertainty can be included if the efficiency curve can be described by polynomial regression curves. This method is presented with the Anundsjoe Power Plant measurements. Godkänd; 2010; 20101117 (ponjon)
format Conference Object
author Ramdal, Jørgen
Jonsson, Pontus
Dahlhaug, Ole Gunnar
Nielsen, Torbjørn
Cervantes, Michel
author_facet Ramdal, Jørgen
Jonsson, Pontus
Dahlhaug, Ole Gunnar
Nielsen, Torbjørn
Cervantes, Michel
author_sort Ramdal, Jørgen
title Uncertainties for pressure-time efficiency measurements
title_short Uncertainties for pressure-time efficiency measurements
title_full Uncertainties for pressure-time efficiency measurements
title_fullStr Uncertainties for pressure-time efficiency measurements
title_full_unstemmed Uncertainties for pressure-time efficiency measurements
title_sort uncertainties for pressure-time efficiency measurements
publisher Luleå tekniska universitet, Strömningslära och experimentell mekanik
publishDate 2010
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-27801
geographic Norway
geographic_facet Norway
genre Luleå
Luleå
Luleå
genre_facet Luleå
Luleå
Luleå
op_relation The 8th International Conference on Hydraulic Efficiency Measurement
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-27801
Local 159df440-f221-11df-8b36-000ea68e967b
op_rights info:eu-repo/semantics/openAccess
_version_ 1766065154011693056