Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska

The United States Air Force (USAF) is proposing to construct an outdoor running track located on Eielson AFB, Alaska. The quarter-mile track will be asphalt-covered and will include signage to designate start and finish points for Air Force fitness testing. Currently, a linear stretch of roadway on...

Full description

Bibliographic Details
Other Authors: FIGHTER WING (354TH) EIELSON AFB AK
Format: Text
Language:English
Published: 2011
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA604409
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604409
id ftdtic:ADA604409
record_format openpolar
spelling ftdtic:ADA604409 2023-05-15T14:57:51+02:00 Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska FIGHTER WING (354TH) EIELSON AFB AK 2011-06 text/html http://www.dtic.mil/docs/citations/ADA604409 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604409 en eng http://www.dtic.mil/docs/citations/ADA604409 Approved for public release; distribution is unlimited. DTIC Civil Engineering Environmental Health and Safety *AIR FORCE FACILITIES *ASPHALT *ENVIRONMENTAL ASSESSMENT *PAVEMENTS *PHYSICAL FITNESS AIR FORCE AIR FORCE TRAINING ARCTIC REGIONS CONSTRUCTION FLIGHT TESTING FLOODS GRASSES OUTDOOR SITES SOILS UNITED STATES VEGETATION Text 2011 ftdtic 2016-02-24T15:31:47Z The United States Air Force (USAF) is proposing to construct an outdoor running track located on Eielson AFB, Alaska. The quarter-mile track will be asphalt-covered and will include signage to designate start and finish points for Air Force fitness testing. Currently, a linear stretch of roadway on Arctic Avenue is utilized for fitness testing and does not meet Air Force Instruction (AFI) 36-2905, Fitness Program, effective 1 July 2010 guidelines. The Proposed Action is to construct an outdoor running track adjacent to the Baker Field House. The project site will be excavated to remove existing sod and filled above existing grade and base flood level with reclaimed asphalt pavement from the Golf taxiway. The quarter-mile track will be covered in two inches of asphalt and will include signage to designate start and finish points for Air Force fitness testing. Topsoil and seed will be added once the track is built. Approximately 3.4 acres of vegetation and 1,400 cubic yards of soils would be impacted with this alternative. Text Arctic Alaska Defense Technical Information Center: DTIC Technical Reports database Arctic Eielson ENVELOPE(-61.500,-61.500,-70.583,-70.583) The Baker ENVELOPE(-54.765,-54.765,49.667,49.667)
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Civil Engineering
Environmental Health and Safety
*AIR FORCE FACILITIES
*ASPHALT
*ENVIRONMENTAL ASSESSMENT
*PAVEMENTS
*PHYSICAL FITNESS
AIR FORCE
AIR FORCE TRAINING
ARCTIC REGIONS
CONSTRUCTION
FLIGHT TESTING
FLOODS
GRASSES
OUTDOOR
SITES
SOILS
UNITED STATES
VEGETATION
spellingShingle Civil Engineering
Environmental Health and Safety
*AIR FORCE FACILITIES
*ASPHALT
*ENVIRONMENTAL ASSESSMENT
*PAVEMENTS
*PHYSICAL FITNESS
AIR FORCE
AIR FORCE TRAINING
ARCTIC REGIONS
CONSTRUCTION
FLIGHT TESTING
FLOODS
GRASSES
OUTDOOR
SITES
SOILS
UNITED STATES
VEGETATION
Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
topic_facet Civil Engineering
Environmental Health and Safety
*AIR FORCE FACILITIES
*ASPHALT
*ENVIRONMENTAL ASSESSMENT
*PAVEMENTS
*PHYSICAL FITNESS
AIR FORCE
AIR FORCE TRAINING
ARCTIC REGIONS
CONSTRUCTION
FLIGHT TESTING
FLOODS
GRASSES
OUTDOOR
SITES
SOILS
UNITED STATES
VEGETATION
description The United States Air Force (USAF) is proposing to construct an outdoor running track located on Eielson AFB, Alaska. The quarter-mile track will be asphalt-covered and will include signage to designate start and finish points for Air Force fitness testing. Currently, a linear stretch of roadway on Arctic Avenue is utilized for fitness testing and does not meet Air Force Instruction (AFI) 36-2905, Fitness Program, effective 1 July 2010 guidelines. The Proposed Action is to construct an outdoor running track adjacent to the Baker Field House. The project site will be excavated to remove existing sod and filled above existing grade and base flood level with reclaimed asphalt pavement from the Golf taxiway. The quarter-mile track will be covered in two inches of asphalt and will include signage to designate start and finish points for Air Force fitness testing. Topsoil and seed will be added once the track is built. Approximately 3.4 acres of vegetation and 1,400 cubic yards of soils would be impacted with this alternative.
author2 FIGHTER WING (354TH) EIELSON AFB AK
format Text
title Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
title_short Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
title_full Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
title_fullStr Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
title_full_unstemmed Environmental Assessment for the Construction of an Outdoor Running Track at Eielson Air Force Base, Alaska
title_sort environmental assessment for the construction of an outdoor running track at eielson air force base, alaska
publishDate 2011
url http://www.dtic.mil/docs/citations/ADA604409
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604409
long_lat ENVELOPE(-61.500,-61.500,-70.583,-70.583)
ENVELOPE(-54.765,-54.765,49.667,49.667)
geographic Arctic
Eielson
The Baker
geographic_facet Arctic
Eielson
The Baker
genre Arctic
Alaska
genre_facet Arctic
Alaska
op_source DTIC
op_relation http://www.dtic.mil/docs/citations/ADA604409
op_rights Approved for public release; distribution is unlimited.
_version_ 1766329954823307264