08019-011 Staff Beaver Creek Final Report

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach...

Full description

Bibliographic Details
Format: Report
Language:English
Published: 2012
Subjects:
Online Access:http://publications.iowa.gov/18312/
http://publications.iowa.gov/18312/1/8019-011%20StaffBeaverCreek%20FINAL%20Report.pdf
id ftiowapo:oai:publications.iowa.gov:18312
record_format openpolar
spelling ftiowapo:oai:publications.iowa.gov:18312 2023-05-15T15:41:06+02:00 08019-011 Staff Beaver Creek Final Report 2012-08-17 pdf http://publications.iowa.gov/18312/ http://publications.iowa.gov/18312/1/8019-011%20StaffBeaverCreek%20FINAL%20Report.pdf en eng http://publications.iowa.gov/18312/1/8019-011%20StaffBeaverCreek%20FINAL%20Report.pdf (2012) 08019-011 Staff Beaver Creek Final Report. Agriculture and Land Stewardship Water quality Watersheds Departmental Report NonPeerReviewed 2012 ftiowapo 2022-07-11T11:45:11Z Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams. Report Beaver Creek State Library of Iowa: Iowa Publications Online (IOP)
institution Open Polar
collection State Library of Iowa: Iowa Publications Online (IOP)
op_collection_id ftiowapo
language English
topic Water quality
Watersheds
spellingShingle Water quality
Watersheds
08019-011 Staff Beaver Creek Final Report
topic_facet Water quality
Watersheds
description Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.
format Report
title 08019-011 Staff Beaver Creek Final Report
title_short 08019-011 Staff Beaver Creek Final Report
title_full 08019-011 Staff Beaver Creek Final Report
title_fullStr 08019-011 Staff Beaver Creek Final Report
title_full_unstemmed 08019-011 Staff Beaver Creek Final Report
title_sort 08019-011 staff beaver creek final report
publishDate 2012
url http://publications.iowa.gov/18312/
http://publications.iowa.gov/18312/1/8019-011%20StaffBeaverCreek%20FINAL%20Report.pdf
genre Beaver Creek
genre_facet Beaver Creek
op_relation http://publications.iowa.gov/18312/1/8019-011%20StaffBeaverCreek%20FINAL%20Report.pdf
(2012) 08019-011 Staff Beaver Creek Final Report. Agriculture and Land Stewardship