McMurdo Consolidated Airfields Study: Phase I, Basis of Design

The US Antarctic Program has an air support system that includes as many as three airfields, the Sea Ice Runway, Williams Field, and Pegasus Runway, to support air operations into and out of McMurdo Station, Antarctica (MCM). These airfields are located on sea ice, snow and glacial ice on the McMurd...

Full description

Bibliographic Details
Main Authors: Haehnel, Robert B, Bjella, Kevin, Knuth, Margaret A, Barna, Lynette
Other Authors: ENGINEER RESEARCH AND DEVELOPMENT CENTER HANOVER NH COLD REGIONS RESEARCH AND ENGINEERING LAB
Format: Text
Language:English
Published: 2013
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA576164
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA576164
_version_ 1821762107506425856
author Haehnel, Robert B
Bjella, Kevin
Knuth, Margaret A
Barna, Lynette
author2 ENGINEER RESEARCH AND DEVELOPMENT CENTER HANOVER NH COLD REGIONS RESEARCH AND ENGINEERING LAB
author_facet Haehnel, Robert B
Bjella, Kevin
Knuth, Margaret A
Barna, Lynette
author_sort Haehnel, Robert B
collection Defense Technical Information Center: DTIC Technical Reports database
description The US Antarctic Program has an air support system that includes as many as three airfields, the Sea Ice Runway, Williams Field, and Pegasus Runway, to support air operations into and out of McMurdo Station, Antarctica (MCM). These airfields are located on sea ice, snow and glacial ice on the McMurdo Sound, and the Ross Ice Shelf. The airfields are configured to support both wheeled and ski-equipped aircraft during the Austral summer from late August until early March. This study explores the feasibility of consolidating air operations at MCM to a single airfield complex (SAC). This should improve airfield operation efficiency by reducing cost and redundancy of facilities and personnel across simultaneously operating multiple airfields. As part of this study, a conceptual design for a SAC is proposed. Our work shows that implementation of a SAC is feasible and can likely be provided for the same cost or less than existing operations. However, more detailed design in the areas of 1) runway location and configuration, 2) fuel delivery, 3) potable water supply, 4) waste handling, and 5) updating of contingency plans for adverse and warm weather need to be provided. The original document contains color images.
format Text
genre Antarc*
Antarctic
Antarctica
Ice Shelf
McMurdo Sound
Ross Ice Shelf
Ross Sea
Sea ice
genre_facet Antarc*
Antarctic
Antarctica
Ice Shelf
McMurdo Sound
Ross Ice Shelf
Ross Sea
Sea ice
geographic Antarctic
Austral
Ice Runway
McMurdo Sound
McMurdo Station
Ross Ice Shelf
Ross Sea
Williams Field
geographic_facet Antarctic
Austral
Ice Runway
McMurdo Sound
McMurdo Station
Ross Ice Shelf
Ross Sea
Williams Field
id ftdtic:ADA576164
institution Open Polar
language English
long_lat ENVELOPE(166.469,166.469,-77.854,-77.854)
ENVELOPE(166.667,166.667,-77.850,-77.850)
ENVELOPE(166.967,166.967,-77.867,-77.867)
op_collection_id ftdtic
op_relation http://www.dtic.mil/docs/citations/ADA576164
op_rights Approved for public release; distribution is unlimited.
op_source DTIC
publishDate 2013
record_format openpolar
spelling ftdtic:ADA576164 2025-01-16T19:30:03+00:00 McMurdo Consolidated Airfields Study: Phase I, Basis of Design Haehnel, Robert B Bjella, Kevin Knuth, Margaret A Barna, Lynette ENGINEER RESEARCH AND DEVELOPMENT CENTER HANOVER NH COLD REGIONS RESEARCH AND ENGINEERING LAB 2013-01 text/html http://www.dtic.mil/docs/citations/ADA576164 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA576164 en eng http://www.dtic.mil/docs/citations/ADA576164 Approved for public release; distribution is unlimited. DTIC Terminal Flight Facilities *ANTARCTIC REGIONS *FEASIBILITY STUDIES *LANDING FIELDS AIRCRAFT MAINTENANCE COSTS ROSS SEA SAFETY SEA ICE AIR OPERATIONS AIRFIELDS CONSOLIDATION MCMURDO STATION PEGASUS RUNWAY SEA ICE RUNWAY SINGLE AIRFIELD COMPLEX US ANTARCTIC PROGRAM WILLIAMS FIELD Text 2013 ftdtic 2016-02-24T10:45:42Z The US Antarctic Program has an air support system that includes as many as three airfields, the Sea Ice Runway, Williams Field, and Pegasus Runway, to support air operations into and out of McMurdo Station, Antarctica (MCM). These airfields are located on sea ice, snow and glacial ice on the McMurdo Sound, and the Ross Ice Shelf. The airfields are configured to support both wheeled and ski-equipped aircraft during the Austral summer from late August until early March. This study explores the feasibility of consolidating air operations at MCM to a single airfield complex (SAC). This should improve airfield operation efficiency by reducing cost and redundancy of facilities and personnel across simultaneously operating multiple airfields. As part of this study, a conceptual design for a SAC is proposed. Our work shows that implementation of a SAC is feasible and can likely be provided for the same cost or less than existing operations. However, more detailed design in the areas of 1) runway location and configuration, 2) fuel delivery, 3) potable water supply, 4) waste handling, and 5) updating of contingency plans for adverse and warm weather need to be provided. The original document contains color images. Text Antarc* Antarctic Antarctica Ice Shelf McMurdo Sound Ross Ice Shelf Ross Sea Sea ice Defense Technical Information Center: DTIC Technical Reports database Antarctic Austral Ice Runway ENVELOPE(166.469,166.469,-77.854,-77.854) McMurdo Sound McMurdo Station ENVELOPE(166.667,166.667,-77.850,-77.850) Ross Ice Shelf Ross Sea Williams Field ENVELOPE(166.967,166.967,-77.867,-77.867)
spellingShingle Terminal Flight Facilities
*ANTARCTIC REGIONS
*FEASIBILITY STUDIES
*LANDING FIELDS
AIRCRAFT MAINTENANCE
COSTS
ROSS SEA
SAFETY
SEA ICE
AIR OPERATIONS
AIRFIELDS
CONSOLIDATION
MCMURDO STATION
PEGASUS RUNWAY
SEA ICE RUNWAY
SINGLE AIRFIELD COMPLEX
US ANTARCTIC PROGRAM
WILLIAMS FIELD
Haehnel, Robert B
Bjella, Kevin
Knuth, Margaret A
Barna, Lynette
McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title_full McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title_fullStr McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title_full_unstemmed McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title_short McMurdo Consolidated Airfields Study: Phase I, Basis of Design
title_sort mcmurdo consolidated airfields study: phase i, basis of design
topic Terminal Flight Facilities
*ANTARCTIC REGIONS
*FEASIBILITY STUDIES
*LANDING FIELDS
AIRCRAFT MAINTENANCE
COSTS
ROSS SEA
SAFETY
SEA ICE
AIR OPERATIONS
AIRFIELDS
CONSOLIDATION
MCMURDO STATION
PEGASUS RUNWAY
SEA ICE RUNWAY
SINGLE AIRFIELD COMPLEX
US ANTARCTIC PROGRAM
WILLIAMS FIELD
topic_facet Terminal Flight Facilities
*ANTARCTIC REGIONS
*FEASIBILITY STUDIES
*LANDING FIELDS
AIRCRAFT MAINTENANCE
COSTS
ROSS SEA
SAFETY
SEA ICE
AIR OPERATIONS
AIRFIELDS
CONSOLIDATION
MCMURDO STATION
PEGASUS RUNWAY
SEA ICE RUNWAY
SINGLE AIRFIELD COMPLEX
US ANTARCTIC PROGRAM
WILLIAMS FIELD
url http://www.dtic.mil/docs/citations/ADA576164
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA576164