Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system

This paper proposes a methodology that integrates quantitative and qualitative assessment. The methodology proposed combines conventional cost-benefit analysis (CBA) with multi-criteria analysis (MCA). The CBA methodology, based on welfare theory, assures that the project with the highest welfare fo...

Full description

Bibliographic Details
Main Author: Jensen, Anders Vestergaard
Format: Other/Unknown Material
Language:English
Published: 2008
Subjects:
Online Access:https://orbit.dtu.dk/en/publications/9705a38c-9a9f-4e37-824a-309cbafe4fcd
id ftdtupubl:oai:pure.atira.dk:publications/9705a38c-9a9f-4e37-824a-309cbafe4fcd
record_format openpolar
spelling ftdtupubl:oai:pure.atira.dk:publications/9705a38c-9a9f-4e37-824a-309cbafe4fcd 2023-05-15T16:30:15+02:00 Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system Jensen, Anders Vestergaard 2008 https://orbit.dtu.dk/en/publications/9705a38c-9a9f-4e37-824a-309cbafe4fcd eng eng info:eu-repo/semantics/restrictedAccess Jensen , A V , Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system , 2008 , Sound/Visual production (digital) . /dk/atira/pure/sustainabledevelopmentgoals/life_on_land SDG 15 - Life on Land other 2008 ftdtupubl 2022-08-14T07:56:00Z This paper proposes a methodology that integrates quantitative and qualitative assessment. The methodology proposed combines conventional cost-benefit analysis (CBA) with multi-criteria analysis (MCA). The CBA methodology, based on welfare theory, assures that the project with the highest welfare for society is ranked uppermost. To compare the different impacts, it is necessary to have a common monetary unit. Theoretically, all benefits and all costs should be accounted for in socio-economic cost-benefit analysis. However, this is far from in practical the general case due to difficulties in a valuating all the criteria in monetary terms. Thus CBA does not meet the need for a comprehensive evaluation, for which reason MCA is introduced to overcome this problem. Not only does MCA provides an opportunity to include non-market impacts in the analysis, but MCA also provides a framework for breaking down a problem into its constituent parts in order to better understand the problem and consequently arrive at a decision. However, while MCA opens up for the possibility to include non-market impacts, it does not provide the decision makers with guidance combining the CBA with MCA. In the paper different methods for combining cost-benefit analysis and multi-criteria analysis are examined and compared and a software system is presented. The software system gives the decision makers some possibilities regarding preference analysis, sensitivity and risk analysis. The aim of the software is to facilitate a straightforward method to support decision making involving both quantitative and qualitative impacts. An outcome of this is that the methodology and the results on this basis are easily understood by the different stakeholders, which is seen as important. The methodology and software system are demonstrated by examining the decision problem of choosing between alternatives for a new airport to service the capital of Greenland, Nuuk. Three different alternatives are examined ranging in costs from 90m USD to 400m USD. ... Other/Unknown Material Greenland Nuuk Technical University of Denmark: DTU Orbit Greenland Nuuk ENVELOPE(-52.150,-52.150,68.717,68.717)
institution Open Polar
collection Technical University of Denmark: DTU Orbit
op_collection_id ftdtupubl
language English
topic /dk/atira/pure/sustainabledevelopmentgoals/life_on_land
SDG 15 - Life on Land
spellingShingle /dk/atira/pure/sustainabledevelopmentgoals/life_on_land
SDG 15 - Life on Land
Jensen, Anders Vestergaard
Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
topic_facet /dk/atira/pure/sustainabledevelopmentgoals/life_on_land
SDG 15 - Life on Land
description This paper proposes a methodology that integrates quantitative and qualitative assessment. The methodology proposed combines conventional cost-benefit analysis (CBA) with multi-criteria analysis (MCA). The CBA methodology, based on welfare theory, assures that the project with the highest welfare for society is ranked uppermost. To compare the different impacts, it is necessary to have a common monetary unit. Theoretically, all benefits and all costs should be accounted for in socio-economic cost-benefit analysis. However, this is far from in practical the general case due to difficulties in a valuating all the criteria in monetary terms. Thus CBA does not meet the need for a comprehensive evaluation, for which reason MCA is introduced to overcome this problem. Not only does MCA provides an opportunity to include non-market impacts in the analysis, but MCA also provides a framework for breaking down a problem into its constituent parts in order to better understand the problem and consequently arrive at a decision. However, while MCA opens up for the possibility to include non-market impacts, it does not provide the decision makers with guidance combining the CBA with MCA. In the paper different methods for combining cost-benefit analysis and multi-criteria analysis are examined and compared and a software system is presented. The software system gives the decision makers some possibilities regarding preference analysis, sensitivity and risk analysis. The aim of the software is to facilitate a straightforward method to support decision making involving both quantitative and qualitative impacts. An outcome of this is that the methodology and the results on this basis are easily understood by the different stakeholders, which is seen as important. The methodology and software system are demonstrated by examining the decision problem of choosing between alternatives for a new airport to service the capital of Greenland, Nuuk. Three different alternatives are examined ranging in costs from 90m USD to 400m USD. ...
format Other/Unknown Material
author Jensen, Anders Vestergaard
author_facet Jensen, Anders Vestergaard
author_sort Jensen, Anders Vestergaard
title Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
title_short Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
title_full Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
title_fullStr Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
title_full_unstemmed Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system
title_sort multi-dimensional project evaluation: combining cost-benefit analysis and multi-criteria analysis with the cosima software system
publishDate 2008
url https://orbit.dtu.dk/en/publications/9705a38c-9a9f-4e37-824a-309cbafe4fcd
long_lat ENVELOPE(-52.150,-52.150,68.717,68.717)
geographic Greenland
Nuuk
geographic_facet Greenland
Nuuk
genre Greenland
Nuuk
genre_facet Greenland
Nuuk
op_source Jensen , A V , Multi-dimensional project evaluation: Combining cost-benefit analysis and multi-criteria analysis with the COSIMA software system , 2008 , Sound/Visual production (digital) .
op_rights info:eu-repo/semantics/restrictedAccess
_version_ 1766019975890337792