Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska

NAME OF PROPOSED ACTION. Upgrade and Construction of the Eielson Air Force Base (Eielson AFB) Rail Line. The Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) were prepared in accordance with the requirements of the National Environmental Policy Act (NEPA) and its implementi...

Full description

Bibliographic Details
Other Authors: TUTKA LLC ANCHORAGE AK
Format: Text
Language:English
Published: 2012
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA604039
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604039
id ftdtic:ADA604039
record_format openpolar
spelling ftdtic:ADA604039 2023-05-15T15:17:18+02:00 Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska TUTKA LLC ANCHORAGE AK 2012-03 text/html http://www.dtic.mil/docs/citations/ADA604039 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604039 en eng http://www.dtic.mil/docs/citations/ADA604039 Approved for public release; distribution is unlimited. DTIC Surface Transportation and Equipment Logistics Military Facilities and Supplies *AIR FORCE FACILITIES *ENVIRONMENTAL ASSESSMENT *FUELS *RAIL TRANSPORTATION AIR FORCE CONSTRUCTION ENVIRONMENTAL IMPACT ENVIRONMENTS IMPACT NATURAL RESOURCES POLICIES PROTECTION REGULATIONS REQUIREMENTS WATER RESOURCES EIELSON AIR FORCE BASE(ALASKA) Text 2012 ftdtic 2016-02-24T15:29:08Z NAME OF PROPOSED ACTION. Upgrade and Construction of the Eielson Air Force Base (Eielson AFB) Rail Line. The Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) were prepared in accordance with the requirements of the National Environmental Policy Act (NEPA) and its implementing regulations (Council on Environmental Quality, 40 CFR 1500-1508). The Finding of No Practicable Alternative (FONPA) was prepared in accordance with the Secretary of the Air Force Order 791.1 and Executive Order 11990 (May 24, 1977), Protection of Wetlands. DESCRIPTION OF THE PROPOSED ACTION AND NO ACTION ALTERNATIVE. The Proposed Action would support fuel needs based on Eielson AFB's Operations Plan (OPLAN). The OPLAN requires a fuel off loading capability to support a daily delivery requirement in an austere arctic environment. In order to support the mission of Eielson AFB, a viable secondary means of fuel supply is necessary. Eielson AFB is currently only capable of receiving a limited amount of fuel by rail car and truck and both are currently inadequate to support the required delivery rate as outlined in the OPLAN. The affected rail line extends from the Central Heating and Power Plant (CHPP) to the off load fuel area (Mullins Pit Road) which has not been upgraded since 1950 and is severely degraded. The rail line in this area is a mixture of 70, 75, and 90 pound rail line joined by cpmpromising bars to splice the different lane weights. Over 300 Linear Meters (LM) of rail line south of E-11 has been ruled unserviceable, reducing the capacity to receive railcar shipments in large quantity. Additionally there is only one line near the E-2/E-11 fuel farms for receiving railcars. A second line, complete with switches and road crossings, is required to store and transfer railcars while shipments are being unloaded and delivered. Text Arctic Alaska Defense Technical Information Center: DTIC Technical Reports database Arctic Eielson ENVELOPE(-61.500,-61.500,-70.583,-70.583)
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Surface Transportation and Equipment
Logistics
Military Facilities and Supplies
*AIR FORCE FACILITIES
*ENVIRONMENTAL ASSESSMENT
*FUELS
*RAIL TRANSPORTATION
AIR FORCE
CONSTRUCTION
ENVIRONMENTAL IMPACT
ENVIRONMENTS
IMPACT
NATURAL RESOURCES
POLICIES
PROTECTION
REGULATIONS
REQUIREMENTS
WATER RESOURCES
EIELSON AIR FORCE BASE(ALASKA)
spellingShingle Surface Transportation and Equipment
Logistics
Military Facilities and Supplies
*AIR FORCE FACILITIES
*ENVIRONMENTAL ASSESSMENT
*FUELS
*RAIL TRANSPORTATION
AIR FORCE
CONSTRUCTION
ENVIRONMENTAL IMPACT
ENVIRONMENTS
IMPACT
NATURAL RESOURCES
POLICIES
PROTECTION
REGULATIONS
REQUIREMENTS
WATER RESOURCES
EIELSON AIR FORCE BASE(ALASKA)
Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
topic_facet Surface Transportation and Equipment
Logistics
Military Facilities and Supplies
*AIR FORCE FACILITIES
*ENVIRONMENTAL ASSESSMENT
*FUELS
*RAIL TRANSPORTATION
AIR FORCE
CONSTRUCTION
ENVIRONMENTAL IMPACT
ENVIRONMENTS
IMPACT
NATURAL RESOURCES
POLICIES
PROTECTION
REGULATIONS
REQUIREMENTS
WATER RESOURCES
EIELSON AIR FORCE BASE(ALASKA)
description NAME OF PROPOSED ACTION. Upgrade and Construction of the Eielson Air Force Base (Eielson AFB) Rail Line. The Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) were prepared in accordance with the requirements of the National Environmental Policy Act (NEPA) and its implementing regulations (Council on Environmental Quality, 40 CFR 1500-1508). The Finding of No Practicable Alternative (FONPA) was prepared in accordance with the Secretary of the Air Force Order 791.1 and Executive Order 11990 (May 24, 1977), Protection of Wetlands. DESCRIPTION OF THE PROPOSED ACTION AND NO ACTION ALTERNATIVE. The Proposed Action would support fuel needs based on Eielson AFB's Operations Plan (OPLAN). The OPLAN requires a fuel off loading capability to support a daily delivery requirement in an austere arctic environment. In order to support the mission of Eielson AFB, a viable secondary means of fuel supply is necessary. Eielson AFB is currently only capable of receiving a limited amount of fuel by rail car and truck and both are currently inadequate to support the required delivery rate as outlined in the OPLAN. The affected rail line extends from the Central Heating and Power Plant (CHPP) to the off load fuel area (Mullins Pit Road) which has not been upgraded since 1950 and is severely degraded. The rail line in this area is a mixture of 70, 75, and 90 pound rail line joined by cpmpromising bars to splice the different lane weights. Over 300 Linear Meters (LM) of rail line south of E-11 has been ruled unserviceable, reducing the capacity to receive railcar shipments in large quantity. Additionally there is only one line near the E-2/E-11 fuel farms for receiving railcars. A second line, complete with switches and road crossings, is required to store and transfer railcars while shipments are being unloaded and delivered.
author2 TUTKA LLC ANCHORAGE AK
format Text
title Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
title_short Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
title_full Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
title_fullStr Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
title_full_unstemmed Environmental Assessment for the Upgrade and Construction of the Eielson Air Force Base Rail Line, Eielson Air Force Base, Alaska
title_sort environmental assessment for the upgrade and construction of the eielson air force base rail line, eielson air force base, alaska
publishDate 2012
url http://www.dtic.mil/docs/citations/ADA604039
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA604039
long_lat ENVELOPE(-61.500,-61.500,-70.583,-70.583)
geographic Arctic
Eielson
geographic_facet Arctic
Eielson
genre Arctic
Alaska
genre_facet Arctic
Alaska
op_source DTIC
op_relation http://www.dtic.mil/docs/citations/ADA604039
op_rights Approved for public release; distribution is unlimited.
_version_ 1766347559421345792