Widening of the Angel Custodio bnidge over river the Turia, Valencia

The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and...

Full description

Bibliographic Details
Published in:Informes de la Construcción
Main Authors: Fornés Domenech, J., Prieto Martín, Tomás
Format: Article in Journal/Newspaper
Language:Spanish
Published: Consejo Superior de Investigaciones Científicas 1967
Subjects:
Online Access:https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957
https://doi.org/10.3989/ic.1967.v20.i196.3957
id ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3957
record_format openpolar
spelling ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3957 2023-05-15T13:25:29+02:00 Widening of the Angel Custodio bnidge over river the Turia, Valencia Ensanche del puente del Ángel Custodio sobre el río Turia – Valencia Fornés Domenech, J. Prieto Martín, Tomás 1967-12-31 application/pdf https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 https://doi.org/10.3989/ic.1967.v20.i196.3957 spa spa Consejo Superior de Investigaciones Científicas https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957/4492 https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 doi:10.3989/ic.1967.v20.i196.3957 Derechos de autor 1967 Consejo Superior de Investigaciones Científicas (CSIC) https://creativecommons.org/licenses/by/4.0 CC-BY Informes de la Construcción; Vol. 20 No. 196 (1967); 47-60 Informes de la Construcción; Vol. 20 Núm. 196 (1967); 47-60 1988-3234 0020-0883 10.3989/ic.1967.v20.i196 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer reviewed article Artículo revisado por pares 1967 ftjidlc https://doi.org/10.3989/ic.1967.v20.i196.3957 https://doi.org/10.3989/ic.1967.v20.i196 2022-05-25T18:34:56Z The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and two half circular vaults, of 5 m diameter, at each end of the bridge. The bridge had to maintain its present span arrangement, since it has been widened only on one side. The sinking of piles, and the building of the span supports was completed in six months. The 20 m span beams, on which the reinforced concrete bridge slab rests were to be cast at the site, but after careful study by the site management engineer and the contractors it was decided to built them on the river bed, and lift them by means of a crane, to shorten the construction time. This saves time, and made it unnecessary to close the traffic over the existing bridge; an important factor, since the bridge connects the roads from Valencia, Barcelona and Alicante. The mean time taken in attaching, lifting and placing each beam was 18 minutes. El proyecto comprende el ensanche del puente actual de 15 m de anchura a 31,60 m, quedando con dos vías de 10,40 m, dos andenes de 2,40 m, dos zonas de protección de 0,50 m cada una y una mediana de 5 m. La sección longitudinal consta de seis vanos de 20 m de luz y dos bóvedas de medio punto de 5 m de diámetro situadas en las embocaduras. Había que darle al puente las mismas características actuales, puesto que el ensanche se hace por un solo lado. Pilotaje y alzado de pilas quedaron terminados en 6 meses. Las vigas de 20 m de luz sobre las que apoya el tablero de hormigón armado se preveía debían construirse in situ; pero estudiado conjuntamente por la Dirección de Obra y Empresa Constructora, se determinó prefabricarlas en el lecho del río y elevarlas con grúa para reducir el plazo de ejecución. De esta manera se consigue un ahorro de tiempo de ejecución y, además, no se ha cerrado al tráfico el puente, punto ... Article in Journal/Newspaper Andenes Informes de la Construcción (E-Journal) Lanes ENVELOPE(18.933,18.933,69.617,69.617) Custodio ENVELOPE(-67.233,-67.233,-67.533,-67.533) Informes de la Construcción 20 196 47 60
institution Open Polar
collection Informes de la Construcción (E-Journal)
op_collection_id ftjidlc
language Spanish
description The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and two half circular vaults, of 5 m diameter, at each end of the bridge. The bridge had to maintain its present span arrangement, since it has been widened only on one side. The sinking of piles, and the building of the span supports was completed in six months. The 20 m span beams, on which the reinforced concrete bridge slab rests were to be cast at the site, but after careful study by the site management engineer and the contractors it was decided to built them on the river bed, and lift them by means of a crane, to shorten the construction time. This saves time, and made it unnecessary to close the traffic over the existing bridge; an important factor, since the bridge connects the roads from Valencia, Barcelona and Alicante. The mean time taken in attaching, lifting and placing each beam was 18 minutes. El proyecto comprende el ensanche del puente actual de 15 m de anchura a 31,60 m, quedando con dos vías de 10,40 m, dos andenes de 2,40 m, dos zonas de protección de 0,50 m cada una y una mediana de 5 m. La sección longitudinal consta de seis vanos de 20 m de luz y dos bóvedas de medio punto de 5 m de diámetro situadas en las embocaduras. Había que darle al puente las mismas características actuales, puesto que el ensanche se hace por un solo lado. Pilotaje y alzado de pilas quedaron terminados en 6 meses. Las vigas de 20 m de luz sobre las que apoya el tablero de hormigón armado se preveía debían construirse in situ; pero estudiado conjuntamente por la Dirección de Obra y Empresa Constructora, se determinó prefabricarlas en el lecho del río y elevarlas con grúa para reducir el plazo de ejecución. De esta manera se consigue un ahorro de tiempo de ejecución y, además, no se ha cerrado al tráfico el puente, punto ...
format Article in Journal/Newspaper
author Fornés Domenech, J.
Prieto Martín, Tomás
spellingShingle Fornés Domenech, J.
Prieto Martín, Tomás
Widening of the Angel Custodio bnidge over river the Turia, Valencia
author_facet Fornés Domenech, J.
Prieto Martín, Tomás
author_sort Fornés Domenech, J.
title Widening of the Angel Custodio bnidge over river the Turia, Valencia
title_short Widening of the Angel Custodio bnidge over river the Turia, Valencia
title_full Widening of the Angel Custodio bnidge over river the Turia, Valencia
title_fullStr Widening of the Angel Custodio bnidge over river the Turia, Valencia
title_full_unstemmed Widening of the Angel Custodio bnidge over river the Turia, Valencia
title_sort widening of the angel custodio bnidge over river the turia, valencia
publisher Consejo Superior de Investigaciones Científicas
publishDate 1967
url https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957
https://doi.org/10.3989/ic.1967.v20.i196.3957
long_lat ENVELOPE(18.933,18.933,69.617,69.617)
ENVELOPE(-67.233,-67.233,-67.533,-67.533)
geographic Lanes
Custodio
geographic_facet Lanes
Custodio
genre Andenes
genre_facet Andenes
op_source Informes de la Construcción; Vol. 20 No. 196 (1967); 47-60
Informes de la Construcción; Vol. 20 Núm. 196 (1967); 47-60
1988-3234
0020-0883
10.3989/ic.1967.v20.i196
op_relation https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957/4492
https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957
doi:10.3989/ic.1967.v20.i196.3957
op_rights Derechos de autor 1967 Consejo Superior de Investigaciones Científicas (CSIC)
https://creativecommons.org/licenses/by/4.0
op_rightsnorm CC-BY
op_doi https://doi.org/10.3989/ic.1967.v20.i196.3957
https://doi.org/10.3989/ic.1967.v20.i196
container_title Informes de la Construcción
container_volume 20
container_issue 196
container_start_page 47
op_container_end_page 60
_version_ 1766385570838216704