Upgrade of Storm Water System Environmental Assessment Langley Air Force Base, Virginia
Langley AFB proposes to construct a new storm sewer system to alleviate the flooding along the flightline and in the hangar area along Danforth Avenue. Additionally, the project proposes building a new pump station to discharge the collected runoff into the Back River. The new storm water system wou...
Main Authors: | , , , , , , , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA611137 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA611137 |
Summary: | Langley AFB proposes to construct a new storm sewer system to alleviate the flooding along the flightline and in the hangar area along Danforth Avenue. Additionally, the project proposes building a new pump station to discharge the collected runoff into the Back River. The new storm water system would be designed to handle the 10-year, 1-hour rain event This Environmental Assessment (EA) analyzes the impacts associated with construction and operation of the proposed action alignment, the Northeast Outfall alternative, and the no-action alternative. |
---|