Demolition of a 65-year-old box-girder prestressed concrete bridge located in Northern Sweden
A new bridge was built in Kalix, northern Sweden, to replace an existing prestressed concrete box-girder bridge that had been in service for over 60 years. The old bridge had a total length of 283.6 m divided into five spans: 43.9 m, 47.0 m, 94.0 m, 47.0 m, and 43.9 m. It was constructed using the b...
Published in: | ce/papers |
---|---|
Main Authors: | , , , , |
Format: | Conference Object |
Language: | English |
Published: |
Luleå tekniska universitet, Byggkonstruktion och brand
2023
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-103664 https://doi.org/10.1002/cepa.2745 |