Styrning av tågtrafik på Malmbanan

The single-track Swedish iron ore line Malmbanan stretches from Luleå to the Norwegian city of Narvik. The mine company LKAB transport iron ore on Malmbanan from the mines in Kiruna and Malmberget to the harbours in Narvik and Luleå for export. The daily traffic also consists of passenger trains and...

Full description

Bibliographic Details
Main Author: Nilsson, Kristina
Format: Master Thesis
Language:Swedish
Published: Luleå 2007
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-16862
id ftluleatu:oai:DiVA.org:ltu-16862
record_format openpolar
spelling ftluleatu:oai:DiVA.org:ltu-16862 2023-05-15T17:04:12+02:00 Styrning av tågtrafik på Malmbanan Nilsson, Kristina 2007 application/pdf http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-16862 swe swe Luleå Licentiate thesis / Luleå University of Technology, 1402-1757 2007:73 http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-16862 Local 0524ecb0-a7fe-11dc-9534-000ea68e967b info:eu-repo/semantics/openAccess Production Engineering Human Work Science and Ergonomics Produktionsteknik arbetsvetenskap och ergonomi Licentiate thesis, comprehensive summary info:eu-repo/semantics/masterThesis text 2007 ftluleatu 2022-10-25T20:50:45Z The single-track Swedish iron ore line Malmbanan stretches from Luleå to the Norwegian city of Narvik. The mine company LKAB transport iron ore on Malmbanan from the mines in Kiruna and Malmberget to the harbours in Narvik and Luleå for export. The daily traffic also consists of passenger trains and freight trains. Malmbanan has a lack of capacity witch increase the sensitivity of system disturbances.To increase the railroad transport volume LKAB has started to run longer (750 m) and heavier trains. That requires more capacity and meeting stations long enough to take 750 metres trains, today only a third of the stations are that long. To improve the capacity situation one possibility is to develop the train dispatching system. The aim of this licentiate thesis is through case studies of train traffic planning and control illustrate how the capacity on Malmbanan can be improved to make the iron ore flow more efficient.To avoid having to control the production after the timetable the train traffic has to be more flexible than it is today. Increased flexibility could for example represent getting train paths in short-term. The analyses of the Brazilian iron ore company CVRD's transport process shows that it is possible to improve the train traffic flow through advanced technology. Investments in new technology that optimize both train driving and control have shown positive effects at CVRD.However, it is uncertain how much the iron ore train traffic system can change despite improved technology. The train traffic load on the line is too high, there are not enough meeting stations and an traffic increase could lead to even higher disturbances. Malmbanan kallas den runt 50 mil långa enkelspåriga järnvägssträcka som går från Narvik i norr till Luleå i söder. På Malmbanan transporterar gruvbolaget LKAB sin järnmalm från gruvorna i Kiruna och Malmberget till hamnarna i Narvik och Luleå för export. På banan går även dagligen persontåg samt annan godstrafik. Banan har ett högt kapacitetsutnyttjandet vilket ökar ... Master Thesis Kiruna Luleå Luleå Luleå Malmberget Narvik Narvik Luleå University of Technology Publications (DiVA) Kiruna Narvik ENVELOPE(17.427,17.427,68.438,68.438)
institution Open Polar
collection Luleå University of Technology Publications (DiVA)
op_collection_id ftluleatu
language Swedish
topic Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
spellingShingle Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
Nilsson, Kristina
Styrning av tågtrafik på Malmbanan
topic_facet Production Engineering
Human Work Science and Ergonomics
Produktionsteknik
arbetsvetenskap och ergonomi
description The single-track Swedish iron ore line Malmbanan stretches from Luleå to the Norwegian city of Narvik. The mine company LKAB transport iron ore on Malmbanan from the mines in Kiruna and Malmberget to the harbours in Narvik and Luleå for export. The daily traffic also consists of passenger trains and freight trains. Malmbanan has a lack of capacity witch increase the sensitivity of system disturbances.To increase the railroad transport volume LKAB has started to run longer (750 m) and heavier trains. That requires more capacity and meeting stations long enough to take 750 metres trains, today only a third of the stations are that long. To improve the capacity situation one possibility is to develop the train dispatching system. The aim of this licentiate thesis is through case studies of train traffic planning and control illustrate how the capacity on Malmbanan can be improved to make the iron ore flow more efficient.To avoid having to control the production after the timetable the train traffic has to be more flexible than it is today. Increased flexibility could for example represent getting train paths in short-term. The analyses of the Brazilian iron ore company CVRD's transport process shows that it is possible to improve the train traffic flow through advanced technology. Investments in new technology that optimize both train driving and control have shown positive effects at CVRD.However, it is uncertain how much the iron ore train traffic system can change despite improved technology. The train traffic load on the line is too high, there are not enough meeting stations and an traffic increase could lead to even higher disturbances. Malmbanan kallas den runt 50 mil långa enkelspåriga järnvägssträcka som går från Narvik i norr till Luleå i söder. På Malmbanan transporterar gruvbolaget LKAB sin järnmalm från gruvorna i Kiruna och Malmberget till hamnarna i Narvik och Luleå för export. På banan går även dagligen persontåg samt annan godstrafik. Banan har ett högt kapacitetsutnyttjandet vilket ökar ...
format Master Thesis
author Nilsson, Kristina
author_facet Nilsson, Kristina
author_sort Nilsson, Kristina
title Styrning av tågtrafik på Malmbanan
title_short Styrning av tågtrafik på Malmbanan
title_full Styrning av tågtrafik på Malmbanan
title_fullStr Styrning av tågtrafik på Malmbanan
title_full_unstemmed Styrning av tågtrafik på Malmbanan
title_sort styrning av tågtrafik på malmbanan
publisher Luleå
publishDate 2007
url http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-16862
long_lat ENVELOPE(17.427,17.427,68.438,68.438)
geographic Kiruna
Narvik
geographic_facet Kiruna
Narvik
genre Kiruna
Luleå
Luleå
Luleå
Malmberget
Narvik
Narvik
genre_facet Kiruna
Luleå
Luleå
Luleå
Malmberget
Narvik
Narvik
op_relation Licentiate thesis / Luleå University of Technology, 1402-1757
2007:73
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-16862
Local 0524ecb0-a7fe-11dc-9534-000ea68e967b
op_rights info:eu-repo/semantics/openAccess
_version_ 1766058253966376960