Bridge over the Jarama River

As the previous bridge connecting Barajas with Paracuellos, on the 5th km of the road joining these villages, had been destroyed, a new one has been built. It is made of steel, has five spans, with a total length of 178.85 ms, has a 7 m wide pavement, and two 1.10 m wide sidewalks. The main feature...

Full description

Bibliographic Details
Published in:Informes de la Construcción
Main Author: Rodríguez-Borlado, Ramiro
Format: Article in Journal/Newspaper
Language:Spanish
Published: Consejo Superior de Investigaciones Científicas 1965
Subjects:
Online Access:https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297
https://doi.org/10.3989/ic.1965.v18.i176.4297
id ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/4297
record_format openpolar
spelling ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/4297 2023-05-15T13:25:27+02:00 Bridge over the Jarama River Puente sobre el río Jarama, España Rodríguez-Borlado, Ramiro 1965-12-31 application/pdf https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297 https://doi.org/10.3989/ic.1965.v18.i176.4297 spa spa Consejo Superior de Investigaciones Científicas https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297/4967 https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297 doi:10.3989/ic.1965.v18.i176.4297 Derechos de autor 1965 Consejo Superior de Investigaciones Científicas (CSIC) https://creativecommons.org/licenses/by/4.0 CC-BY Informes de la Construcción; Vol. 18 No. 176 (1965); 67-74 Informes de la Construcción; Vol. 18 Núm. 176 (1965); 67-74 1988-3234 0020-0883 10.3989/ic.1965.v18.i176 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer reviewed article Artículo revisado por pares 1965 ftjidlc https://doi.org/10.3989/ic.1965.v18.i176.4297 https://doi.org/10.3989/ic.1965.v18.i176 2022-05-25T18:35:12Z As the previous bridge connecting Barajas with Paracuellos, on the 5th km of the road joining these villages, had been destroyed, a new one has been built. It is made of steel, has five spans, with a total length of 178.85 ms, has a 7 m wide pavement, and two 1.10 m wide sidewalks. The main feature of this bridge is a continuous girder, running over the three central spans, one 36.9 m long, and the other two 24.2 m each. This girder has a continuous web, of double T section. It has two halves, 6.2 ms apart, suitably linked together. The depth varies, and increases slightly over the central supports. The central piles rest on new foundations, consisting of caissons. The rest of the old foundations have been preserved. At the central pile the attachment is fixed, and on the two adjacent piles roller bearings have been fitted. At the end supports the deck structure rests on neoprene plates, 12 mm thick. To ensure the stability of the deck slab, a number of adequately spaced dilation joints have been provided. Por haber sido socavado y destruido el puente primitivo, situado en el punto kilométrico 4,800, y con objeto de restablecer el tráfico en la carretera de Barajas a Paracuellos, se ha construido uno nuevo, de estructura metálica, de cinco tramos, con una longitud total de 178,85 m, calzada de 7 m y dos andenes de 1,10 m de anchura cada uno. La parte principal de esta obra consiste en una viga continua que salva los tres tramos centrales, uno de 36,90 m de luz y los dos adyacentes a él de 24,20 m. Esta viga está constituida por dos de alma llena, de sección en forma de doble T, espaciadas a 6,20 m y convenientemente arriostradas entre ellas. Su canto es variable, aumentando linealmente en las proximidades de los dos apoyos centrales, hasta estos mismos. Las pilas de los tres tramos centrales se apoyan sobre nuevos cimientos, realizados con cajones, conservando los demás cimientos existentes. El apoyo sobre la pila central es fijo, y de rodillos el de las dos adyacentes. En los estribos y las dos pilas extremas ... Article in Journal/Newspaper Andenes Informes de la Construcción (E-Journal) Doble ENVELOPE(-62.550,-62.550,-64.667,-64.667) Informes de la Construcción 18 176 67 74
institution Open Polar
collection Informes de la Construcción (E-Journal)
op_collection_id ftjidlc
language Spanish
description As the previous bridge connecting Barajas with Paracuellos, on the 5th km of the road joining these villages, had been destroyed, a new one has been built. It is made of steel, has five spans, with a total length of 178.85 ms, has a 7 m wide pavement, and two 1.10 m wide sidewalks. The main feature of this bridge is a continuous girder, running over the three central spans, one 36.9 m long, and the other two 24.2 m each. This girder has a continuous web, of double T section. It has two halves, 6.2 ms apart, suitably linked together. The depth varies, and increases slightly over the central supports. The central piles rest on new foundations, consisting of caissons. The rest of the old foundations have been preserved. At the central pile the attachment is fixed, and on the two adjacent piles roller bearings have been fitted. At the end supports the deck structure rests on neoprene plates, 12 mm thick. To ensure the stability of the deck slab, a number of adequately spaced dilation joints have been provided. Por haber sido socavado y destruido el puente primitivo, situado en el punto kilométrico 4,800, y con objeto de restablecer el tráfico en la carretera de Barajas a Paracuellos, se ha construido uno nuevo, de estructura metálica, de cinco tramos, con una longitud total de 178,85 m, calzada de 7 m y dos andenes de 1,10 m de anchura cada uno. La parte principal de esta obra consiste en una viga continua que salva los tres tramos centrales, uno de 36,90 m de luz y los dos adyacentes a él de 24,20 m. Esta viga está constituida por dos de alma llena, de sección en forma de doble T, espaciadas a 6,20 m y convenientemente arriostradas entre ellas. Su canto es variable, aumentando linealmente en las proximidades de los dos apoyos centrales, hasta estos mismos. Las pilas de los tres tramos centrales se apoyan sobre nuevos cimientos, realizados con cajones, conservando los demás cimientos existentes. El apoyo sobre la pila central es fijo, y de rodillos el de las dos adyacentes. En los estribos y las dos pilas extremas ...
format Article in Journal/Newspaper
author Rodríguez-Borlado, Ramiro
spellingShingle Rodríguez-Borlado, Ramiro
Bridge over the Jarama River
author_facet Rodríguez-Borlado, Ramiro
author_sort Rodríguez-Borlado, Ramiro
title Bridge over the Jarama River
title_short Bridge over the Jarama River
title_full Bridge over the Jarama River
title_fullStr Bridge over the Jarama River
title_full_unstemmed Bridge over the Jarama River
title_sort bridge over the jarama river
publisher Consejo Superior de Investigaciones Científicas
publishDate 1965
url https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297
https://doi.org/10.3989/ic.1965.v18.i176.4297
long_lat ENVELOPE(-62.550,-62.550,-64.667,-64.667)
geographic Doble
geographic_facet Doble
genre Andenes
genre_facet Andenes
op_source Informes de la Construcción; Vol. 18 No. 176 (1965); 67-74
Informes de la Construcción; Vol. 18 Núm. 176 (1965); 67-74
1988-3234
0020-0883
10.3989/ic.1965.v18.i176
op_relation https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297/4967
https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/4297
doi:10.3989/ic.1965.v18.i176.4297
op_rights Derechos de autor 1965 Consejo Superior de Investigaciones Científicas (CSIC)
https://creativecommons.org/licenses/by/4.0
op_rightsnorm CC-BY
op_doi https://doi.org/10.3989/ic.1965.v18.i176.4297
https://doi.org/10.3989/ic.1965.v18.i176
container_title Informes de la Construcción
container_volume 18
container_issue 176
container_start_page 67
op_container_end_page 74
_version_ 1766385362061492224