Bridge over the River Ferreira, Spain

The purpose of this bridge is to improve the intersection of the CN.540 road, from Lugo to Orense, with the 547 road. The chosen structural type meets the conditions of quick construction and cheapness that were paramount in this case. The superstructure of the bridge consists of six intermediate pi...

Full description

Bibliographic Details
Published in:Informes de la Construcción
Main Author: Rodríguez Borlado, R.
Format: Article in Journal/Newspaper
Language:Spanish
Published: Consejo Superior de Investigaciones Científicas 1968
Subjects:
Online Access:https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781
https://doi.org/10.3989/ic.1968.v21.i206.3781
id ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3781
record_format openpolar
spelling ftjidlc:oai:informesdeconstruccion.revistas.csic.es:article/3781 2023-05-15T13:25:27+02:00 Bridge over the River Ferreira, Spain Puente sobre el río Ferreira (España) Rodríguez Borlado, R. 1968-12-31 application/pdf https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781 https://doi.org/10.3989/ic.1968.v21.i206.3781 spa spa Consejo Superior de Investigaciones Científicas https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781/4269 https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781 doi:10.3989/ic.1968.v21.i206.3781 Derechos de autor 1968 Consejo Superior de Investigaciones Científicas (CSIC) https://creativecommons.org/licenses/by/4.0 CC-BY Informes de la Construcción; Vol. 21 No. 206 (1968); 113-123 Informes de la Construcción; Vol. 21 Núm. 206 (1968); 113-123 1988-3234 0020-0883 10.3989/ic.1968.v21.i206 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Peer reviewed article Artículo revisado por pares 1968 ftjidlc https://doi.org/10.3989/ic.1968.v21.i206.3781 https://doi.org/10.3989/ic.1968.v21.i206 2022-05-25T18:34:45Z The purpose of this bridge is to improve the intersection of the CN.540 road, from Lugo to Orense, with the 547 road. The chosen structural type meets the conditions of quick construction and cheapness that were paramount in this case. The superstructure of the bridge consists of six intermediate piles, and two abutments, which support seven straight spans with metallic longerons and reinforced concrete deck. The span over the river is 21 m long, and de others, all equal, are 15 m long.The total deck width is 9 m, of which 7 m are for road pavement, and 1 m on each side is reserved for pedestrians sidewalks. The reinforced concrete piles form portal frames, and have circular supports and rectangular dintels. The foundations consist of reinforced concrete blocks, and rest on layers of metamorphic slate into which the foundations penetrate sufficiently deeply to reach sound rock. The project is completed with approach roads to the bridge and the intersections of the roads that converge on the bridge. Su objeto es mejorar la intersección de la CN-540 de Lugo a Orense, con la C-547. La solución estructural elegida responde a las necesidades de rapidez de ejecución y economía exigidas a esta obra. La superestructura del puente la forman seis pilas intermedias y dos estribos que soportan siete tramos rectos con largueros metálicos y losa de hormigón armado. El tramo situado sobre el cauce normal del río tiene una luz de 21 m, y los tramos restantes son todos ellos iguales y de 15 m de luz. El ancho total del tablero es de 9 m, de los que corresponden 7 a la calzada y 1 m a cada uno de los andenes laterales. Las pilas de hormigón armado son aporticadas con soportes circulares y dintel rectangular. La cimentación, a base de macizos de hormigón armado, se apoya sobre una capa de pizarras metamórficas en la que se ha profundizado hasta alcanzar la zona sana. Completan la obra los accesos al puente y las intersecciones de las carreteras que afluyen a él. Article in Journal/Newspaper Andenes Informes de la Construcción (E-Journal) Ferreira ENVELOPE(-62.050,-62.050,-64.600,-64.600) Ancho ENVELOPE(-60.783,-60.783,-62.467,-62.467) Intersección ENVELOPE(-61.416,-61.416,-63.933,-63.933) Informes de la Construcción 21 206 113 123
institution Open Polar
collection Informes de la Construcción (E-Journal)
op_collection_id ftjidlc
language Spanish
description The purpose of this bridge is to improve the intersection of the CN.540 road, from Lugo to Orense, with the 547 road. The chosen structural type meets the conditions of quick construction and cheapness that were paramount in this case. The superstructure of the bridge consists of six intermediate piles, and two abutments, which support seven straight spans with metallic longerons and reinforced concrete deck. The span over the river is 21 m long, and de others, all equal, are 15 m long.The total deck width is 9 m, of which 7 m are for road pavement, and 1 m on each side is reserved for pedestrians sidewalks. The reinforced concrete piles form portal frames, and have circular supports and rectangular dintels. The foundations consist of reinforced concrete blocks, and rest on layers of metamorphic slate into which the foundations penetrate sufficiently deeply to reach sound rock. The project is completed with approach roads to the bridge and the intersections of the roads that converge on the bridge. Su objeto es mejorar la intersección de la CN-540 de Lugo a Orense, con la C-547. La solución estructural elegida responde a las necesidades de rapidez de ejecución y economía exigidas a esta obra. La superestructura del puente la forman seis pilas intermedias y dos estribos que soportan siete tramos rectos con largueros metálicos y losa de hormigón armado. El tramo situado sobre el cauce normal del río tiene una luz de 21 m, y los tramos restantes son todos ellos iguales y de 15 m de luz. El ancho total del tablero es de 9 m, de los que corresponden 7 a la calzada y 1 m a cada uno de los andenes laterales. Las pilas de hormigón armado son aporticadas con soportes circulares y dintel rectangular. La cimentación, a base de macizos de hormigón armado, se apoya sobre una capa de pizarras metamórficas en la que se ha profundizado hasta alcanzar la zona sana. Completan la obra los accesos al puente y las intersecciones de las carreteras que afluyen a él.
format Article in Journal/Newspaper
author Rodríguez Borlado, R.
spellingShingle Rodríguez Borlado, R.
Bridge over the River Ferreira, Spain
author_facet Rodríguez Borlado, R.
author_sort Rodríguez Borlado, R.
title Bridge over the River Ferreira, Spain
title_short Bridge over the River Ferreira, Spain
title_full Bridge over the River Ferreira, Spain
title_fullStr Bridge over the River Ferreira, Spain
title_full_unstemmed Bridge over the River Ferreira, Spain
title_sort bridge over the river ferreira, spain
publisher Consejo Superior de Investigaciones Científicas
publishDate 1968
url https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781
https://doi.org/10.3989/ic.1968.v21.i206.3781
long_lat ENVELOPE(-62.050,-62.050,-64.600,-64.600)
ENVELOPE(-60.783,-60.783,-62.467,-62.467)
ENVELOPE(-61.416,-61.416,-63.933,-63.933)
geographic Ferreira
Ancho
Intersección
geographic_facet Ferreira
Ancho
Intersección
genre Andenes
genre_facet Andenes
op_source Informes de la Construcción; Vol. 21 No. 206 (1968); 113-123
Informes de la Construcción; Vol. 21 Núm. 206 (1968); 113-123
1988-3234
0020-0883
10.3989/ic.1968.v21.i206
op_relation https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781/4269
https://informesdelaconstruccion.revistas.csic.es/index.php/informesdelaconstruccion/article/view/3781
doi:10.3989/ic.1968.v21.i206.3781
op_rights Derechos de autor 1968 Consejo Superior de Investigaciones Científicas (CSIC)
https://creativecommons.org/licenses/by/4.0
op_rightsnorm CC-BY
op_doi https://doi.org/10.3989/ic.1968.v21.i206.3781
https://doi.org/10.3989/ic.1968.v21.i206
container_title Informes de la Construcción
container_volume 21
container_issue 206
container_start_page 113
op_container_end_page 123
_version_ 1766385358382039040