Widening of the Angel Custodio bnidge over river the Turia, Valencia
The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and...
Published in: | Informes de la Construcción |
---|---|
Main Authors: | , |
Format: | Article in Journal/Newspaper |
Language: | Spanish |
Published: |
Consejo Superior de Investigaciones Científicas
1967
|
Subjects: | |
Online Access: | https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 https://doi.org/10.3989/ic.1967.v20.i196.3957 |
id |
ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3957 |
---|---|
record_format |
openpolar |
spelling |
ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3957 2023-05-15T13:25:29+02:00 Widening of the Angel Custodio bnidge over river the Turia, Valencia Ensanche del puente del Ángel Custodio sobre el río Turia – Valencia Fornés Domenech, J. Prieto Martín, Tomás 1967-12-31 application/pdf https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 https://doi.org/10.3989/ic.1967.v20.i196.3957 spa spa Consejo Superior de Investigaciones Científicas https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957/4492 https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 doi:10.3989/ic.1967.v20.i196.3957 Derechos de autor 1967 Consejo Superior de Investigaciones Científicas (CSIC) https://creativecommons.org/licenses/by/4.0 CC-BY Informes de la Construcción; Vol. 20 No. 196 (1967); 47-60 Informes de la Construcción; Vol. 20 Núm. 196 (1967); 47-60 1988-3234 0020-0883 10.3989/ic.1967.v20.i196 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer reviewed article Artículo revisado por pares 1967 ftjidlc https://doi.org/10.3989/ic.1967.v20.i196.3957 https://doi.org/10.3989/ic.1967.v20.i196 2022-05-25T18:34:56Z The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and two half circular vaults, of 5 m diameter, at each end of the bridge. The bridge had to maintain its present span arrangement, since it has been widened only on one side. The sinking of piles, and the building of the span supports was completed in six months. The 20 m span beams, on which the reinforced concrete bridge slab rests were to be cast at the site, but after careful study by the site management engineer and the contractors it was decided to built them on the river bed, and lift them by means of a crane, to shorten the construction time. This saves time, and made it unnecessary to close the traffic over the existing bridge; an important factor, since the bridge connects the roads from Valencia, Barcelona and Alicante. The mean time taken in attaching, lifting and placing each beam was 18 minutes. El proyecto comprende el ensanche del puente actual de 15 m de anchura a 31,60 m, quedando con dos vías de 10,40 m, dos andenes de 2,40 m, dos zonas de protección de 0,50 m cada una y una mediana de 5 m. La sección longitudinal consta de seis vanos de 20 m de luz y dos bóvedas de medio punto de 5 m de diámetro situadas en las embocaduras. Había que darle al puente las mismas características actuales, puesto que el ensanche se hace por un solo lado. Pilotaje y alzado de pilas quedaron terminados en 6 meses. Las vigas de 20 m de luz sobre las que apoya el tablero de hormigón armado se preveía debían construirse in situ; pero estudiado conjuntamente por la Dirección de Obra y Empresa Constructora, se determinó prefabricarlas en el lecho del río y elevarlas con grúa para reducir el plazo de ejecución. De esta manera se consigue un ahorro de tiempo de ejecución y, además, no se ha cerrado al tráfico el puente, punto ... Article in Journal/Newspaper Andenes Informes de la Construcción (E-Journal) Lanes ENVELOPE(18.933,18.933,69.617,69.617) Custodio ENVELOPE(-67.233,-67.233,-67.533,-67.533) Informes de la Construcción 20 196 47 60 |
institution |
Open Polar |
collection |
Informes de la Construcción (E-Journal) |
op_collection_id |
ftjidlc |
language |
Spanish |
description |
The project comprises the widening of the existing bridge from 15 m to 31.60 m, and providing two traffic lanes, each 10.40 m Wide, and two sidewalks, of 2.40 m width, as well as two protection zones, 0.50 in width, and a central separating section of 5 m. The bridge has 6 spans, each 20 m long, and two half circular vaults, of 5 m diameter, at each end of the bridge. The bridge had to maintain its present span arrangement, since it has been widened only on one side. The sinking of piles, and the building of the span supports was completed in six months. The 20 m span beams, on which the reinforced concrete bridge slab rests were to be cast at the site, but after careful study by the site management engineer and the contractors it was decided to built them on the river bed, and lift them by means of a crane, to shorten the construction time. This saves time, and made it unnecessary to close the traffic over the existing bridge; an important factor, since the bridge connects the roads from Valencia, Barcelona and Alicante. The mean time taken in attaching, lifting and placing each beam was 18 minutes. El proyecto comprende el ensanche del puente actual de 15 m de anchura a 31,60 m, quedando con dos vías de 10,40 m, dos andenes de 2,40 m, dos zonas de protección de 0,50 m cada una y una mediana de 5 m. La sección longitudinal consta de seis vanos de 20 m de luz y dos bóvedas de medio punto de 5 m de diámetro situadas en las embocaduras. Había que darle al puente las mismas características actuales, puesto que el ensanche se hace por un solo lado. Pilotaje y alzado de pilas quedaron terminados en 6 meses. Las vigas de 20 m de luz sobre las que apoya el tablero de hormigón armado se preveía debían construirse in situ; pero estudiado conjuntamente por la Dirección de Obra y Empresa Constructora, se determinó prefabricarlas en el lecho del río y elevarlas con grúa para reducir el plazo de ejecución. De esta manera se consigue un ahorro de tiempo de ejecución y, además, no se ha cerrado al tráfico el puente, punto ... |
format |
Article in Journal/Newspaper |
author |
Fornés Domenech, J. Prieto Martín, Tomás |
spellingShingle |
Fornés Domenech, J. Prieto Martín, Tomás Widening of the Angel Custodio bnidge over river the Turia, Valencia |
author_facet |
Fornés Domenech, J. Prieto Martín, Tomás |
author_sort |
Fornés Domenech, J. |
title |
Widening of the Angel Custodio bnidge over river the Turia, Valencia |
title_short |
Widening of the Angel Custodio bnidge over river the Turia, Valencia |
title_full |
Widening of the Angel Custodio bnidge over river the Turia, Valencia |
title_fullStr |
Widening of the Angel Custodio bnidge over river the Turia, Valencia |
title_full_unstemmed |
Widening of the Angel Custodio bnidge over river the Turia, Valencia |
title_sort |
widening of the angel custodio bnidge over river the turia, valencia |
publisher |
Consejo Superior de Investigaciones Científicas |
publishDate |
1967 |
url |
https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 https://doi.org/10.3989/ic.1967.v20.i196.3957 |
long_lat |
ENVELOPE(18.933,18.933,69.617,69.617) ENVELOPE(-67.233,-67.233,-67.533,-67.533) |
geographic |
Lanes Custodio |
geographic_facet |
Lanes Custodio |
genre |
Andenes |
genre_facet |
Andenes |
op_source |
Informes de la Construcción; Vol. 20 No. 196 (1967); 47-60 Informes de la Construcción; Vol. 20 Núm. 196 (1967); 47-60 1988-3234 0020-0883 10.3989/ic.1967.v20.i196 |
op_relation |
https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957/4492 https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3957 doi:10.3989/ic.1967.v20.i196.3957 |
op_rights |
Derechos de autor 1967 Consejo Superior de Investigaciones Científicas (CSIC) https://creativecommons.org/licenses/by/4.0 |
op_rightsnorm |
CC-BY |
op_doi |
https://doi.org/10.3989/ic.1967.v20.i196.3957 https://doi.org/10.3989/ic.1967.v20.i196 |
container_title |
Informes de la Construcción |
container_volume |
20 |
container_issue |
196 |
container_start_page |
47 |
op_container_end_page |
60 |
_version_ |
1766385570838216704 |