Evaluation of a Pneumatic Guy-Line Deicing Boot
During the two winter field seasons of 1986-88, a 3-m-long pneumatic cable deicing boot was tested and evaluated by CRREL at the summit of Mt. Washington, New Hampshire. Favorable results from this pilot study led to the development of a longer (14-m) pneumatic boot. This longer boot, which was used...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Text |
Language: | English |
Published: |
1992
|
Subjects: | |
Online Access: | http://www.dtic.mil/docs/citations/ADA252013 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA252013 |
Summary: | During the two winter field seasons of 1986-88, a 3-m-long pneumatic cable deicing boot was tested and evaluated by CRREL at the summit of Mt. Washington, New Hampshire. Favorable results from this pilot study led to the development of a longer (14-m) pneumatic boot. This longer boot, which was used to entirely encase one of the guy lines supporting a 9-m-high tower, was evaluated at the summit of Mt. Washington during the 1987-88 icing season. The performance of both pneumatic cable deicing boots during a variety of icing conditions indicates that this simple, cost-effective method of ice prevention on guy wires may be suitable for practical application. |
---|