Numerical simulation of parameters of the thermal scheme of the waste heat recovery system

Hybrid power plants were first proposed in the development of geothermal deposits in Kamchatka in 1964-66. The unit consists of two circuits, which use a steam turbine with a temperature of up to 200 ° C, with a degree of dryness of water vapor is 5% and a turbine on R12 refrigerant with a capacity...

Full description

Bibliographic Details
Published in:Ventilation, Illumination and Heat Gas Supply
Main Authors: Бурда, Ю. О. Бурда, Півненко, Ю.О., Редько, І.О., Череднік, А. Д., Приймак, О. В.
Format: Article in Journal/Newspaper
Language:Ukrainian
Published: Kyiv National University of Construction and Architecture 2022
Subjects:
Online Access:http://vothp.knuba.edu.ua/article/view/254951
https://doi.org/10.32347/2409-2606.2022.40.43-49
id ftjvothp:oai:ojs.journals.uran.ua:article/254951
record_format openpolar
institution Open Polar
collection Ventilation, Illumination and Heat-Gas Supply (E-Journal)
op_collection_id ftjvothp
language Ukrainian
topic numerical simulation
source heat recovery systems
hybrid power plant
waste heat recovery system
чисельне моделювання
системи утилізації відхідного тепла
геотермальна електростанція
гібридні енергетичні установки
spellingShingle numerical simulation
source heat recovery systems
hybrid power plant
waste heat recovery system
чисельне моделювання
системи утилізації відхідного тепла
геотермальна електростанція
гібридні енергетичні установки
Бурда, Ю. О. Бурда
Півненко, Ю.О.
Редько, І.О.
Череднік, А. Д.
Приймак, О. В.
Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
topic_facet numerical simulation
source heat recovery systems
hybrid power plant
waste heat recovery system
чисельне моделювання
системи утилізації відхідного тепла
геотермальна електростанція
гібридні енергетичні установки
description Hybrid power plants were first proposed in the development of geothermal deposits in Kamchatka in 1964-66. The unit consists of two circuits, which use a steam turbine with a temperature of up to 200 ° C, with a degree of dryness of water vapor is 5% and a turbine on R12 refrigerant with a capacity of 5 MW. Electric power is 12 MW. Hybrid power plants are also used in metallurgy, cement and glass industries where the heat of exhaust gases with temperatures up to 350 ° C is used. A feature of the design calculations is the uncertainty of changes during the future life of some of the initial data, in particular, specific cost indicators. The available experience and the analysis of approaches to development of flowing parts of turbines have shown that depending on degree of expansion and expenses of working bodies the corresponding type of flowing part is chosen. The calculated studies of the three-circuit thermal circuit (at a discharge temperature of 350 ° C) showed that increasing the parameters of the working fluids is not always rational. Increasing the heat drop on the turbine leads to an increase in the number of turbine stages, but the cost of the working fluid is not enough to abandon the partial drive. The one-dimensional calculation does not show a complete picture of the flow in the flowing part of the turbine, which will have large losses from secondary flows and flows of the working fluid due to the low height of the blades and a high degree of partiality. The results also allow us to conclude that the most appropriate is the implementation of a double-circuit thermal scheme and increase the consumption of working fluids. Increasing the number of circuit elements and possible combinations of their connections, expanding the range of changes in the initial data, factors of systemicity and uncertainty significantly complicate the choice of the final version of the thermal circuit. Гібридні енергетичні установки вперше запропоновано при розробленні геотермальних родовищ Камчатки в 1964-66 роках. Установка складається з двох контурів, у яких використовується турбіна на водяній парі з температурою до 200°С і ступенем сухості 5% і турбіна на хладоні R12 потужністю 5МВт. Електрична потужність становить 12МВт. Гібридні енергетичні установки також використовуються в металургії, цементній і скляній галузях промисловості, де використовується теплота відхідних газів з температурою до 350°С. Особливістю проєктних розрахунків є невизначеність зміни протягом майбутнього терміну експлуатації частини початкових даних, зокрема питомих вартісних показників. Збільшення кількості елементів схем та можливих комбінацій їх з’єднань між собою, розширення діапазонів змін початкових даних, фактори системності та невизначеності значно ускладнюють вибір остаточного варіанта теплової схеми. Розрахункові дослідження показали доцільність використання двоконтурної схеми зі збільшеною витратою органічного робочого тіла порівняно з триконтурною. Це незначно зменшує потужність, однак суттєво спрощує і здешевлює систему.
format Article in Journal/Newspaper
author Бурда, Ю. О. Бурда
Півненко, Ю.О.
Редько, І.О.
Череднік, А. Д.
Приймак, О. В.
author_facet Бурда, Ю. О. Бурда
Півненко, Ю.О.
Редько, І.О.
Череднік, А. Д.
Приймак, О. В.
author_sort Бурда, Ю. О. Бурда
title Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
title_short Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
title_full Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
title_fullStr Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
title_full_unstemmed Numerical simulation of parameters of the thermal scheme of the waste heat recovery system
title_sort numerical simulation of parameters of the thermal scheme of the waste heat recovery system
publisher Kyiv National University of Construction and Architecture
publishDate 2022
url http://vothp.knuba.edu.ua/article/view/254951
https://doi.org/10.32347/2409-2606.2022.40.43-49
genre Kamchatka
КАМЧАТК*
genre_facet Kamchatka
КАМЧАТК*
op_source Ventilation, Illumination and Heat Gas Supply; Vol. 40 (2022): Ventilation, Illumination and Heat-Gas Supply; 43-49
Вентиляція, освітлення та теплогазопостачання; Том 40 (2022): Вентиляція, освітлення та теплогазопостачання; 43-49
2664-5769
2409-2606
10.32347/2409-2606.2022.40
op_relation http://vothp.knuba.edu.ua/article/view/254951/252196
http://vothp.knuba.edu.ua/article/view/254951
doi:10.32347/2409-2606.2022.40.43-49
op_rights Авторське право (c) 2022 Ю. О. Бурда, Ю.О. Півненко, І.О. Редько, А. Д. Череднік, О. В. Приймак
http://creativecommons.org/licenses/by/4.0
op_rightsnorm CC-BY
op_doi https://doi.org/10.32347/2409-2606.2022.40.43-49
https://doi.org/10.32347/2409-2606.2022.40
container_title Ventilation, Illumination and Heat Gas Supply
container_volume 40
container_start_page 43
op_container_end_page 49
_version_ 1766051843052404736
spelling ftjvothp:oai:ojs.journals.uran.ua:article/254951 2023-05-15T16:59:32+02:00 Numerical simulation of parameters of the thermal scheme of the waste heat recovery system Чисельне моделювання параметрів теплової схеми системи утилізації відхідної теплоти Бурда, Ю. О. Бурда Півненко, Ю.О. Редько, І.О. Череднік, А. Д. Приймак, О. В. 2022-01-17 application/pdf http://vothp.knuba.edu.ua/article/view/254951 https://doi.org/10.32347/2409-2606.2022.40.43-49 ukr ukr Kyiv National University of Construction and Architecture http://vothp.knuba.edu.ua/article/view/254951/252196 http://vothp.knuba.edu.ua/article/view/254951 doi:10.32347/2409-2606.2022.40.43-49 Авторське право (c) 2022 Ю. О. Бурда, Ю.О. Півненко, І.О. Редько, А. Д. Череднік, О. В. Приймак http://creativecommons.org/licenses/by/4.0 CC-BY Ventilation, Illumination and Heat Gas Supply; Vol. 40 (2022): Ventilation, Illumination and Heat-Gas Supply; 43-49 Вентиляція, освітлення та теплогазопостачання; Том 40 (2022): Вентиляція, освітлення та теплогазопостачання; 43-49 2664-5769 2409-2606 10.32347/2409-2606.2022.40 numerical simulation source heat recovery systems hybrid power plant waste heat recovery system чисельне моделювання системи утилізації відхідного тепла геотермальна електростанція гібридні енергетичні установки info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Рецензована Стаття 2022 ftjvothp https://doi.org/10.32347/2409-2606.2022.40.43-49 https://doi.org/10.32347/2409-2606.2022.40 2022-05-05T19:00:04Z Hybrid power plants were first proposed in the development of geothermal deposits in Kamchatka in 1964-66. The unit consists of two circuits, which use a steam turbine with a temperature of up to 200 ° C, with a degree of dryness of water vapor is 5% and a turbine on R12 refrigerant with a capacity of 5 MW. Electric power is 12 MW. Hybrid power plants are also used in metallurgy, cement and glass industries where the heat of exhaust gases with temperatures up to 350 ° C is used. A feature of the design calculations is the uncertainty of changes during the future life of some of the initial data, in particular, specific cost indicators. The available experience and the analysis of approaches to development of flowing parts of turbines have shown that depending on degree of expansion and expenses of working bodies the corresponding type of flowing part is chosen. The calculated studies of the three-circuit thermal circuit (at a discharge temperature of 350 ° C) showed that increasing the parameters of the working fluids is not always rational. Increasing the heat drop on the turbine leads to an increase in the number of turbine stages, but the cost of the working fluid is not enough to abandon the partial drive. The one-dimensional calculation does not show a complete picture of the flow in the flowing part of the turbine, which will have large losses from secondary flows and flows of the working fluid due to the low height of the blades and a high degree of partiality. The results also allow us to conclude that the most appropriate is the implementation of a double-circuit thermal scheme and increase the consumption of working fluids. Increasing the number of circuit elements and possible combinations of their connections, expanding the range of changes in the initial data, factors of systemicity and uncertainty significantly complicate the choice of the final version of the thermal circuit. Гібридні енергетичні установки вперше запропоновано при розробленні геотермальних родовищ Камчатки в 1964-66 роках. Установка складається з двох контурів, у яких використовується турбіна на водяній парі з температурою до 200°С і ступенем сухості 5% і турбіна на хладоні R12 потужністю 5МВт. Електрична потужність становить 12МВт. Гібридні енергетичні установки також використовуються в металургії, цементній і скляній галузях промисловості, де використовується теплота відхідних газів з температурою до 350°С. Особливістю проєктних розрахунків є невизначеність зміни протягом майбутнього терміну експлуатації частини початкових даних, зокрема питомих вартісних показників. Збільшення кількості елементів схем та можливих комбінацій їх з’єднань між собою, розширення діапазонів змін початкових даних, фактори системності та невизначеності значно ускладнюють вибір остаточного варіанта теплової схеми. Розрахункові дослідження показали доцільність використання двоконтурної схеми зі збільшеною витратою органічного робочого тіла порівняно з триконтурною. Це незначно зменшує потужність, однак суттєво спрощує і здешевлює систему. Article in Journal/Newspaper Kamchatka КАМЧАТК* Ventilation, Illumination and Heat-Gas Supply (E-Journal) Ventilation, Illumination and Heat Gas Supply 40 43 49