Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation

Source: https://erdc-library.erdc.dren.mil/jspui/ The Charleston Harbor model reproduced the Ashley, Cooper, and Wando Rivers, and a portion of the Atlantic Ocean. The model was of fixed-bed construction and was equipped with all the necessary appurtenances for accurate reproduction and measurement...

Full description

Bibliographic Details
Main Authors: Benson, Howard A., Bobb, William H.
Other Authors: United States. Army. Corps of Engineers. Savannah District.
Format: Report
Language:English
Published: U.S. Army Engineer Research and Development Center (ERDC) 1976
Subjects:
Online Access:https://hdl.handle.net/20.500.11970/112119
id fthenry:oai:henry.baw.de:20.500.11970/112119
record_format openpolar
spelling fthenry:oai:henry.baw.de:20.500.11970/112119 2023-07-30T04:02:29+02:00 Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation Benson, Howard A. Bobb, William H. United States. Army. Corps of Engineers. Savannah District. 1976 application/pdf https://hdl.handle.net/20.500.11970/112119 eng eng U.S. Army Engineer Research and Development Center (ERDC) Hydraulics Laboratory (HL) Vicksburg, Mississippi http://hdl.handle.net/11681/10816 Miscellaneous Paper H-76-5 United States. Army. Corps of Engineers. Savannah District. (Hg.) (1976): Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation. Vicksburg, Mississippi: U.S. Army Engineer Research and Development Center (ERDC) (Miscellaneous Paper, H-76-5). https://hdl.handle.net/20.500.11970/112119 Alle Rechte vorbehalten Ingenieurwissenschaften (620) Bushy Park Area Charleston Harbor Cooper River Santee River South Carolina River diversion Estuary Estuaries Salt water intrusion Salt water encroachment Salinity Water quality Water supply Tides Tidal currents Hydraulic model Report Published Version 1976 fthenry https://doi.org/20.500.11970/112119 2023-07-16T23:07:46Z Source: https://erdc-library.erdc.dren.mil/jspui/ The Charleston Harbor model reproduced the Ashley, Cooper, and Wando Rivers, and a portion of the Atlantic Ocean. The model was of fixed-bed construction and was equipped with all the necessary appurtenances for accurate reproduction and measurement of tides, tidal currents, salinity intrusion, and other significant phenomena of the prototype. Construction of the Santee-Cooper power project in 1940-1942 included diversion of flow from the Santee River into the Cooper River watershed. Average freshwater flow into Cooper River was increased from 72 cfs to 15,000 cfs, and maintenance dredging in Charleston rapidly increased from about 180,000 cu yd per year up to 10,000,000 cu yd today. Prior studies led to the conclusion that rediversion of a major portion of the Santee River flow would result in a substantial reduction in maintenance dredging in Charleston Harbor. The amount of Santee River flow to leave diverted into Cooper River became a critical value with respect to power generation at Pinopolis, water quality in Charleston Harbor, and the prevention of saltwater intrusion into the Back River Reservoir constructed to supply freshwater for the Bushy Park industrial area and the City of Charleston. The results of previous studies indicated that a weekly average flow of 3000 cfs would be satisfactory with respect to reduced maintenance dredging. The power requirements could also be satisfactorily met with a minimum weekly average flow of 3000 cfs. A detailed study involving various weekly schedules for release of the 3000 cfs on conditions in the upper reaches of Cooper River and the Bushy Park Reservoir was considered necessary. Hydraulic and salinity tests were made for six weekly release schedules from the Pinopolis power plant. The first involved ·the continuous release of the existing weekly average freshwater discharge at the Pinopolis power generating station of 15,600 cfs, which is referred to as Schedule A. Schedules B, C, and D all involved release of ... Report Back River Henry - Hydraulic Engineering Repository
institution Open Polar
collection Henry - Hydraulic Engineering Repository
op_collection_id fthenry
language English
topic Ingenieurwissenschaften (620)
Bushy Park Area
Charleston Harbor
Cooper River
Santee River
South Carolina
River diversion
Estuary
Estuaries
Salt water intrusion
Salt water encroachment
Salinity
Water quality
Water supply
Tides
Tidal currents
Hydraulic model
spellingShingle Ingenieurwissenschaften (620)
Bushy Park Area
Charleston Harbor
Cooper River
Santee River
South Carolina
River diversion
Estuary
Estuaries
Salt water intrusion
Salt water encroachment
Salinity
Water quality
Water supply
Tides
Tidal currents
Hydraulic model
Benson, Howard A.
Bobb, William H.
Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
topic_facet Ingenieurwissenschaften (620)
Bushy Park Area
Charleston Harbor
Cooper River
Santee River
South Carolina
River diversion
Estuary
Estuaries
Salt water intrusion
Salt water encroachment
Salinity
Water quality
Water supply
Tides
Tidal currents
Hydraulic model
description Source: https://erdc-library.erdc.dren.mil/jspui/ The Charleston Harbor model reproduced the Ashley, Cooper, and Wando Rivers, and a portion of the Atlantic Ocean. The model was of fixed-bed construction and was equipped with all the necessary appurtenances for accurate reproduction and measurement of tides, tidal currents, salinity intrusion, and other significant phenomena of the prototype. Construction of the Santee-Cooper power project in 1940-1942 included diversion of flow from the Santee River into the Cooper River watershed. Average freshwater flow into Cooper River was increased from 72 cfs to 15,000 cfs, and maintenance dredging in Charleston rapidly increased from about 180,000 cu yd per year up to 10,000,000 cu yd today. Prior studies led to the conclusion that rediversion of a major portion of the Santee River flow would result in a substantial reduction in maintenance dredging in Charleston Harbor. The amount of Santee River flow to leave diverted into Cooper River became a critical value with respect to power generation at Pinopolis, water quality in Charleston Harbor, and the prevention of saltwater intrusion into the Back River Reservoir constructed to supply freshwater for the Bushy Park industrial area and the City of Charleston. The results of previous studies indicated that a weekly average flow of 3000 cfs would be satisfactory with respect to reduced maintenance dredging. The power requirements could also be satisfactorily met with a minimum weekly average flow of 3000 cfs. A detailed study involving various weekly schedules for release of the 3000 cfs on conditions in the upper reaches of Cooper River and the Bushy Park Reservoir was considered necessary. Hydraulic and salinity tests were made for six weekly release schedules from the Pinopolis power plant. The first involved ·the continuous release of the existing weekly average freshwater discharge at the Pinopolis power generating station of 15,600 cfs, which is referred to as Schedule A. Schedules B, C, and D all involved release of ...
author2 United States. Army. Corps of Engineers. Savannah District.
format Report
author Benson, Howard A.
Bobb, William H.
author_facet Benson, Howard A.
Bobb, William H.
author_sort Benson, Howard A.
title Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
title_short Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
title_full Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
title_fullStr Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
title_full_unstemmed Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation
title_sort cooper river rediversion project, bushy park water supply tests: hydraulic model investigation
publisher U.S. Army Engineer Research and Development Center (ERDC)
publishDate 1976
url https://hdl.handle.net/20.500.11970/112119
genre Back River
genre_facet Back River
op_relation http://hdl.handle.net/11681/10816
Miscellaneous Paper
H-76-5
United States. Army. Corps of Engineers. Savannah District. (Hg.) (1976): Cooper River Rediversion Project, Bushy Park Water Supply Tests: Hydraulic Model Investigation. Vicksburg, Mississippi: U.S. Army Engineer Research and Development Center (ERDC) (Miscellaneous Paper, H-76-5).
https://hdl.handle.net/20.500.11970/112119
op_rights Alle Rechte vorbehalten
op_doi https://doi.org/20.500.11970/112119
_version_ 1772813294865743872