Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.

Tracor Marine conducted precision bathymetric surveys at Autec Sites 1, 2 and 7 during May and June, 1983. Using the LCU 1647 as a survey platform, the survey equipment consisted of an EDO Model 4077 Narrow Beam Towed Bathymetric System, a Decca Trisponder Navigation System and an HP 9825 - based da...

Full description

Bibliographic Details
Other Authors: TRACOR MARINE PORT EVERGLADES FL OCEAN TECHNOLOGY DIV
Format: Text
Language:English
Published: 1983
Subjects:
Online Access:http://www.dtic.mil/docs/citations/ADA168744
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA168744
id ftdtic:ADA168744
record_format openpolar
spelling ftdtic:ADA168744 2023-05-15T17:33:06+02:00 Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7. TRACOR MARINE PORT EVERGLADES FL OCEAN TECHNOLOGY DIV 1983-06-10 text/html http://www.dtic.mil/docs/citations/ADA168744 http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA168744 en eng http://www.dtic.mil/docs/citations/ADA168744 APPROVED FOR PUBLIC RELEASE DTIC AND NTIS Physical and Dynamic Oceanography *BATHYMETRY *HYDROGRAPHIC SURVEYING SITES DEPTH NAVIGATION SURVEYS PRECISION DATA ACQUISITION NORTH ATLANTIC OCEAN BOTTOM CONTOURS BAHAMA ISLANDS ACOUSTIC RANGES AUTEC(Atlantic Undersea Test and Evaluation Center) Text 1983 ftdtic 2016-02-21T02:01:45Z Tracor Marine conducted precision bathymetric surveys at Autec Sites 1, 2 and 7 during May and June, 1983. Using the LCU 1647 as a survey platform, the survey equipment consisted of an EDO Model 4077 Narrow Beam Towed Bathymetric System, a Decca Trisponder Navigation System and an HP 9825 - based data acquisition system. The survey at Site 1, consisting of five sounding lines running perpendicular to the bottom contours, was completed on May 30. The measurements at Site 2 were completed on May 31 and consisted of ten perpendicular runs. On June 3 at Site 7, three perpendicular lines were completed with two 2nm by 1nm grids developed at the eastern and westernmost areas. Aside from minor navigational problems and delays on June 3, no difficulties were encountered in the conduct of this survey, and the project was completed several days ahead of schedule. Text North Atlantic Defense Technical Information Center: DTIC Technical Reports database
institution Open Polar
collection Defense Technical Information Center: DTIC Technical Reports database
op_collection_id ftdtic
language English
topic Physical and Dynamic Oceanography
*BATHYMETRY
*HYDROGRAPHIC SURVEYING
SITES
DEPTH
NAVIGATION
SURVEYS
PRECISION
DATA ACQUISITION
NORTH ATLANTIC OCEAN
BOTTOM
CONTOURS
BAHAMA ISLANDS
ACOUSTIC RANGES
AUTEC(Atlantic Undersea Test and Evaluation Center)
spellingShingle Physical and Dynamic Oceanography
*BATHYMETRY
*HYDROGRAPHIC SURVEYING
SITES
DEPTH
NAVIGATION
SURVEYS
PRECISION
DATA ACQUISITION
NORTH ATLANTIC OCEAN
BOTTOM
CONTOURS
BAHAMA ISLANDS
ACOUSTIC RANGES
AUTEC(Atlantic Undersea Test and Evaluation Center)
Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
topic_facet Physical and Dynamic Oceanography
*BATHYMETRY
*HYDROGRAPHIC SURVEYING
SITES
DEPTH
NAVIGATION
SURVEYS
PRECISION
DATA ACQUISITION
NORTH ATLANTIC OCEAN
BOTTOM
CONTOURS
BAHAMA ISLANDS
ACOUSTIC RANGES
AUTEC(Atlantic Undersea Test and Evaluation Center)
description Tracor Marine conducted precision bathymetric surveys at Autec Sites 1, 2 and 7 during May and June, 1983. Using the LCU 1647 as a survey platform, the survey equipment consisted of an EDO Model 4077 Narrow Beam Towed Bathymetric System, a Decca Trisponder Navigation System and an HP 9825 - based data acquisition system. The survey at Site 1, consisting of five sounding lines running perpendicular to the bottom contours, was completed on May 30. The measurements at Site 2 were completed on May 31 and consisted of ten perpendicular runs. On June 3 at Site 7, three perpendicular lines were completed with two 2nm by 1nm grids developed at the eastern and westernmost areas. Aside from minor navigational problems and delays on June 3, no difficulties were encountered in the conduct of this survey, and the project was completed several days ahead of schedule.
author2 TRACOR MARINE PORT EVERGLADES FL OCEAN TECHNOLOGY DIV
format Text
title Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
title_short Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
title_full Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
title_fullStr Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
title_full_unstemmed Autec Cable Route Survey, Andros Island, Bahamas Sites, 1, 2 and 7.
title_sort autec cable route survey, andros island, bahamas sites, 1, 2 and 7.
publishDate 1983
url http://www.dtic.mil/docs/citations/ADA168744
http://oai.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA168744
genre North Atlantic
genre_facet North Atlantic
op_source DTIC AND NTIS
op_relation http://www.dtic.mil/docs/citations/ADA168744
op_rights APPROVED FOR PUBLIC RELEASE
_version_ 1766131493810208768