Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden

A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box-girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed using the b...

Full description

Bibliographic Details
Published in:ce/papers
Main Authors: Daescu, Cosmin Al, Gonzalez-Libreros, Jaime, Wang, Chao, Elfgren, Lennart, Sas, Gabriel
Format: Conference Object
Language:English
Published: Luleå tekniska universitet, Byggkonstruktion och brand 2023
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-103664
https://doi.org/10.1002/cepa.2745